[Federal Register Volume 63, Number 218 (Thursday, November 12, 1998)]
[Notices]
[Page 63311]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-30178]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing; Notice That the
Application Is Not Ready for Environmental Analysis; Notice of
Solicitation of Interventions and Protests
November 5, 1998.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Major New License.
b. Project No.: 372-008.
c. Date filed: June 12, 1998.
d. Applicant: Southern California Edison Company.
e. Name of Project: Lower Tule River Hydroelectric Project.
f. Location: On the North and South Forks of the Middle Fork Tule
River in Tulare County, California, partially within the boundaries of
the Sequoia National Forest.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. Secs. 791(a)-
825(r).
h. Applicant Contact: Mr. C. Edward Miller, Manager, Hydro
Generation, Southern California Edison Company, 2244 Walnut Grove
Avenue, P.O. Box 800, Rosemead, California 91770, (626) 302-1564.
i. FERC Contact: Nan Allen at (202) 219-2938.
j. Deadline Date: 60 days from the issuance date of this notice.
k. Description of the Project: The existing project consists of:
(1) A 15-foot-high, concrete dam; (2) a 5-foot-high, rubble masonry
dam; (3) a 31,802-foot-long flow line; (4) a 2,815-foot-long steel
penstock; (5) a 3.37 acre-foot forebay; (6) a powerhouse containing two
turbine-generator units with a total installed capacity of 2,520
kilowatts (kW); and (7) a 2,352-foot-long tailrace.
l. Locations of the Application: A copy of the application is
available for inspection or reproduction at the Commission's Public
Reference and Files Maintenance Branch, located at 888 First Street,
NE, Room 2A-1, Washington, DC 20426, or by calling (202) 208-2326. A
copy of the application may also be viewed or printed by accessing the
Commission's WebSite on the Internet at www.ferc.fed.us. For assistance
users call (202) 208-2222. A copy is also available for inspection and
reproduction at the Southern California Edison Company, 2244 Walnut
Grove Avenue, Rosemead, California 91770 (626) 302-1564.
m. Status of Application and Environmental Analysis: This
application has been accepted for filing, but it is not ready for
environmental analysis. See attached paragraph E1.
n. Invitation to Intervene or Protest: Intervenors are reminded of
the Commission's Rules of Practice and Procedure requiring parties
filing documents with the Commission to serve a copy of the document on
each person whose name appears on the official service list for the
project. Further, if a party or intervenor files comments or documents
with the Commission relating to the merits of an issue that may affect
the responsibilities of a particular resource agency, they must also
serve a copy of the document on that resource agency. See attached
paragraph B1.
o. This notice contains the standard paragraphs B1 and E1.
B1. Protests or Motions to Intervene--Anyone may submit a protest
or a motion to intervene in accordance with the requirements of Rules
of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
E1. Filing and Service of Responsive Documents--The application is
not ready for environmental analysis at this time; therefore, the
Commission is not now requesting comments, recommendations, terms and
conditions, or prescriptions.
When the application is ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. Any of these documents must be filed by providing the
original and the number of copies required by the Commission's
regulations to: The Secretary, Federal Energy Regulatory Commission,
888 First Street, NE, Washington, DC 20426. An additional copy must be
sent to Director, Division of Project Review, Office of Hydropower
Licensing, Federal Energy Regulatory Commission, at the above address.
A copy of any protest or motion to intervene must be served upon each
representative of the applicant specified in the particular
application.
David P. Boergers,
Secretary.
[FR Doc. 98-30178 Filed 11-10-98; 8:45 am]
BILLING CODE 6717-01-M