98-30039. Notice of Intent To File An Application for a New License  

  • [Federal Register Volume 63, Number 217 (Tuesday, November 10, 1998)]
    [Notices]
    [Pages 63049-63050]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-30039]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Intent To File An Application for a New License
    
    November 4, 1998.
        a. Type of filing: Notice of Intent to File An Application for a 
    New License.
        b. Project No.: 469.
        c. Date filed: October 23, 1998.
        d. Submitted By: Minnesota Power, Inc., current licensee.
        e. Name of Project: Winton Project.
        f. Location: On the Kawishiwi River, in St. Louis and Lake 
    Counties, Minnesota.
        g. Filed Pursuant to: Section 15 of the Federal Power Act, 18 CFR 
    16.6 of the Commission's regulations.
        h. Effective date of current license: March 1, 1981.
        i. Expiration date of current license: October 31, 2003.
        j. The project consists of two developments: The Winton Development 
    consists of: (1) a concrete dam comprising: (a) a 176-foot-long 
    spillway section; (b) a 84-foot-long taintor gate section; (c) a 80-
    foot-long stop-log gate section; (d) a 111-foot-long and 120-foot-long 
    non-over-flow section; and (e) a 161-foot-long intake section; (2) 
    approximately 1,500-foot-long earth dikes; (3) a 2,982-acre reservoir 
    comprising of the Garden, Farm, and Friday Lakes at normal water 
    surface of the Garden, Farm, and Friday Lakes at normal water surface 
    elevation of 1,388.0 feet msl; (4) two 250-foot-long, 9-foot-diameter 
    penstocks extending to; (5) a powerhouse containing two generating 
    units with a total installed capacity of 4,000 kW; and (6) appurtenant 
    facilities.
        The Birch Lake Reservoir Development consists of: (1) 227-foot-long 
    rock-filled timber crib dam comprising; (a) a 72-foot-long taintor gate 
    section; and (b) a 85-foot-long sluice gate section; (2) the 7,724-acre 
    Birch Lake reservoir at normal water surface elevation of 1,418.0 feet 
    msl. This development provides water storage for the Winton 
    Development.
        k. Pursuant to 18 CFR 16.7, information on the project is available 
    at: Minnesota Power, Inc., 30 West Superior Street, Duluth, MN 55802, 
    Ms. Ingrid Kane, (218) 720-2534.
        l. FERC contact: Tom Dean (202) 219-2778.
        m. Pursuant to 18 CFR 16.9 each application for a new license and 
    any competing license applications must be filed with the Commission at 
    least 24 months prior to the expiration of the
    
    [[Page 63050]]
    
    existing license. All applications for license for this project must be 
    filed by October 31, 2001.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-30039 Filed 11-9-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/10/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-30039
Pages:
63049-63050 (2 pages)
PDF File:
98-30039.pdf