98-30066. Keystone Resort, Jones Gulch Development; White River National Forest, Summit County, Colorado  

  • [Federal Register Volume 63, Number 217 (Tuesday, November 10, 1998)]
    [Notices]
    [Pages 63024-63025]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-30066]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF AGRICULTURE
    
    Forest Service
    
    
    Keystone Resort, Jones Gulch Development; White River National 
    Forest, Summit County, Colorado
    
    AGENCY: Forest Service, USDA.
    
    ACTION: Notice of Intent to prepare an Environmental Impact Statement.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The USDA, Forest Service will prepare an Environmental Impact 
    Statement (EIS) to disclose the environmental effects from the 
    development of the Jones Gulch ski pod at Keystone Resort. Development 
    will be confined to Keystone Resort's existing Special Use Permit 
    boundary. The proposed actions to construct lifts, trails, snowmaking, 
    and associated service roads are being considered together because they 
    represent either connected or cumulative actions as defined by the 
    Council on Environmental Quality (40 CFR 1508.25).
        The Forest Service is evaluating a proposal, submitted by Keystone 
    Resort, which is consistent with forest management direction for ski 
    areas. The purposes of the project are to address the following needs: 
    (1) To improve skier/snowboarder distribution and reduce trail 
    densities on the front side of Keystone Mountain by providing 
    additional intermediate and advanced terrain on the front side of 
    Keystone Mountain; (2) to improve ingress and egress and reduce out-of-
    base congestion by adding another portal at
    
    [[Page 63025]]
    
    Jones Gulch; (3) to meet existing and anticipated skier demand through 
    development of infrastructure consistent with advances in equipment, 
    lift technology, and consumer preference; (4) to address some existing 
    environmental concerns associated with historic activities and existing 
    development. The EIS will tier to the White River National Forest Land 
    and Resource Management Plan (Forest Plan) and Final EIS of September 
    20, 1984, which provides overall guidance for ski area management of 
    the area. All activities associated with the proposal will be designed 
    to maintain high quality resource objectives.
    
    DATES: Written comments and suggestions should be postmarked or 
    received by the Dillon Ranger District no later than 30 days after the 
    publication of this notice. Send comments to Michael Liu, Attn: 
    Keystone, Dillon Ranger District, P.O. Box 620, Silverthorne, Colorado, 
    80498, fax (970) 468-7735.
    
    FOR FURTHER INFORMATION: Contact Michael Liu, Special Projects 
    Coordinator, Dillon Ranger District, phone (970) 262-3440.
    
    SUPPLEMENTARY INFORMATION: The proposed action includes construction of 
    facilities entirely within Keystone Resort's Special Use Permit area. 
    These facilities have been conceptually approved through previous 
    National Environmental Policy Act analysis of the Resort's Master 
    Development Plan (MDP). Specific elements of the proposed action 
    include: Approximately 125 acres of trail construction, approximately 
    95 acres of additional snowmaking coverage, construction of three 
    chair-lifts and one surface-lift, and construction of required service 
    roads.
        The project area is located on National Forest System lands within 
    sections 19, 20, 29, 30, 31 and 32, Township 5 South, Range 76 West of 
    the 6th P.M., all within Summit County, Colorado. Keystone Resort is 
    located approximately 70 miles west of Denver, Colorado.
        These improvements are consistent with Forest Plan and Regional 
    Guide direction, and are considered necessary in light of current 
    resort deficiencies, increased visitation experienced over the past 
    decade, and projected future visitation increases. The proposed 
    analysis will provide additional site-specific detail for portions of 
    the existing MDP to accommodate changing socio-economic and 
    environmental considerations, and may modify previous approvals shown 
    in the MDP to avoid wetlands and other environmentally sensitive areas.
    
    Preliminary Issues
    
        Preliminary issues identified forest fragmentation and effects to: 
    Wildlife, wetlands, water quality, mountain hydrology, geological 
    stability, and the relationship of the project to future development of 
    adjacent real estate. Additional issues will be identified during the 
    scoping process.
    
    Public Involvement and Scoping
    
        Analysis of this proposal was originally planned under an 
    Environmental Assessment (EA). After further study and additional 
    information from resource specialists, the Forest Service has decided 
    to prepare an EIS. Public scoping was conducted for the EA during 
    October and November of 1997 through newspaper articles, letters to 
    interested parties and two open houses. Comments previously submitted 
    as part of the EA scoping process will be included in the documentation 
    for the EIS and will be used to focus analysis and develop 
    alternatives. Interested groups and individuals that have previously 
    commented as part of the EA scoping process will be retained on the 
    project mailing list.
        The project proposal has been modified since originally submitted 
    by Keystone Resort. The proposed Ski Tip Return Trail has been removed 
    and one chairlift has been added to the proposal.
        This environmental analysis and decision making process will enable 
    additional interested and affected people to participate and contribute 
    to the final decision. The Forest Service will seek information, 
    comments, and assistance identifying issues from Federal, State, local 
    agencies, federally recognized Native American tribes, and other 
    individuals or organizations who may be interested in or affected by 
    the proposal.
        Completion of the draft EIS is anticipated during the late winter 
    or spring of 1999. The final EIS should be completed some time during 
    the late summer or fall of 1999. The comment period on the draft EIS 
    will be 90 days from the date the Environmental Protection Agency 
    publishes the ``Notice of Availability'' in the Federal Register.
    
    Responsible Official
    
        The Responsible Official for this project is Martha Ketelle, Forest 
    Supervisor for the White River National Forest. The Responsible 
    Official will document the decision and reasons for the decision in the 
    Record of Decision issued concurrently with the release of the final 
    EIS. That decision will be subject to appeal under 36 CFR 215.
    
        Dated: November 3, 1998.
    Martha Ketelle,
    Forest Supervisor, White River National Forest.
    [FR Doc. 98-30066 Filed 11-9-98; 8:45 am]
    BILLING CODE 3410-11-M
    
    
    

Document Information

Published:
11/10/1998
Department:
Forest Service
Entry Type:
Notice
Action:
Notice of Intent to prepare an Environmental Impact Statement.
Document Number:
98-30066
Dates:
Written comments and suggestions should be postmarked or received by the Dillon Ranger District no later than 30 days after the publication of this notice. Send comments to Michael Liu, Attn: Keystone, Dillon Ranger District, P.O. Box 620, Silverthorne, Colorado, 80498, fax (970) 468-7735.
Pages:
63024-63025 (2 pages)
PDF File:
98-30066.pdf