99-29506. Drawbridge Operation Regulations: Niantic River, CT  

  • [Federal Register Volume 64, Number 218 (Friday, November 12, 1999)]
    [Rules and Regulations]
    [Pages 61518-61519]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-29506]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Coast Guard
    
    33 CFR Part 117
    
    [CGD01-99-087]
    RIN 2115-AE47
    
    
    Drawbridge Operation Regulations: Niantic River, CT
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Final Rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Coast Guard is changing the drawbridge operation 
    regulations governing the S156 Bridge, mile 0.1, across the Niantic 
    River, at Niantic, Connecticut. The bridge owner asked the Coast Guard 
    to change the regulations to require a six-hour advance notice for 
    openings at night during the winter months because there have been no 
    requests to open the bridge during that time period. This final rule is 
    expected to relieve the bridge owner of the burden of crewing the 
    bridge at all times and still meet the needs of navigation.
    
    DATES: This final rule is effective December 13, 1999.
    
    ADDRESSES: Documents as indicated in this preamble are available for 
    inspection or copying at the First Coast Guard District Office, 408 
    Atlantic Avenue, Boston, Massachusetts, 02110, 7 a.m. to 3 p.m., Monday 
    through Friday, except Federal holidays. The telephone number is (617) 
    223-8364.
    
    FOR FURTHER INFORMATION CONTACT: John W. McDonald, Project Officer, 
    First Coast Guard District, (617) 223-8364.
    
    SUPPLEMENTARY INFORMATION:
    
    Regulatory History
    
        On August 13, 1999, the Coast Guard published a notice of proposed 
    rulemaking entitled Drawbridge Operation Regulations; Niantic River, 
    Connecticut, in the Federal Register (64 FR 44149). The Coast Guard 
    received no comments in response to the notice of proposed rulemaking. 
    No public hearing was requested and none was held.
    
    Background
    
        The S156 Bridge, mile 0.1, across the Niantic River, at Niantic, 
    Connecticut, has a vertical clearance of 9 feet at mean high water and 
    12 feet at mean low water.
        The existing operating regulations listed at 33 CFR 117.215(b) 
    require the bridge to open on signal; except that, from 7 a.m. to 8 
    a.m., and 4 p.m. to 5 p.m., Monday through Friday, except holidays, the 
    draw shall open only for the passage of commercial vessels.
        The owner of the bridge, the Connecticut Department of 
    Transportation (CONNDOT) has asked the Coast Guard to change the
    
    [[Page 61519]]
    
    regulations to require a six-hour advance notice for openings from 8 
    p.m. to 4 a.m., December 1 through March 31. The bridge opening log 
    data for 1998, and 1999, December through March, 8 p.m. to 4 a.m., 
    indicate no requests to open the bridge.
    
    Discussion of Comments and Changes
    
        The Coast Guard received no comments in response to the notice of 
    proposed rulemaking and no changes have been made to this final rule.
    
    Regulatory Evaluation
    
        This final rule is not a significant regulatory action under 
    section 3(f) of Executive Order 12866 and does not require an 
    assessment of potential costs and benefits under section 6(a)(3) of 
    that Order. It has not been reviewed by the Office of Management and 
    Budget under that Order. It is not significant under the regulatory 
    policies and procedures of the Department of Transportation (DOT) (44 
    FR 11040; February 26, 1979). The Coast Guard expects the economic 
    impact of this final rule to be so minimal that a full Regulatory 
    Evaluation under paragraph 10e of the regulatory policies and 
    procedures of DOT is unnecessary. This conclusion is based on the fact 
    that the bridge has not had any requests to open in 1998 and 1999, 
    December through March, from 8 p.m. to 4 a.m. Mariners will still be 
    able to obtain bridge openings during the regulated time period 
    provided they give six-hour notice.
    
    Small Entities
    
        Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
    Coast Guard considered whether this final rule will have a significant 
    economic impact on a substantial number of small entities. ``Small 
    entities'' include small businesses, not-for profit organizations that 
    are independently owned and operated and are not dominant in their 
    fields, and governmental jurisdictions with populations less than 
    50,000. Therefore, for reasons discussed in the Regulatory Evaluation 
    section above, the Coast Guard certifies under section 605(b) of the 
    Regulatory Flexibility Act (5 U.S.C. 601 et seq.) that this final rule 
    will not have a significant economic impact on a substantial number of 
    small entities.
    
    Collection of Information
    
        This final rule does not provide for a collection of information 
    under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
    
    Federalism
    
        The Coast Guard has analyzed this final rule in accordance with the 
    principles and criteria contained in Executive Order 13132 and has 
    determined that this final rule does not have federalism implications 
    under that Order.
    
    Environment
    
        The Coast Guard considered the environmental impact of this final 
    rule and concluded that, under Section 2.B.2., Figure 2-1, paragraph 
    (32)(e), of Commandant Instruction M16475.1C, this final rule is 
    categorically excluded from further environmental documentation because 
    promulgation of changes to drawbridge regulations have been found to 
    not have a significant effect on the environment. A written 
    ``Categorical Exclusion Determination'' is not required for this final 
    rule.
    
    List of Subjects in 33 CFR Part 117
    
        Bridges.
    
    Regulations
    
        For the reasons set out in the preamble, the Coast Guard amends 33 
    CFR part 117 as follows:
    
    PART 117--DRAWBRIDGE OPERATION REGULATIONS
    
        1. The authority citation for part 117 continues to read as 
    follows:
    
        Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 CFR 1.05-1(g); section 
    117.255 also issued under the authority of Pub. L. 102-587, 106 
    Stat. 5039.
    
        2. Section 117.215(b) is revised to read as follows:
    
    
    Sec. 117.215  Niantic River
    
    * * * * *
        (b) The draw of the S156 Bridge, mile 0.1, at Niantic, shall open 
    on signal; except that, from 7 a.m. to 8 a.m., and 4 p.m. to 5 p.m., 
    Monday through Friday, except holidays, the draw shall open only for 
    the passage of commercial vessels. From December 1 through March 31, 
    from 8 p.m. to 4 a.m., the draw shall open on signal if at least six 
    hours notice is given by calling the number posted at the bridge.
    
        Dated: October 28, 1999.
    Robert F. Duncan,
    Captain, U.S. Coast Guard Acting Commander, First Coast Guard District
    [FR Doc. 99-29506 Filed 11-10-99; 8:45 am]
    BILLING CODE 4910-15-P
    
    
    

Document Information

Effective Date:
12/13/1999
Published:
11/12/1999
Department:
Coast Guard
Entry Type:
Rule
Action:
Final Rule.
Document Number:
99-29506
Dates:
This final rule is effective December 13, 1999.
Pages:
61518-61519 (2 pages)
Docket Numbers:
CGD01-99-087
RINs:
2115-AE47: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/2115-AE47/drawbridge-regulations
PDF File:
99-29506.pdf
CFR: (1)
33 CFR 117.215