2022-23344. Finding of Failure To Attain and Reclassification as Serious Nonattainment for the 2012 Annual Fine Particulate Standard: Plumas County, California
-
Start Preamble
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Proposed rule.
SUMMARY:
The Environmental Protection Agency (EPA) is proposing to determine that the Plumas County nonattainment area failed to attain the 2012 annual fine particulate matter (“PM2.5 ”) national ambient air quality standard (NAAQS or “standard”) by the December 31, 2021 “Moderate” area attainment date. This proposed determination is based on ambient air quality monitoring data from 2019 through 2021. If the EPA finalizes this determination as proposed, then Clean Air Act (CAA or “Act”) section 188(b)(2) requires that the nonattainment area be reclassified to Serious by operation of law. Within 18 months from the effective date of a reclassification to Serious, the State must submit a revision to its State Implementation Plan (SIP) that complies with the statutory and regulatory requirements for Serious PM2.5 nonattainment areas.
DATES:
Any comments must arrive by December 1, 2022.
ADDRESSES:
Submit your comments, identified by Docket ID No. EPA-R09-OAR-2022-0815 at https://www.regulations.gov. For comments submitted at Regulations.gov, follow the online instructions for submitting comments. Once submitted, comments cannot be edited or removed from Regulations.gov. The EPA may publish any comment received to its public docket. Do not submit electronically any information you consider to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Multimedia submissions (audio, video, etc.) must be accompanied by a written comment. The written comment is considered the official comment and should include discussion of all points you wish to make. The EPA will generally not consider comments or comment contents located outside of the primary submission ( i.e., on the web, cloud, or other file sharing system). For additional submission methods, please contact the person identified in the FOR FURTHER INFORMATION CONTACT section. For the full EPA public comment policy, information about CBI or multimedia submissions, and general guidance on making effective comments, please visit https://www.epa.gov/dockets/commenting-epa-dockets. If you need assistance in a language other than English or if you are a person with disabilities who needs a reasonable accommodation at no cost to you, please contact the person identified in the FOR FURTHER INFORMATION CONTACT section.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Michael Dorantes, Air Planning Office (AIR-2), EPA Region IX, (415) 972-3934, dorantes.michael@epa.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Throughout this document, “we,” “us,” and “our” refer to the EPA.
Table of Contents
I. Background and Regulatory Context
A. The 2012 Annual PM2.5 National Ambient Air Quality Standard
B. Clean Air Act Requirements for PM2.5 Nonattainment Areas
C. Plumas County Designation for the 2012 PM2.5 NAAQS and State Implementation Plan Requirements
II. Proposed Determination and Associated Rationale
A. Applicable Statutory and Regulatory Provisions
B. Monitoring Network Review, Quality Assurance, and Data Completeness
C. The EPA's Evaluation of Attainment
III. Reclassification as Serious Nonattainment and Serious Area SIP Requirements
A. Reclassification as Serious and Applicable Attainment Date
B. Clean Air Act Requirements for Serious Area Plans
IV. Summary of Our Proposed Action
V. Statutory and Executive Order Reviews
I. Background and Regulatory Context
A. The 2012 Annual PM2.5 National Ambient Air Quality Standard
Under section 109 of the Clean Air Act, the EPA has established NAAQS for certain pervasive air pollutants (referred to as “criteria pollutants”) and conducts periodic reviews of the NAAQS to determine whether they should be revised or whether new NAAQS should be established. The EPA established these standards after considering substantial evidence from numerous health studies demonstrating that serious adverse health effects are associated with exposures to these criteria pollutants.[1]
Particulate matter includes particles with diameters that are generally 2.5 microns or smaller (PM2.5), and particles with diameters that are generally 10 microns or smaller (PM10). PM2.5 can be emitted by sources directly into the atmosphere as a solid or liquid particle (“primary PM2.5 ” or “direct PM2.5 ”) or can be formed in the atmosphere (“secondary PM2.5 ”) as a result of various chemical reactions among precursor pollutants such as nitrogen oxides (NOX), sulfur dioxide (SO2), volatile organic compounds (VOC), and ammonia (NH3 ).[2]
Epidemiological studies have shown statistically significant correlations between elevated PM2.5 levels and detrimental effects to human health and Start Printed Page 65720 the environment. The health effects associated with PM2.5 exposure include changes in lung function resulting in the development of respiratory symptoms, aggravation of existing respiratory conditions, and cardiovascular disease (as indicated by increased hospital admissions, emergency room visits, absences from school or work, and restricted activity days), and premature mortality. Individuals particularly sensitive to PM2.5 exposure include older adults, people with heart and lung disease, and children.[3] Elevated PM2.5 levels also have adverse secondary effects such as visibility impairment and damage to vegetation and ecosystems.
On July 18, 1997, the EPA first established annual and 24-hour NAAQS for PM2.5 .[4] The annual primary and secondary standards were set to 15.0 micrograms per cubic meter (μg/m[3] ) based on a 3-year average of annual mean PM2.5 concentrations. Then, on January 15th, 2013, in order to provide increased protection of public health, the EPA promulgated a more stringent annual PM2.5 NAAQS, revising the primary standard to 12.0 μg/m[3] based on a 3-year average of annual mean PM2.5 concentrations, while retaining the secondary standard at 15.0 μg/m[3] .[5]
B. Clean Air Act Requirements for PM2.5 Nonattainment Areas
The CAA requires states to develop a SIP that provides generally for the attainment, maintenance, and enforcement of the NAAQS. In addition, the CAA requires states to make a specific type of SIP submittal, a nonattainment plan submittal, that imposes additional controls for purposes of attaining the PM2.5 NAAQS, to achieve reductions of PM2.5 and PM2.5 precursor emissions.
The general CAA part D nonattainment area planning requirements are found in subpart 1 and the nonattainment area planning requirements specific to particulate matter are found in subpart 4. The subpart 1 statutory requirements for attainment plans include the following: the section 172(c)(1) requirements for reasonably available control measures (RACM)/reasonably available control technology (RACT) and attainment demonstrations; the section 172(c)(2) requirement to demonstrate reasonable further progress (RFP); the section 172(c)(3) requirement for emissions inventories; the section 172(c)(5) requirements for a nonattainment new source review (NNSR) permitting program; and the section 172(c)(9) requirement for contingency measures.
The more specific subpart 4 statutory requirements for Moderate PM2.5 nonattainment areas include the following: the section 189(a)(1)(A) NNSR permit program requirements; the section 189(a)(1)(B) requirements for attainment demonstrations; the section 189(a)(1)(C) requirements for RACM; the section 189(c) requirements for RFP and quantitative milestones; and the section 189(e) requirement for controls on sources of particulate matter precursors.
Under subpart 4, states with Moderate PM2.5 nonattainment areas must provide for attainment in the area as expeditiously as practicable but no later than the end of the sixth calendar year after designation. For the 2012 PM2.5 annual NAAQS, this date is December 31, 2021. In addition, under subpart 4, direct PM2.5 and all precursors to the formation of PM2.5 are subject to control unless the EPA approves a demonstration from the state establishing that a given precursor does not contribute significantly to PM2.5 levels that exceed the PM2.5 NAAQS in the area.[6]
To implement the PM2.5 NAAQS, the EPA has also promulgated the “Fine Particle Matter National Ambient Air Quality Standard: State Implementation Plan Requirements; Final Rule” (“PM2.5 Implementation Rule”).[7] The PM2.5 Implementation Rule provides additional regulatory requirements and guidance applicable to attainment plan submittals for the PM2.5 NAAQS, including the 2012 annual PM2.5 NAAQS at issue in this action.
C. Plumas County Designation for the 2012 PM2.5 NAAQS and State Implementation Plan Requirements
Following promulgation of new or revised NAAQS, the EPA is required under CAA section 107(d) to designate regions throughout the nation as attaining or not attaining these NAAQS. Those regions found not to be attaining the NAAQS are also given a classification that describes the degree of nonattainment. Under subpart 4 of part D of title I of the CAA, the EPA designates areas found to be violating the PM2.5 NAAQS, and areas that contribute to such violations, as nonattainment and classifies them initially as Moderate nonattainment areas.
Effective January 15, 2015, the EPA designated a portion of Plumas County as a Moderate nonattainment area (“Portola nonattainment area”) for the 2012 PM2.5 NAAQS based on ambient monitoring data that showed the area was above the 12.0 μg/m[3] primary standard for the 3-year 2011-2013 monitoring period.[8] For this 2011-2013 monitoring period, the annual PM2.5 design value [9] for the Portola nonattainment area was 12.8 μg/m[3] from readings at the Portola PM2.5 monitoring site.[10]
This Moderate nonattainment designation and classification required the state of California to submit an attainment plan for the Portola nonattainment area, in accordance with the requirements of CAA sections 172(c) and 189(a), (c), and (e), demonstrating attainment of the NAAQS as expeditiously as practical but no later than the end of the sixth calendar year following the designation, or December 31, 2021, which is the latest permissible attainment date under CAA section 188(c)(2).
Under state law, the local air district with the primary responsibility for developing a plan to attain the 2012 annual PM2.5 NAAQS in this area is the Northern Sierra Air Quality Management District (NSAQMD or “District”). The District worked with the California Air Resources Board (CARB) in preparing the plan. On February 28, 2017, California submitted the “Portola Fine Particulate Matter (PM2.5) Attainment Plan” (“Portola PM2.5 Plan”) to address the CAA's Moderate nonattainment area requirements for the 2012 annual PM2.5 NAAQS. On March 25, 2019, the EPA fully approved the Portola PM2.5 Plan, except for the contingency measure elements.[11] California later submitted a revision to Portola PM2.5 Plan (“PM2.5 Plan Revision”), which included a contingency measure adopted in an ordinance by the City of Portola.
On April 2, 2021, the EPA took final action to approve the PM2.5 Plan Start Printed Page 65721 Revision.[12] We also found that the contingency measure element of the Portola PM2.5 Plan, as revised and supplemented by the Proposed PM2.5 Plan Revision, satisfied the requirements for contingency measures in CAA section 172(c)(9) and 40 CFR 51.1014 for purposes of the 2012 PM2.5 NAAQS in the Portola nonattainment area.[13]
II. Proposed Determination and Associated Rationale
A. Applicable Statutory and Regulatory Provisions
Sections 179(c)(1) and 188(b)(2) of the CAA require the EPA to determine whether a PM2.5 nonattainment area attained by the applicable attainment date, based on the area's air quality “as of the attainment date.” Generally, this determination of whether an area's air quality meets the PM2.5 standard(s) is based upon the most recent three years of complete, certified data gathered at eligible monitoring sites in accordance with 40 CFR part 58.[14] The requirements of 40 CFR part 58 include quality assurance procedures for monitor operation and data handling, siting parameters for instruments or instrument probes, and minimum ambient air quality monitoring network requirements. State, local, or tribal agencies operating air monitoring sites, in accordance with 40 CFR part 58, must enter the ambient air quality data and associated quality assurance data from these sites into the EPA's Air Quality System (AQS) database.[15] These monitoring agencies certify annually that these data are accurate to the best of their knowledge, taking into consideration the quality assurance findings.[16] Accordingly, the EPA relies primarily on AQS data when determining the attainment status of an area. In determining whether data are suitable for regulatory determinations, the EPA uses a “weight of evidence” approach, considering the requirements of 40 CFR part 58, Appendix A “in combination with other data quality information, reports, and similar documentation that demonstrate overall compliance with Part 58.” [17]
The 2012 primary annual PM2.5 standard is met when the three year average of the annual arithmetic mean concentration, as determined in accordance with 40 CFR part 50 appendix N, is less than or equal to 12.0 μg/m[3] at each eligible monitoring site.[18] For the annual PM2.5 standard, eligible monitoring sites are those monitoring stations that meet the criteria specified in 40 CFR 58.11 and 58.30, and thus are approved for comparison to the annual PM2.5 NAAQS.[19] Three years of valid annual means are required to produce a valid annual PM2.5 NAAQS design value.[20] Data completeness requirements for a given year are met when at least 75 percent of the scheduled sampling days for each quarter have valid data.[21]
B. Monitoring Network Review, Quality Assurance, and Data Completeness
CARB is the governmental agency with the primary authority and responsibility under the State's laws for collecting ambient air quality data for the Portola nonattainment area. The Portola monitoring site (AQS ID: 06-063-1010) is the only regulatory PM2.5 monitoring site in the Portola nonattainment area and is operated by CARB. CARB submits annual monitoring network plans to the EPA documenting the status of CARB's air monitoring network, as required under 40 CFR 58.10.[22] The EPA reviews these annual network plans for compliance with specific requirements in 40 CFR part 58. With respect to the Portola nonattainment area, we have found that the annual network plans submitted by CARB meet these requirements under 40 CFR part 58, including minimum monitoring requirements.[23]
In accordance with 40 CFR 58.15, CARB certifies annually that the previous year's ambient concentration and quality assurance data are completely submitted to AQS and that the ambient concentration data are accurate, taking into consideration the quality assurance findings.[24] Along with the certification letters, CARB submits a summary of the precision and accuracy data for all ambient air quality data.[25]
The Design Value Report also includes a validity indicator that reflects whether the design value is valid ( i.e., calculated using data that meet the applicable completeness criteria). For the purposes of this proposal, we reviewed the data for the 2019-2021 period for completeness and determined that the PM2.5 data collected by CARB met the 75 percent completeness criterion for all 12 quarters at the Portola monitoring site.
Finally, the EPA conducts regular technical systems audits (TSAs) where we review and inspect state and local ambient air monitoring programs to assess compliance with applicable regulations concerning the collection, analysis, validation, and reporting of ambient air quality data. For the purposes of this proposal, we reviewed the findings from the EPA's 2018 TSA of CARB's ambient air monitoring program.[26] None of the findings from the 2018 TSA were cause for invalidation of any data from the Portola PM2.5 monitoring site.[27]
In summary, based on the relevant monitoring network plans, certifications, and 2018 TSA, we propose to find that the PM2.5 data collected at the Portola monitoring site are suitable for determining whether the Portola nonattainment area attained the 2012 annual PM2.5 NAAQS by the applicable attainment date.
C. The EPA's Evaluation of Attainment
Table 1 provides the 2021 PM2.5 design value from the regulatory monitor within the Portola nonattainment area, expressed as a single design value representing the average of the annual mean values from the 2019-2021 period; the annual mean for each individual year is also listed. The PM2.5 data show that the design value at the Portola monitoring site was 16.5 μg/m3 , which exceeds the 2012 annual PM2.5 NAAQS of 12.0 μg/m3 . Consequently, the EPA proposes to determine based upon three years of complete, quality-assured and certified data from 2019 through 2021, that the Portola nonattainment area did not attain the 2012 annual PM2.5 NAAQS by the applicable attainment date of December 31, 2021. Start Printed Page 65722
Table 1—2019-2021 Annual PM 2.5 Design Value for the Portola Nonattainment Area
Monitoring site AQS site ID # Annual weighted mean (μg/m3 ) 2019-2021 annual design value (μg/m3 ) 2019 2020 2021 Portola 06-063-1010 12.2 20.9 16.5 16.5 Source: EPA AQS Design Value Report, AMP480, dated August 10, 2022. (User ID: JCARLSTAD, Report Request ID: 2039270). III. Reclassification as Serious Nonattainment and Serious Area SIP Requirements
A. Reclassification as Serious and Applicable Attainment Date
In accordance with section 188(b)(1) of the Act, the EPA is proposing to reclassify the Portola nonattainment area from Moderate to Serious for the 2012 annual PM2.5 standard, based on the determination that the area did not attain the standard by the applicable attainment date.
Under section 188(c)(2) of the Act, the attainment date for a Serious area “shall be as expeditiously as practicable but no later than the end of the tenth calendar year beginning after the area's designation as nonattainment . . .” The EPA designated Plumas County as nonattainment for the 2012 PM2.5 NAAQS effective January 15, 2015. Therefore, upon reclassification to Serious, the latest permissible attainment date under section 188(c)(2) of the Act for the purposes of the 2012 PM2.5 NAAQS in the Portola nonattainment area, will be December 31, 2025.
Under section 188(e) of the Act, a state may apply to the EPA for a single extension of the Serious area attainment date of up to five additional years, which the EPA may grant if the state satisfies certain statutory conditions. Before the EPA may extend the attainment date for a Serious area under section 188(e), the state must: (1) Apply for an extension of the attainment date beyond the statutory attainment date; (2) demonstrate that attainment by the statutory attainment date is impracticable; (3) demonstrate that it has complied with all requirements and commitments pertaining to the area in the implementation plan; (4) demonstrate to the satisfaction of the Administrator that the plan for the area includes the most stringent measures that are included in the implementation plan of any state or are achieved in practice in any state, and can feasibly be implemented in the area; and (5) submit a demonstration of attainment by the most expeditious alternative date practicable.
B. Clean Air Act Requirements for Serious Area Plans
Upon reclassification of the Portola nonattainment area to Serious for the 2012 PM2.5 NAAQS, California will be required to submit an additional SIP revision to satisfy the statutory requirements that apply to Serious PM2.5 nonattainment areas, including the requirements of subpart 4 of part D, title I of the Act and 40 CFR part 51, subpart Z. Pursaunt to CAA section 189(b)(2), this SIP revision will be due 18 months from the effective date of the final reclassification to Serious.
The Serious area SIP elements that California will be required to submit are as follows:
1. Provisions to assure that the best available control measures, including the best available control technology for stationary sources, for the control of direct PM2.5 and PM2.5 precursors shall be implemented no later than four years after the area is reclassified (CAA section 189(b)(1)(B));
2. a demonstration (including air quality modeling) that the plan provides for attainment as expeditiously as practicable but not later than December 31, 2025, or where the state is seeking an extension of the attainment date under section 188(e), a demonstration that attainment by December 31, 2025 is impracticable and that the plan provides for attainment by the most expeditious alternative date practicable and not later than December 31, 2030 (CAA sections 189(b)(1)(A), 188(c)(2), and 188(e));
3. plan provisions that require RFP (CAA section 172(c)(2));
4. quantitative milestones that are to be achieved every three years until the area is redesignated to attainment and that demonstrate RFP toward attainment by the applicable date (CAA section 189(c));
5. provisions to assure that control requirements applicable to major stationary sources of PM2.5 also apply to major stationary sources of PM2.5 precursors, except where the state demonstrates to the EPA's satisfaction that such sources do not contribute significantly to PM2.5 levels that exceed the standard in the area (CAA section 189(e));
6. a comprehensive, accurate, current inventory of actual emissions from all sources of PM2.5 and PM2.5 precursors in the area (CAA section 172(c)(3));
7. contingency measures to be implemented if the area fails to meet RFP (including quantitative milestones and related reports) or to attain by the applicable attainment date (CAA section 172(c)(9)); and
8. a revision to the NNSR program to lower the applicable “major stationary source” [28] thresholds from 100 tpy to 70 tpy (CAA section 189(b)(3)) and to satisfy the subpart 4 requirements for major stationary sources of PM2.5 precursors (CAA section 189(e)).
IV. Summary of Our Proposed Action
In accordance with section 188(b)(2) of the CAA, the EPA is proposing to determine that the Portola Moderate nonattainment area did not attain the 2012 annual PM2.5 NAAQS by its applicable attainment date of December 31, 2021. Our proposed determination that the Portola nonattainment area failed to attain the PM2.5 NAAQS is based on complete, quality-assured, and certified PM2.5 monitoring data for the 2019-2021 period.
If we finalize our action as proposed, the Portola nonattainment area will be reclassified as a Serious PM2.5 nonattainment area by operation of law pursuant to CAA section 188(b)(2) and will be subject to all applicable Serious area requirements, as outlined in section III.B. Under CAA sections 188(c)(2), the Serious area attainment date for the Portola nonattainment area will be as expeditiously as practicable but no later than December 31, 2025, ten years after the area's designation to nonattainment.
The EPA is soliciting public comments on the issues discussed in this document. We will accept comments from the public on this proposal until December 1, 2022 and will consider comments before taking final action.
V. Statutory and Executive Order Reviews
Additional information about these statutes and Executive Orders can be Start Printed Page 65723 found at https://www.epa.gov/laws-regulations/laws-and-executive-orders.
A. Executive Order 12866: Regulatory Planning and Review, and Executive Order 13563: Improving Regulation and Regulatory Review
This action is not a significant regulatory action and therefore was not submitted to the Office of Management and Budget (OMB) for review.
B. Paperwork Reduction Act (PRA)
This action does not impose an information collection burden under the provisions of the PRA because it does not contain any information collection activities.
C. Regulatory Flexibility Act (RFA)
I certify that this action will not have a significant economic impact on a substantial number of small entities under the RFA. This action will not impose any requirements on small entities. This proposed action, if finalized, would require the state to adopt and submit SIP revisions to satisfy CAA requirements and would not itself directly regulate any small entities.
D. Unfunded Mandates Reform Act (UMRA)
This action does not contain any unfunded mandate of $100 million or more, as described in UMRA (2 U.S.C. 1531-1538) and does not significantly or uniquely affect small governments. This action itself imposes no enforceable duty on any state, local, or tribal governments, or the private sector. This action proposes to determine that the Portola nonattainment area failed to attain the NAAQS by the applicable attainment date. If finalized, this determination would trigger existing statutory timeframes for the state to submit a SIP revision. Such a determination in and of itself does not impose any federal intergovernmental mandate.
E. Executive Order 13132: Federalism
This action does not have federalism implications. It will not have substantial direct effects on the states, on the relationship between the national government and the states, or on the distribution of power and responsibilities among the various levels of government.
F. Executive Order 13175, Consultation and Coordination With Indian Tribal Governments
This action does not have tribal implications as specified in Executive Order 13175. As there are no federally recognized tribes within the Portola nonattainment area,[29] the proposed finding of failure to attain the 2012 annual PM2.5 NAAQS does not apply to tribal areas, and the proposed rule would not impose a burden on Indian reservation lands or other areas where the EPA or an Indian tribe has demonstrated that a tribe has jurisdiction within the Portola nonattainment area. Thus, this proposed rule does not have tribal implications and will not impose substantial direct costs on tribal governments or preempt tribal law as specified by Executive Order 13175.
G. Executive Order 13045, Protection of Children From Environmental Health Risks and Safety Risks
The EPA interprets Executive Order 13045 as applying only to those regulatory actions that concern environmental health or safety risks that the EPA has reason to believe may disproportionately affect children, per the definition of “covered regulatory action” in section 2-202 of the Executive Order. This proposed action is not subject to Executive Order 13045 because the effect of this proposed action, if finalized, would be to trigger additional planning requirements under the CAA. This proposed action does not establish an environmental standard intended to mitigate health or safety risks.
H. Executive Order 13211, Actions That Significantly Affect Energy Supply, Distribution, or Use
This proposed rule is not subject to Executive Order 13211, because it is not a significant regulatory action under Executive Order 12866.
I. National Technology Transfer and Advancement Act (NTTAA)
This rulemaking does not involve technical standards.
J. Executive Order 12898: Federal Actions To Address Environmental Justice in Minority Populations and Low-Income Populations
Executive Order 12898 establishes federal executive policy on environmental justice. Its main provision directs federal agencies, to the greatest extent practicable and permitted by law, to make environmental justice part of their mission by identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects of their programs, policies, and activities on minority populations and low-income populations in the United States. There is no information in the record indicating that this action would be inconsistent with the stated goals of Executive Order 12898 of achieving environmental justice for people of color, low-income populations, and indigenous peoples.
Start List of SubjectsList of Subjects
40 CFR Part 52
- Environmental protection
- Air pollution control
- Incorporation by reference
- Particulate matter
- Reporting and recordkeeping requirements
40 CFR Part 81
- Environmental protection
- Administrative practice and procedure
- Air pollution control
- Designations and classifications
- Intergovernmental relations
- Particulate matter
- Reporting and recordkeeping requirements
Dated: October 19, 2022.
Martha Guzman Aceves,
Regional Administrator, Region IX.
Footnotes
1. For a given air pollutant “primary” NAAQS are those determined by the EPA as requisite to protect the public health, allowing an adequate margin of safety, and “secondary” standards are those determined by the EPA as requisite to protect the public welfare from any known or anticipated adverse effects associated with the presence of such air pollutant in the ambient air. See CAA section 109(b).
Back to Citation2. 80 FR 15340, 15342 (March 23, 2015).
Back to Citation3. EPA, Air Quality Criteria for Particulate Matter, No. EPA/600/P-99/002aF and EPA/600/P-99/002bF, October 2004.
Back to Citation4. 62 FR 38652 (July 18, 1997). In October 2006, the EPA lowered the 24-hour NAAQS for PM2.5 from 65 micrograms per cubic meter (μg/m3) to 35 μg/m3. 71 FR 61144 (October 17, 2006).
Back to Citation5. 78 FR 3086 (January 15, 2013) and 40 CFR 50.18. Unless otherwise noted, all references to the PM2.5 NAAQS in this document are to the 2012 annual NAAQS of 12.0 μg/m3. , codified at 40 CFR 50.18.
Back to Citation6. 40 CFR 51.1006 and 51.1009.
Back to Citation7. 81 FR 58010 (August 24, 2016).
Back to Citation8. 80 FR 2206 (January 15, 2015).
Back to Citation9. A design value is the 3-year average NAAQS metric that is compared to the NAAQS level to determine when a monitoring site meets or does not meet the NAAQS. The specific methodologies for calculating whether the annual PM2.5 NAAQS is met at each eligible monitoring site in an area are found in 40 CFR part 50, Appendix N, section 4.1.
Back to Citation10. From 2000 through early 2013, the Portola PM2.5 monitoring site was located at 161 Nevada Street. In 2013, the site was relocated to 420 Gulling Street where it remains to date.
Back to Citation11. 84 FR 11208 (March 25, 2019).
Back to Citation12. 86 FR 12263 (March 3, 2021).
Back to Citation13. Id.
Back to Citation14. 40 CFR part 50, Appendix N, section 3.0.
Back to Citation15. 40 CFR 58.16. AQS is the EPA's national repository of ambient air quality data.
Back to Citation17. 40 CFR part 58, Appendix A, section 1.2.3.
Back to Citation18. 40 CFR 50.18(b); 40 CFR part 50, Appendix N, section 4.1(a).
Back to Citation19. 40 CFR part 50, Appendix N, section 1.0(c).
Back to Citation20. 40 CFR part 50, Appendix N, section 4.1(b).
Back to Citation21. Id.
Back to Citation22. We have included copies of CARB's annual monitoring network plans for 2019-2021 in our docket.
Back to Citation23. We have included our reviews of CARB's annual monitoring network plans and the correspondence transmitting these reviews in our docket.
Back to Citation24. We have included CARB's annual data certifications for 2019, 2020, and 2021 in our docket.
Back to Citation25. See 40 CFR 58.15(c).
Back to Citation26. EPA Region 9, Technical Systems Audit of the Ambient Air Monitoring Program: California Air Resources Board, September-December 2018 (Final Report dated January 2020).
Back to Citation27. Id.
Back to Citation28. For any Serious area, the terms “major source” and “major stationary source” include any stationary source that emits or has the potential to emit at least 70 tpy of PM10 (CAA sections 189(b)(3)).
Back to Citation29. Map of Federally-Recognized Tribes in EPA's Pacific Southwest (Region 9) is available at https://www.epa.gov/tribal-pacific-sw/map-federally-recognized-tribes-epas-pacific-southwest-region-9.
Back to Citation[FR Doc. 2022-23344 Filed 10-31-22; 8:45 am]
BILLING CODE 6560-50-P
Document Information
- Published:
- 11/01/2022
- Department:
- Environmental Protection Agency
- Entry Type:
- Proposed Rule
- Action:
- Proposed rule.
- Document Number:
- 2022-23344
- Dates:
- Any comments must arrive by December 1, 2022.
- Pages:
- 65719-65723 (5 pages)
- Docket Numbers:
- EPA-R09-OAR-2022-0815, FRL-10250-01-R9
- Topics:
- Air pollution control, Environmental protection, Incorporation by reference, Particulate matter, Reporting and recordkeeping requirements
- PDF File:
- 2022-23344.pdf
- Supporting Documents:
- » Docket Index
- » C. Notice of Proposed Rulemaking
- » B. State Plans, Support Documents, Reports, and Correspondence
- » A. U.S. EPA Guidance Documents, Policies, and Rulemaking
- » Finding of Failure to Attain and Reclassification as Serious Nonattainment for the 2012 Annual Fine Particulate Standard: Plumas County, CA
- CFR: (1)
- 40 CFR 52