-
Take notice that on October 2, 2024, Equitrans, L.P. (Equitrans) requested that the Commission grant an extension of time, until January 31, 2025, to complete its Well 3660 Plug and Abandonment Project (Project) located in Greene County, Pennsylvania as authorized in the Order Denying Protests and Authorizing Abandonment (Order).[1] The Order authorized Equitrans to proceed with the Project under its Part 157 blanket certificate. By Rule, the Project should have been completed within one year of the Order date, or by October 23, 2024.
Equitrans states that, pursuant to a court order in ongoing litigation involving Well 3660 and pending in the Court of Common Pleas of Greene County, Pennsylvania (Court), Equitrans was required to preserve physical evidence, which includes the well. Equitrans received an order from the Court lifting the preservation order on September 9, 2024. Equitrans asserts that it is finalizing written protocols for plugging and abandonment to submit to the parties to the litigation prior to commencement of plugging activities. Thus, Equitrans requests an extension of time, until January 31, 2025, to complete the abandonment activities.
This notice establishes a 15-calendar day intervention and comment period deadline. Any person wishing to comment on Equitrans' request for an extension of time may do so. No reply comments or answers will be considered. If you wish to obtain legal status by becoming a party to the proceedings for this request, you should, on or before the comment date stated below, file a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act (NGA) (18 CFR 157.10).
As a matter of practice, the Commission itself generally acts on requests for extensions of time to complete construction for NGA facilities when such requests are contested before order issuance. For those extension requests that are contested,[2] the Commission will aim to issue an order acting on the request within 45 days.[3] The Commission will address all arguments relating to whether the applicant has demonstrated there is good cause to grant the extension.[4] The Commission will not consider arguments that re-litigate the issuance of the certificate order, including whether the Commission properly found the project to be in the public convenience and necessity and whether the Commission's environmental analysis for the certificate complied with the National Environmental Policy Act (NEPA).[5] At the time a pipeline requests an extension of time, orders on certificates of public convenience and necessity are final and the Commission will not re-litigate their issuance.[6] The Director of the Office of Energy Projects, or his or her designee, will act on all of those extension requests that are uncontested.
In addition to publishing the full text of this document in the Federal Register , the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission's Home Page ( http://www.ferc.gov). From the Commission's Home Page on the internet, this information is available on eLibrary. The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field.
User assistance is available for eLibrary and the Commission's website during normal business hours from FERC Online Support at (202) 502-6652 (toll free at 1-866-208-3676) or email at ferconlinesupport@ferc.gov, or the Public Reference Room at (202) 502-8371, TTY (202) 502-8659. Email the Public Reference Room at public.referenceroom@ferc.gov.
The Commission strongly encourages electronic filings of comments in lieu of paper using the “eFile” link at http://www.ferc.gov. In lieu of electronic filing, you may submit a paper copy which must reference the Project docket number.
To file via USPS: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426.
To file via any other courier: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
The Commission's Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to ( print page 81898) contact OPP at (202) 502-6595 or OPP@ferc.gov.
Comment Date: 5:00 p.m. Eastern Time on October 18, 2024.
Dated: October 3, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
Footnotes
1. Equitrans, L.P., 185 FERC ¶ 61,040 (2023).
Back to Citation2. Contested proceedings are those where an intervenor disputes any material issue of the filing. 18 CFR 385.2201(c)(1).
Back to Citation3. Algonquin Gas Transmission, LLC, 170 FERC ¶ 61,144, at P 40 (2020).
Back to Citation4. Id. at P 40.
Back to Citation5. Similarly, the Commission will not re-litigate the issuance of an NGA section 3 authorization, including whether a proposed project is not inconsistent with the public interest and whether the Commission's environmental analysis for the permit order complied with NEPA.
Back to Citation6. Algonquin Gas Transmission, LLC, 170 FERC ¶ 61,144, at P 40 (2020).
Back to Citation[FR Doc. 2024-23388 Filed 10-8-24; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 10/09/2024
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2024-23388
- Dates:
- 5:00 p.m. Eastern Time on October 18, 2024.
- Pages:
- 81897-81898 (2 pages)
- Docket Numbers:
- Docket No. CP21-455-001
- PDF File:
- 2024-23388.pdf