2019-23837. Falls Creek HP Limited Partnership; Eagle Creek Renewable Energy, LLC; Notice of Transfer of Exemption  

  • Start Preamble Start Printed Page 58710

    1. On September 17, 2019, Falls Creek HP Limited Partnership, exemptee for the Falls Creek Hydroelectric Project No. 6661, filed a letter notifying the Commission that the project was transferred from Falls Creek HP Limited Partnership to Eagle Creek Renewable Energy, LLC. The exemption from licensing was originally issued on March 4, 1983.[1] The project is located on the Falls Creek, South Santiam River, Linn County, OR. The transfer of an exemption does not require Commission approval.

    2. Eagle Creek Renewable Energy, LLC is now the exemptee of the Falls Creek Hydroelectric Project No. 6661. All correspondence must be forwarded to: Mr. Robert Gates, Eagle Creek Renewable Energy, LLC, 116 N State Street, P.O Box 167, Neshkoro, WI 54960-0167, Phone: 973-998-8403, Email: bob.gates@eaglecreekre.com.

    Start Signature

    Dated: October 25, 2019.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    Footnotes

    1.  Frontier Technology, Inc., 22 FERC ¶ 61,267 (1983). The project was transferred to Falls Creek HP Limited Partnership in 1989.

    Back to Citation

    [FR Doc. 2019-23837 Filed 10-31-19; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
11/01/2019
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2019-23837
Pages:
58710-58710 (1 pages)
Docket Numbers:
Project No. 6661-006
PDF File:
2019-23837.pdf