Home »
2024 Issues »
89 FR (11/01/2024) » 2024-25436. Large Loads Co-Located at Generating Facilities; Fourth Supplemental Notice of Commissioner-Led Technical Conference
2024-25436. Large Loads Co-Located at Generating Facilities; Fourth Supplemental Notice of Commissioner-Led Technical Conference
PJM Interconnection, L.L.C |
Docket Nos. ER24-2172-000, ER24-2172-001. |
Atlantic City Electric Company |
Docket No. ER24-2888-000. |
Baltimore Gas and Electric Company |
Docket No. ER24-2889-000. |
( print page 87360)
|
Commonwealth Edison Company |
Docket No. ER24-2890-000. |
Delmarva Power & Light Company |
Docket No. ER24-2891-000. |
PECO Energy Company |
Docket No. ER24-2893-000. |
Potomac Electric Power Company |
Docket No. ER24-2894-000. |
PJM Interconnection, L.L.C |
Docket Nos. ER24-2447-000, ER24-2447-001. |
Baltimore Gas & Electric Company, PECO Energy Company |
Docket No. EL24-149-000. |
Document Information
- Published:
- 11/01/2024
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2024-25436
- Pages:
- 87359-87360 (2 pages)
- Docket Numbers:
- Docket No. AD24-11-000
- PDF File:
-
2024-25436.pdf