96-28115. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 61, Number 213 (Friday, November 1, 1996)]
    [Notices]
    [Page 56541]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-28115]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-5474-5]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared October 7, 1996 through 
    October 11, 1996 pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 564-7167.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 5, 1996 (61 FR 
    15251).
    
    Draft EISs
    
        ERP No. D-DOE-K05218-00, Rating EC2, Sierra Nevada Region 2004 
    Power Marketing Program, Implementation, 1,480 megawatts (MW) Power 
    from the Central Valley and Washoe Project, NV and CA.
        Summary: EPA expressed environmental concerns and requested 
    additional information to establish the limited effect of hydropower 
    operations downstream of facilities, the basis for estimated future 
    peak power demand, the role of demand-side management, and the 
    relationship of the proposed action with other referenced regional 
    activities.
        ERP No. D-GSA-E60015-GA, Rating LO, Clifton Road Campus of the 
    Centers for Disease Control and Prevention, Acquisition of Additional 
    Property, DeKalb County, GA.
        Summary: EPA had no objection to the action as proposed.
        ERP No. D-TVA-E39037-00, Rating EC2, Shoreline Management 
    Initiative: An Assessment of Residential Shoreline Development Impacts 
    in the Tennessee Valley, Mainstream Tennessee River and Tributary 
    Rerservoirs in AL, KY, NC, TN, GA, MS and VA.
        Summary: EPA believed that alternative D and C2 offer greater 
    environmental benefits than the preferred alternative C1 which would 
    open much of the shoreline to residential development. The PFEIS should 
    consider existing water quality problems of some TVA reservoirs 
    relative to prospective additional developments.
        ERP No. DS-FHW-E40739-NC, Rating EC2, US 17, New Bern Bypass 
    Construction, Jones-Craven County Line to NC-1438 near Vanceboro, 
    Additional Information Concerning Three Additional Alternatives, 
    Funding, COE Section 404 and US Coast Guard Bridge Permits Issuance, 
    Craven County, NC.
        Summary: EPA expressed environmental concern regarding floodplains 
    and wetland impacts. EPA requested that these issues be addressed in 
    more detail in the final EIS.
    
    Final EISs
    
        ERP No. F-AFS-G65065-AR, Renewal of the Shortleaf Pine/Bluestem 
    Grass Ecosystem and Recovery of the Red-cockaded Woodpecker, Amendment 
    No. 22 to the Ouachita National Forest Land and Resource Management 
    Plan, Scott and Polk Counties, AR.
        Summary: Review of the Final EIS has been completed and the project 
    found to be satisfactory. No formal comment letter was sent to the 
    preparing agency.
        ERP No. F-DOE-L91010-OR, Hood River Fisheries Project, 
    Construction, Operation and Maintenance; Habitat Improvement and 
    Research Program Development, Funding, Hood River Basin, Hood River 
    County, OR.
        Summary: Review of the Final EIS has been completed and the project 
    found to be satisfactory. No formal comment letter was sent to the 
    preparing agency.
        ERP No. F-FRC-K09806-CA, New Don Pedro Reservoir Project (NDPP) 
    (FERC. No. 2299-024), Reservoir Release Requirements for Fish, 
    Continuation and Maintenance, Issuance of Licenses, Tuolumne River and 
    San Joaquin River Turlock and Malesto Irrigation Districts, Stanislaus 
    County, CA.
        Summary: Review of the Final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
        ERP No. F-FTA-C51014-NJ, Hudson River Waterfront Transportation 
    Corridor Improvements, Funding, Transportation Systems Management, 
    Light Rail Transit, Hudson and Bergen Counties, NJ.
        Summary: EPA continued to express concern regarding wetland 
    impacts. EPA requested additional wetland acreage and description 
    information be submitted prior to the issuance of the Record of 
    Decision.
        ERP No. F-USA-A21035-OR, Umatilla Depot Activity, On-Site Facility 
    for Disposal of Stockpiled Chemical Agents and Munitions, Construction 
    and Operation, Morrow and Umatilla Counties, OR.
        Summary: EPA continued to have environmental concerns regarding 
    emergency preparedness, risk assessment, and meteorological data. In 
    addition, EPA is concerned about the apparent lack of effective 
    government-to-government consultation between the Confederated Tribes 
    of the Umatilla and the US Army.
    
        Dated: October 29, 1996.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 96-28115 Filed 10-31-96; 8:45 am]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
11/01/1996
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
96-28115
Pages:
56541-56541 (1 pages)
Docket Numbers:
ER-FRL-5474-5
PDF File:
96-28115.pdf