2018-21868. Safety Zone; Barters Island Bridge, Back River, Barters Island, ME  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of proposed rulemaking.

    SUMMARY:

    The Coast Guard proposes to establish a safety zone for the navigable waters within a 50 yard radius from the center point of the Barters Island Bridge, on the Back River, ME, approximately 4.6 miles north of the mouth of the waterway. When enforced, this proposed rulemaking would prohibit persons and vessels from being in the safety zone during bridge replacement operations unless authorized by the Captain of the Port Northern New England or a designated representative, which could pose as imminent hazard to persons and vessels operating in the area. The safety zone is necessary to protect personnel, vessels, and the marine environment from potential hazards created by the demolition, subsequent removal, and replacement of the Barters Island Bridge and a temporary bridge. We invite your comments on this proposed rulemaking.

    DATES:

    Comments and related material must be received by the Coast Guard on or before November 8, 2018.

    ADDRESSES:

    You may submit comments identified by docket number USCG-2018-0843 using the Federal eRulemaking Portal at https://www.regulations.gov. See the “Public Participation and Request for Comments” portion of the SUPPLEMENTARY INFORMATION section for further instructions on submitting comments.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions about this proposed rulemaking, call or email LT Matthew Odom, Waterways Management Division, U.S. Coast Guard Sector Northern New England, telephone 207-347-5015, email Matthew.T.Odom@uscg.mil.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Table of Abbreviations

    CFR Code of Federal Regulations

    COTP Captain of the Port

    DHS Department of Homeland Security

    FR Federal Register

    NPRM Notice of proposed rulemaking

    § Section

    U.S.C. United States Code

    MEDOT Maine Department of Transportation

    II. Background, Purpose, and Legal Basis

    On April 27, 2018, the Maine Department of Transportation (MEDOT) applied for a bridge construction permit for Barter's Island Bridge with the Coast Guard. On June 22, 2018, the Coast Guard issued Public Notice 1-164, published it on the USCG Navigation Center website, and solicited comments through July 23, 2018. Three comments were received in response to the public notice: One commenter requested the project be stopped if any human remains, archaeological properties or other items of historical importance are unearthed and we report the findings. A second commenter notified us this project will not affect any Penobscot cultural/historic properties or interests and had no objection. A third commenter stated that Tennessee Gas Pipeline currently does not have facilities within the area. There were no statements of objection.

    On August 22, 2018, MEDOT requested by letter that the Coast Guard impose waterway restrictions on the Back River around the Barters Island Bridge between Hodgdon Island and Barters Island in Boothbay Harbor in support of the bridge improvements. The project includes the replacement of the swing span of the bridge and the existing center pier. A temporary fixed bridge will be used to maintain vehicle traffic during construction of the new bridge. The temporary fixed bridge will Start Printed Page 50546reduce the vertical clearance of the channel to 6.8 feet mean high water (MHW) from approximately November 1, 2019 through May 31, 2020. On or about June 1, 2020, the new swing bridge is expected to be operating with unlimited clearance in the open position. The anticipated date for removal of the temporary bridge is August 2020. A bridge protection system and bridge lighting will be installed as part of the new bridge. Captain of the Port (COTP) Northern New England has determined that hazards associated with the bridge replacement project will be a safety concern for anyone within a 50-yard radius from the center point of the of the Barters Island bridge. It is anticipated that the Back River will be closed because of this safety zone for a total of 85 non-continuous days.

    The purpose of this rulemaking is to protect personnel, vessels and the marine environment from potential hazards created during the replacement of the Barters Island Bridge, on the Back River, ME. The Coast Guard proposes this rulemaking under authority in 33 U.S.C. 1231.

    III. Discussion of Proposed Rule

    The COTP Northern New England proposes to establish a safety zone from December 1, 2018 through January 31, 2021. The safety zone would cover all navigable waters within a 50 yard radius of the center point of the Barters Island Bridge on Back River connecting Barter Island and Hodgdon Island, approximately 4.6 north of the mouth of the waterway. The duration of the zone is intended to ensure the safety of vessels, the maritime public, construction workers, and these navigable waters during the replacement of the Barters Island Bridge over the main channel of the Back River. During times of enforcement, no vessel or person would be permitted to enter the safety zone without obtaining permission from the COTP or a designated representative. The regulatory text we are proposing appears at the end of this document.

    The Coast Guard will notify the public and local mariners of this safety zone through appropriate means, which may include, but are not limited to, publication in the Federal Register, the Local Notice to Mariners, and Broadcast Notice to Mariners via marine Channel 16 (VHF-FM) in advance of any enforcement.

    IV. Regulatory Analyses

    We developed this proposed rule after considering numerous statutes and Executive orders related to rulemaking. Below we summarize our analyses based on a number of these statutes and Executive orders and we discuss First Amendment rights of protestors.

    A. Regulatory Planning and Review

    Executive Orders 12866 and 13563 direct agencies to assess the costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits. Executive Order 13771 directs agencies to control regulatory costs through a budgeting process. This NPRM has not been designated a “significant regulatory action,” under Executive Order 12866. Accordingly, the NPRM has not been reviewed by the Office of Management and Budget (OMB), and pursuant to OMB guidance it is exempt from the requirements of Executive Order 13771.

    This regulatory action determination is based on the following reasons: (1) The safety zone only impacts a small designated area of Back River, (2) the safety zone will only be enforced during certain construction activities necessitating a full waterway closure for safety purposes, which is only anticipated to occur on 85 days over a two year period, or if there is an emergency, (3) persons or vessels desiring to enter the safety zone may do so with permission from the COTP Northern New England or a designated representative, (4) the Coast Guard will notify the public of the enforcement of this rule via appropriate means, such as via Local Notice to Mariners and Broadcast Notice to Mariners via marine Channel 16 (VHF-FM).

    B. Impact on Small Entities

    The Regulatory Flexibility Act of 1980, 5 U.S.C. 601-612, as amended, requires Federal agencies to consider the potential impact of regulations on small entities during rulemaking. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000. The Coast Guard certifies under 5 U.S.C. 605(b) that this proposed rule would not have a significant economic impact on a substantial number of small entities.

    While some owners or operators of vessels intending to transit the safety zone may be small entities, for the reasons stated in section IV.A above, this proposed rule would not have a significant economic impact on any vessel owner or operator.

    If you think that your business, organization, or governmental jurisdiction qualifies as a small entity and that this rule would have a significant economic impact on it, please submit a comment (see ADDRESSES) explaining why you think it qualifies and how and to what degree this rule would economically affect it.

    Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we want to assist small entities in understanding this proposed rule. If the rule would affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please contact the person listed in the FOR FURTHER INFORMATION CONTACT section. The Coast Guard will not retaliate against small entities that question or complain about this proposed rule or any policy or action of the Coast Guard.

    C. Collection of Information

    This proposed rule would not call for a new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

    D. Federalism and Indian Tribal Governments

    A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this proposed rule under that Order and have determined that it is consistent with the fundamental federalism principles and preemption requirements described in Executive Order 13132.

    Also, this proposed rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it would not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes. If you believe this proposed rule has implications for federalism or Indian tribes, please contact the person listed in the FOR FURTHER INFORMATION CONTACT section.

    E. Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions Start Printed Page 50547that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this proposed rule would not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.

    F. Environment

    We have analyzed this proposed rule under Department of Homeland Security Directive 023-01 and Commandant Instruction M16475.1D, which guide the Coast Guard in complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321-4370f), and have made a preliminary determination that this action is one of a category of actions that do not individually or cumulatively have a significant effect on the human environment. This proposed rule involves a safety zone that would prohibit entry within a 50 yards radius from the center point of the Barters Island Bridge during its removal and replacement over an approximately two year period. Normally such actions are categorically excluded from further review under paragraph L60 (a) of Appendix A, Table 1 of DHS Instruction Manual 023-01-001-01, Rev. 01. A preliminary Record of Environmental Consideration for Categorically Excluded Actions is available in the docket where indicated under ADDRESSES. We seek any comments or information that may lead to the discovery of a significant environmental impact from this proposed rule.

    G. Protest Activities

    The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to contact the person listed in the FOR FURTHER INFORMATION CONTACT section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places, or vessels.

    V. Public Participation and Request for Comments

    We view public participation as essential to effective rulemaking, and will consider all comments and material received during the comment period. Your comment can help shape the outcome of this rulemaking. If you submit a comment, please include the docket number for this rulemaking, indicate the specific section of this document to which each comment applies, and provide a reason for each suggestion or recommendation.

    We encourage you to submit comments through the Federal eRulemaking Portal at http://www.regulations.gov. If your material cannot be submitted using http://www.regulations.gov,, contact the person in the FOR FURTHER INFORMATION CONTACT section of this document for alternate instructions.

    We accept anonymous comments. All comments received will be posted without change to https://www.regulations.gov and will include any personal information you have provided. For more about privacy and the docket, visit https://www.regulations.gov/​privacyNotice.

    Documents mentioned in this NPRM as being available in the docket, and all public comments, will be in our online docket at https://www.regulations.gov and can be viewed by following that website's instructions. Additionally, if you go to the online docket and sign up for email alerts, you will be notified when comments are posted or a final rule is published.

    Start List of Subjects

    List of Subjects in 33 CFR Part 165

    • Harbors
    • Marine safety
    • Navigation (water)
    • Reporting and recordkeeping requirements
    • Security measures
    • Waterways
    End List of Subjects

    For the reasons discussed in the preamble, the Coast Guard proposes to amend 33 CFR part 165 as follows:

    Start Part

    PART 165—REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS

    End Part Start Amendment Part

    1. The authority citation for part 165 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 33 U.S.C 1231; 50 U.S.C 191; 33 CFR 1.05-1, 6.04-1, 6.04-6, and 160.5; Department of Homeland Security Delegation No. 0170.1.

    End Authority Start Amendment Part

    2. Add § 165.T01-0843 to read as follows:

    End Amendment Part
    Safety Zone; Barters Island Bridge, Back River, Barters Island, ME.

    (a) Location. The following area is a safety zone: All navigable waters on Back River, within a 50-yard radius of the center point of the Barters Island Bridge that spans Back River between Barters Island and Hodgdon Island in position 43°52′51″ N, 069°40′19″ W (NAD 83).

    (b) Definitions. As used in this section:

    Designated representative means any Coast Guard commissioned, warrant, petty officer, or any federal, state, or local law enforcement officer who has been designated by the Captain of the Port (COTP) Northern New England, to act on his or her behalf. The designated representative may be on an official patrol vessel or may be on shore and will communicate with vessels via VHF-FM radio or loudhailer. In addition, members of the Coast Guard Auxiliary may be present to inform vessel operators of this regulation.

    Official patrol vessels means any Coast Guard, Coast Guard Auxiliary, state, or local law enforcement vessels assigned or approved by the COTP Northern New England to enforce this section.

    (c) Effective and enforcement period. This rule will be effective from 12:01 a.m. on December 1, 2018, through 11:59 p.m. on January 31, 2021, but will only be enforced during operations on replacement of the Barters Island Bridge or other instances which may cause which may cause a hazard to navigation, or when deemed necessary by the Captain of the Port (COTP), Northern New England.

    (d) Regulations. The general regulations contained in 33 CFR 165.23, as well as the following regulations, apply:

    (1) No person or vessel may enter or remain in this safety zone without the permission of the COTP or the COTP's designated representative.

    (2) To obtain permission required by this regulation, individuals may reach the COTP or the COTP's designated representative via Channel 16 (VHF-FM) or (207) 741-5465 (Sector Northern New England Command Center).

    (3) During periods of enforcement, any person or vessel permitted to enter the safety zone shall comply with the directions and orders of the COTP or the COTP's designated representative.

    (4) During periods of enforcement, upon being hailed by a U.S. Coast Guard vessel by siren, radio, flashing lights, or other means, the operator of a vessel within the zone must proceed as directed. Any person or vessel within the safety zone shall exit the zone when directed by the COTP or the COTP's designated representative.

    Start Signature

    Dated: October 2, 2018.

    B.J. LeFebvre,

    Captain, U.S. Coast Guard, Captain of the Port, Sector Northern New England.

    End Signature End Supplemental Information

    [FR Doc. 2018-21868 Filed 10-5-18; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Published:
10/09/2018
Department:
Coast Guard
Entry Type:
Proposed Rule
Action:
Notice of proposed rulemaking.
Document Number:
2018-21868
Dates:
Comments and related material must be received by the Coast Guard on or before November 8, 2018.
Pages:
50545-50547 (3 pages)
Docket Numbers:
Docket Number USCG-2018-0843
RINs:
1625-AA00: Safety Zone Regulations
RIN Links:
https://www.federalregister.gov/regulations/1625-AA00/safety-zone-regulations
Topics:
Harbors, Marine safety, Navigation (water), Reporting and recordkeeping requirements, Security measures, Waterways
PDF File:
2018-21868.pdf
Supporting Documents:
» DHS National Environmental Policy Act Record of Environmental Consideration for Categorically Excluded Actions
» Boothbay, MI USCG Waterway Restriction Letter 8.22.2018
» D01PN1-164 Barters Island Back River
CFR: (1)
33 CFR 165.T01-0843