97-29731. Energy 2000, Incorporated, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 62, Number 218 (Wednesday, November 12, 1997)]
    [Notices]
    [Pages 60703-60706]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-29731]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. ER98-171-000, et al.]
    
    
    Energy 2000, Incorporated, et al.; Electric Rate and Corporate 
    Regulation Filings
    
    November 3, 1997.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Energy 2000, Incorporated
    
    [Docket No. ER98-171-000]
    
        Take notice that on October 15, 1997, Energy 2000, Incorporated 
    (Energy 2000) petitioned the Commission for acceptance of Energy 2000 
    Rate Schedule FERC No. 1; the granting of certain blanket approvals, 
    including the authority to sell electricity at market-based prices; and 
    the waiver of certain Commission Regulations.
        Energy 2000 intends to engage in wholesale electric power and 
    energy purchases and sales as a marketer. Energy 2000 is not in the 
    business of generating or transmitting electric power. Energy 2000 is 
    an independent corporation which is not a subsidiary or affiliate of 
    any other entity nor does it have affiliates of its own.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    2. The Washington Water Power Company
    
    [Docket No. ER98-172-000]
    
        Take notice that on October 15, 1997, The Washington Water Power 
    Company (WWP), tendered for filing with the Federal Energy Regulatory 
    Commission executed Service Agreements for Non-Firm Point-To-Point 
    Transmission Service under WWP's Open Access Transmission Tariff--FERC 
    Electric Tariff, Volume No. 8, with Cook Inlet Energy Supply, LP and NP 
    Energy, Inc. WWP requests the Service Agreements be given effective 
    dates of October 1, 1997.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    3. PP&L, Inc.
    
    [Docket No. ER98-173-000]
    
        Take notice that on October 15, 1997, PP&L, Inc., (Formerly known 
    as Pennsylvania Power & Light Company) (PP&L), tendered for filing a 
    Transformer Disconnection Agreement between PP&L and Metropolitan 
    Edison Company, d/b/a GPU Energy (GPU), pursuant to which PP&L has 
    agreed to permanently disconnect a 500/230 kV transformer located at 
    PP&L's Hosensack substation. GPU has agreed to pay a contribution-aid-
    of-construction (CIAC) in return for PP&L disconnecting this 
    transformer. PP&L has not yet collected any monies owed it for 
    disconnecting the transformer.
        PP&L states that copies of this filing have been served on GPU and 
    on the Pennsylvania Public Utility Commission.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    4. Millennium Energy Corporation
    
    [Docket No. ER98-174-000]
    
        Take notice that on October 15, 1997, Millennium Energy Corporation 
    (Millennium Energy), tendered for filing an application for waivers and 
    blanket approvals under various regulations of the Commission and for 
    an order accepting its FERC Electric Rate Schedule No. 1, to be 
    effective on the date of the Commission's order accepting the Rate 
    Schedule for filing.
        Millennium Energy intends to engage in electric power and energy 
    transactions as a marketer. In these transactions, Millennium Energy 
    proposes to charge market-determined rates, mutually agreed upon by the 
    parties. All sales and purchases will be arms-length transactions.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. Allegheny Power Service, Corporation, on behalf of Monongahela Power 
    Company, The Potomac Edison Company and West Penn Power Company 
    (Allegheny Power)
    
    [Docket No. ER98-175-000]
    
        Take notice that on October 16, 1997, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (Allegheny Power) filed Supplement 
    No. 33, to add four (4) new Customers to the Standard Generation 
    Service Rate Schedule under which Allegheny Power offers standard 
    generation and emergency service on an hourly, daily, weekly, monthly 
    or yearly basis. Allegheny Power requests a waiver of notice 
    requirements to make service available as of October 15, 1997, to CNG 
    Retail Services Corporation, New Energy Ventures, L.L.C., QST Energy 
    Trading Inc., and Williams Energy Services Company.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the Virginia State Corporation 
    Commission, the West Virginia Public Service Commission, and all 
    parties of record.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. PP&L, Inc.
    
    [Docket No. ER98-176-000]
    
        Take Notice that on October 16, 1997, PP&L, Inc., (formerly known 
    as Pennsylvania Power & Light Company)(PP&L), filed a Service Agreement 
    dated October 7, 1997, with Jersey Central Power & Light Company, 
    Metropolitan Edison Company and Pennsylvania Electric Company, each 
    trading and doing business as GPU Energy (GPU) under PP&L's FERC 
    Electric Tariff, Original Volume No. 5. The Service Agreement adds GPU 
    as an eligible customer under the Tariff.
        PP&L requests an effective date of October 16, 1997, for the 
    Service Agreement.
    
    [[Page 60704]]
    
        PP&L states that copies of this filing have been supplied to GPU 
    and to the Pennsylvania Public Utility Commission.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. PP&L, Inc.
    
    [Docket No. ER98-177-000]
    
        Take Notice that on October 16, 1997, PP&L, Inc., (formally known 
    as Pennsylvania Power & Light Company) (PP&L), filed a Service 
    Agreement dated October 2, 1997, with Amoco Energy Trading Corporation 
    (Amoco) under PP&L's FERC Electric Tariff, Original Volume No. 1. The 
    Service Agreement adds Amoco as an eligible customer under the Tariff.
        PP&L requests an effective date of October 16, 1997, for the 
    Service Agreement.
        PP&L states that copies of this filing have been supplied to Amoco 
    and to the Pennsylvania Public Utility Commission.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Central Illinois Light Company
    
    [Docket No. ER98-178-000]
    
        Take notice that on October 16, 1997, Central Illinois Light 
    Company (CILCO), 300 Liberty Street, Peoria, Illinois 61202, tendered 
    for filing with the Commission a substitute Index of Customers under 
    its Coordination Sales Tariff and two service agreements for two new 
    customers, ProLiance Energy LLC and Virginia Electric and Power 
    Company.
        CILCO requested an effective date of October 10, 1997.
        Copies of the filing were served on the affected customers and the 
    Illinois Commerce Commission.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Wisconsin Power and Light Company
    
    [Docket No. ER98-179-000]
    
        Take notice that on October 16, 1997, Wisconsin Power and Light 
    Company (WP&L), tendered for filing Form Of Service Agreement for Non-
    Firm Point-to-Point Transmission Service establishing Kansas City Power 
    & Light Company as a point-to-point transmission customer under the 
    terms of WP&L's transmission tariff.
        WP&L requests an effective date of September 16, 1997, and; 
    accordingly, seeks waiver of the Commission's notice requirements. A 
    copy of this filing has been served upon the Public Service Commission 
    of Wisconsin.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Southern Company Services, Inc.
    
    [Docket No. ER98-180-000]
    
        Take notice that on October 16, 1997, Southern Company Services, 
    Inc. (SCSI), acting on behalf of Alabama Power Company, Georgia Power 
    Company, Gulf Power Company, Mississippi Power Company and Savannah 
    Electric and Power Company (collectively referred to as Southern 
    Companies) filed a service agreement under Southern Companies' Market-
    Based Rate Power Sales Tariff (FERC Electric Tariff, Original Volume 
    No. 4) with the following entity: Northern Indiana Public Service 
    Company. SCSI states that the service agreements will enable Southern 
    Companies to engage in short-term market-based rate sales to this 
    customer.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Florida Power Corporation
    
    [Docket No. ER98-182-000]
    
        Take notice that on October 16, 1997, Florida Power Corporation 
    (FPC), tendered for filing a service agreement between South Carolina 
    Electric and Gas and FPC for service under FPC's Market-Based Wholesale 
    Power Sales Tariff (MR-1), FERC Electric Tariff, Original Volume Number 
    8. This Tariff was accepted for filing by the Commission on June 26, 
    1997, in Docket No. ER97-2846-000. The service agreement is proposed to 
    be effective October 14, 1997.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Pennsylvania Power & Light Company
    
    [Docket No. ER98-183-000]
    
        Take notice that on October 15, 1997, Pennsylvania Power & Light 
    Company (PP&L), tendered for filing an Interconnection between PP&L and 
    Williams Generation Company--Hazelton.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. Rochester Gas and Electric Corporation
    
    [Docket No. ER98-184-000]
    
        Take notice that on October 14, 1997, Rochester Gas and Electric 
    Corporation (RG&E) filed a Service Agreement between RG&E and the New 
    Energy Ventures, L.L.C. (Customer). This Service Agreement specifies 
    that the Customer has agreed to the rates, term and conditions of 
    RG&E's FERC Electric Tariff, Original Volume No. 3 (Market-Based Rate 
    Tariff) accepted by the Commission in Docket No. ER97-3553-000.
        RG&E requests waiver of the Commission's sixty (60) day notice 
    requirements and an effective date of October 8, 1997, for the New 
    Energy Ventures, L.L.C. Service Agreement. RG&E has served copies of 
    the filing on the New York State Public Service Commission and on the 
    Customer.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. Additional Signatories to PJM Interconnection, L.L.C. Operating 
    Agreement
    
    [Docket No. ER98-185-000]
    
        Take notice that on October 14, 1997, the PJM Inter-connection, 
    L.L.C.(PJM) filed, on behalf of the Members of the LLC, membership 
    applications of Allegheny Electric Cooperative, Inc., MidCon Power 
    Services Corp., Commonwealth Edison Company and Edison Source. PJM 
    requests an effective date of October 16, 1997.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. Orange and Rockland Utilities, Inc.
    
    [Docket No. ER98-186-000]
    
        Take notice that on October 15, 1997, Orange and Rockland 
    Utilities, Inc. (O&R), tendered for filing pursuant to Part 35 of the 
    Federal Energy Regulatory Commission's Rules of Practice and Procedure, 
    18 CFR Part 35, a service agreement under which O&R will provide 
    capacity and/or energy to New Energy Ventures, L.L.C.(New Energy).
        O&R requests waiver of the notice requirement so that the service 
    agreement with New Energy becomes effective as of October 10, 1997.
        O&R has served copies of the filing on The New York State Public 
    Service Commission and New Energy.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. New England Power Pool
    
    [Docket No. ER98-187-000]
    
        Take notice that on October 15, 1997, the New England Power Pool 
    (NEPOOL or Pool) Executive Committee filed a request for termination of 
    membership in NEPOOL, with a retroactive date of October 1, 1997, of 
    Oceanside Energy, Inc., and Louis Dreyfus Electric Power, Inc., 
    (collectively, the Terminating
    
    [[Page 60705]]
    
    Participants). Such termination is pursuant to the terms of the NEPOOL 
    Agreement dated September 1, 1971, as amended, and previously signed by 
    each of the Terminating Participants. The New England Power Pool 
    Agreement, as amended (the NEPOOL Agreement), has been designated 
    NEPOOL FPC No. 2.
        The Executive Committee states that termination of the Terminating 
    Participants with a retroactive date of October 1, 1997, would relieve 
    those entities, at their individual requests, of the obligations and 
    responsibilities of Pool membership and would not change the NEPOOL 
    Agreement in any manner, other than to remove the Terminating 
    Participants from membership in the Pool. Neither of the Terminating 
    Participants has received any energy related services (such as 
    scheduling, transmission, capacity or energy services) under the NEPOOL 
    Agreement.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. Allegheny Power Service Corporation, on behalf of Monongahela Power 
    Company The Potomac Edison Company, and West Penn Power Company 
    (Allegheny Power)
    
    [Docket No. ER98-188-000]
    
        Take notice that on October 16, 1997, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, the Potomac Edison 
    Company and West Penn Power Company (Allegheny Power), filed Supplement 
    No. 25 to add Avista Energy, CNG Retail Services Corporation, Entergy 
    Power Marketing Corporation, New Energy Ventures, L.L.C., QST Energy 
    Trading Inc., and Williams Energy Services Company to Allegheny Power 
    Open Access transmission Service Tariff which has been submitted for 
    filing by the Federal Energy Regulatory Commission in Docket No. OA96-
    18-000. The proposed effective date under the Service Agreements is 
    October 15, 1997.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the Virginia State Corporation 
    Commission, the West Virginia Public Service Commission.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Northern States Power Company (Wisconsin Company)
    
    [Docket No. ER98-189-000]
    
        Take notice that on October 16, 1997, Northern States Power 
    Company-Wisconsin (NSP), tendered the Second Amendment to the Power and 
    Energy Supply Agreement between NSP and the City of Spooner. NSP 
    requests an effective date of October 25, 1997.
        A copy of the filing was served upon each of the parties named in 
    the Service List.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. Texas Utilities Electric Company
    
    [Docket No. ER98-190-000]
    
        Take notice that on October 16, 1997, Texas Utilities Electric 
    Company (TU Electric), tendered for filing an executed transmission 
    service agreement (TSA) with Avista Energy, Inc., for certain Economy 
    Energy Transmission Service transactions under TU Electric's Tariff for 
    Transmission Service To, From and Over Certain HVDC Interconnections.
        TU Electric requests an effective date for the TSA that will permit 
    it to become effective on or before the service commencement date under 
    the TSA. Accordingly, TU Electric seeks waiver of the Commission's 
    notice requirements. Copies of the filing were served on Avista Energy, 
    Inc., as well as the Public Utility Commission of Texas.
        Comment date: November 17, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. Pacific Gas and Electric Company, San Diego Gas & Electric Company, 
    and Southern California Edison Company
    
    [Docket No. EC98-12-000]
    
        Take notice that Pacific Gas and Electric Company, San Diego Gas & 
    Electric, Company and Southern California Edison Company (the 
    Companies), on October 27, 1997, tendered for filing a Joint 
    Application For Authorization To Permit The Use of Designated Energy 
    Management Facilities And Systems By The California Independent System 
    Operator Corporation. This application requests authorization for the 
    use (including the shared use) by the California Independent System 
    Operator (ISO) of certain Companies' energy management facilities and 
    systems. The application describes the energy management facilities and 
    systems as certain portions of the Companies' communications 
    infrastructure, power system monitoring and control systems, computers, 
    and computer software.
        Comment date: November 26, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. Cataula Generating Company, L.P.
    
    [Docket No. EC98-13-000]
    
        Take notice that Cataula Generating Company, L.P., (Cataula) on 
    October 29, 1997, tendered for filing a Petition that the Commission 
    approve a disposition of facilities and grant any other authorization 
    the Commission may deem to be required under Section 203 of the Federal 
    Power Act in connection with a proposed sale of all of the stock of 
    Peach II Power Corporation, a partner in Cataula, to PG&E Generating 
    Company.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    22. Amoco Canada Power Resources Company
    
    [Docket No. EG98-5-000]
    
        On October 29, 1997, Amoco Canada Power Resources Company, a 
    company formed under the laws of Nova Scotia, whose address is c/o 
    Amoco Canada Petroleum Company Ltd., 240 4th Avenue S.W., Calgary, 
    Alberta, Canada, T2P 4H4 (the Applicant), filed with the Federal Energy 
    Regulatory Commission an application for determination of exempt 
    wholesale generator (EWG) status pursuant to Part 365 of the 
    Commission's Regulations.
        The Applicant will be engaged directly in owning and operating 
    eligible facilities to be constructed in Canada: the 84 MW Primrose 
    power plant to be located near Bonnyville, Alberta, consisting of one 
    General Electric natural-gas fired combustion turbine and electric 
    generator and associated equipment and real estate. The turbine is 
    natural gas-fired only.
        Comment date: November 20, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies
    
    [[Page 60706]]
    
    of this filing are on file with the Commission and are available for 
    public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-29731 Filed 11-10-97; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
11/12/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-29731
Dates:
November 17, 1997, in accordance with Standard Paragraph E at the end of this notice.
Pages:
60703-60706 (4 pages)
Docket Numbers:
Docket No. ER98-171-000, et al.
PDF File:
97-29731.pdf