96-28034. Transcontinental Gas Pipe Line Corporation; Notice of Proposed Changes in FERC Gas Tariff  

  • [Federal Register Volume 61, Number 213 (Friday, November 1, 1996)]
    [Notices]
    [Page 56532]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-28034]
    
    
    
    [[Page 56532]]
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. TM97-2-29-000]
    
    
    Transcontinental Gas Pipe Line Corporation; Notice of Proposed 
    Changes in FERC Gas Tariff
    
    October 28, 1996.
        Take notice that on October 22, 1996 Transcontinental Gas Pipe Line 
    Corporation (Transco) tendered for filing certain revised tariff sheets 
    to its FERC Gas Tariff, Third Revised Volume No. 1 which tariff sheets 
    are enumerated in Appendix A attached to the filing.
        Transco states that the purpose of the instant filing is to track 
    rate changes attributable to (1) storage service purchased from 
    National Fuel Gas Supply Corporation (National Fuel) under its Rate 
    Schedule SS-1, the costs of which are included in the rates and charges 
    payable under Transco's Rate Schedules LSS and SS-2, (2) storage 
    service purchased from CNG Transmission Corporation (CNG) under its 
    Rate Schedule GSS the costs of which are included in the rates and 
    charges payable under Transco's Rate Schedules GSS and LSS, (3) 
    transportation service purchased from National Fuel under its Rate 
    Schedule X-54 the costs of which are included in the rates and charges 
    payable under Transco's Rate Schedule SS-2, (4) transportation service 
    purchased from National Fuel under its rate schedule X-58 the costs of 
    which are included in the rates and charges payable under Transco's 
    Niagara Import Point Project--System Expansion (NIPPs-SE) 
    transportation service, (5) transportation service purchased from Texas 
    Gas Transmission Corporation (Texas Gas) under its Rate Schedule FT the 
    costs of which are included in the rates and charges payable under 
    Transco's Rate Schedule FT-NT, (6) transportation service purchased 
    from CNG under its Rate Schedule X-74 the costs of which are included 
    in the rates and charges payable under Transco's Rate Schedule FT-NT, 
    (7) storage service purchased from Texas Eastern Transmission 
    Corporation (TETCO) under its Rate Schedule X-28 the costs of which are 
    included in the rates and charges payable under Transco's Rate Schedule 
    S-2, and (8) storage service purchased from North Penn Gas Company 
    (North Penn) under its Rate Schedule S the costs of which are included 
    in the rates and charges payable under Transco's Rate Schedule SS-1. 
    The tracking filing is being made pursuant to Section 4 of Transco's 
    Rate Schedule LSS, Section 4 of Transco's Rate Schedule SS-2, Section 
    8.01(i) of Transco's NIPPs-SE Rate Schedule X-315, Section 4 of 
    Transco's Rate Schedule FT-NT, Section 3 of Transco's Rate Schedule 
    GSS, Section 26 of the General Terms and Conditions of Transco's Volume 
    No. 1 Tariff and Section 5 of Transco's Rate Schedule SS-1.
        Transco states that included in Appendices B through G attached to 
    the filing are explanations of the rate changes and details regarding 
    the computation of the revised Rate Schedule LSS, GSS, SS-2, FT-NT, 
    NIPPs-SE (X-315), S-2 and SS-1 rates.
        Transco states that copies of the filing are being mailed to each 
    of its LSS, GSS, SS-2, FT-NT, NIPPs-SE (X-315), S-2 and SS-1 customers 
    and interested State Commissions.
        Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, Washington, D.C. 20426, in 
    accordance with Sections 385.214 and 385.211 of the Commission's Rules 
    and Regulations. All such motions or protests must be filed as provided 
    in Section 154.210 of the Commission's Regulations. Protests will be 
    considered by the Commission in determining the appropriate action to 
    be taken, but will not serve to make protestants parties to the 
    proceeding. Any person wishing to become a party must file a motion to 
    intervene. Copies of this filing are on file with the Commission and 
    are available for public inspection in the Public Reference Room.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-28034 Filed 10-31-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/01/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-28034
Pages:
56532-56532 (1 pages)
Docket Numbers:
Docket No. TM97-2-29-000
PDF File:
96-28034.pdf