98-30209. Drawbridge Operation Regulations: Harlem River, NY
[Federal Register Volume 63, Number 218 (Thursday, November 12, 1998)]
[Rules and Regulations]
[Page 63180]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-30209]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Coast Guard
33 CFR Part 117
[CGD01-98-156]
Drawbridge Operation Regulations: Harlem River, NY
AGENCY: Coast Guard, DOT.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The District Commander, First Coast Guard District has issued
a temporary deviation from the regulations listed under 33 CFR 117.789,
governing the operation of the Broadway Bridge, mile 6.8, across the
Harlem River in New York City. This deviation allows the bridge owner,
the New York City Department of Transportation (NYCDOT), to keep the
bridge in the closed position from October 21, 1998 to November 30,
1998, to facilitate repairs. Vessels which can pass under the bridge
without a bridge opening may do so at any time.
DATES: This deviation is effective from October 21, 1998 through
November 30, 1998.
FOR FURTHER INFORMATION CONTACT:
Ms. Judy Yee, Project Manager, Bridge Branch at (212) 668-7165.
SUPPLEMENTARY INFORMATION: The Broadway Bridge, mile 6.8, over the
Harlem River has a vertical clearance of 24 feet at mean high water
(MHW) and 29 feet at mean low water (MLW) in the closed position.
The City of New York requested a temporary deviation from the
operating regulations for the Broadway Bridge because the bridge is
presently unable to open as a result of a start up transformer and
contacts failure. The parts necessary to perform the repairs are no
longer stock items and must be custom manufactured from specifications.
Vessels that can pass under the bridge without an opening may do so at
all times during this closed period.
This deviation to the operating regulations will allow the bridge
to remain in the closed position from October 21, 1998 to November 30,
1998. This deviation from the normal operating regulations is
authorized under 33 CFR 117.35.
Dated: October 27, 1998.
R.M. Larrabee,
Rear Admiral, U.S. Coast Guard, Commander, First Coast Guard District.
[FR Doc. 98-30209 Filed 11-10-98; 8:45 am]
BILLING CODE 4910-15-M
Document Information
- Effective Date:
- 10/21/1998
- Published:
- 11/12/1998
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Notice of temporary deviation from regulations.
- Document Number:
- 98-30209
- Dates:
- This deviation is effective from October 21, 1998 through November 30, 1998.
- Pages:
- 63180-63180 (1 pages)
- Docket Numbers:
- CGD01-98-156
- PDF File:
-
98-30209.pdf
- CFR: (1)
- 33 CFR 117