99-29708. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 64, Number 218 (Friday, November 12, 1999)]
    [Notices]
    [Pages 61635-61637]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-29708]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-6248-1]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared October 25, 1999 Through 
    October 29, 1999 pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 564-7167.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 10, 1999 (63 
    FR 17856).
    
    Draft EISs
    
        ERP No. D-AFS-K65220-NV Rating LO, Cave Rock Management Direction, 
    Implementation, Lake Tahoe Basin Management Unit, Douglas County, NV.
        Summary: EPA had no objections to the proposed project, and 
    encouraged the Forest Service to continue consulting with the Washoe 
    Tribe.
        ERP No. D-AFS-L65329-AK Rating, Skipping Cow Timber Sale, 
    Harvesting Timber, South half of Zarembo Island, Tongass National 
    Forest, Wrangell Ranger District.
        Summary: EPA Region 10 used a screening tool to conduct a limited 
    review of this action. Based on this screen, EPA does not foresee 
    having any environmental objections to the proposed project. Therefore, 
    EPA will not be conducting a detailed review.
        ERP No. D-BLM-K61148-NV Rating LO, Red Rock Canyon National 
    Conservation Area (RRCNCA), General Management Plan (GMP), Amendment to 
    the Las Vegas Resource Management Plan, Las Vegas, NV.
        Summary: EPA expressed a lack of objections to the proposed General 
    Management Plan, but recommended that BLM develop more specific plans 
    to address water quality and vegetation impacts from wild horses and 
    burros.
        ERP No. D-BLM-K67050-NV Rating EC2, South Pipeline Mine Project, 
    Proposal to Extend Gold Mining Operations, Implementation, Lander 
    County, NV.
        Summary: EPA expressed concerns regarding the project's potential 
    impacts to vegetation and waters of the U.S. EPA requested additional 
    information be provided on pit backfiling design, pit lake 
    geochemistry, air impacts, reclamation and bonding, and mitigation 
    measures.
        ERP No. D-COE-E39051-FL Rating EC2, Lake Okeechobee Regulation 
    Schedule Study, To Maintain or Improve Existing Water Storage, St. 
    Lucie and Caloosahatchee River Estuaries, FL.
        Summary: EPA expressed environmental concern about changing the 
    water release schedule of Lake Okeechobee via implementation of the 
    Water Supply and Environmental alternative, but believes that the 
    additional information being developed can address outstanding issues.
        ERP No. D-DOE-E09804-FL Rating EC2, JEA Circulating Fluidized Bed 
    (CFB) Combustor Project, 300 Megawatt-Electric, Coal and Petroleum 
    Coke-Fired, CFB Combustor and Boiler to Repower an existing Steam 
    Turbine at JEA's North-side Generating Station Construction and 
    Operation, Funding, Jacksonville, Duval County, FL.
        Summary: EPA has environmental concerns with the Clean Coal 
    Technology (CCT) Program demonstration project draft EIS. EPA requests 
    that DOE provide additional information on noise impacts and 
    mitigation, air quality, and health-based criteria in the Final EIS.
        ERP No. D-DOE-L00007-00 Rating EC2, Sodium-Bonded Spent Nuclear 
    Fuel for the Treatment and
    
    [[Page 61636]]
    
    Management, Candidate Sites are Argonne National Laboratory--West (ANL-
    W) Located within the boundaries of the Idaho National Laboratory I and 
    the Savannah River Sites (SRS) F-Area and L Area, SC.
        Summary: EPA expressed concerns about the lack of a demonstrated 
    need to treat spent nuclear fuels at the present time. Moreover, DOE 
    issued the draft EIS before finishing its final testing on the cost and 
    treatment-effectiveness of the electrometallurgical process, a process 
    proposed in five of the six action alternative. EPA requested that 
    information related to these issues be included in the EIS.
        ERP No. D-FHW-J40149-CO Rating EC2, Colorado Forest Highway 80, 
    Guanella Pass Road (also known as Park County Road 62/Clear Creek 
    County Road 381/Forest Development Road 118) from US 285 in Grant to 
    Georgetown, Improvements, Funding and COE Section 404, NPDES and 
    Special Use Permits Issuance, Park and Clear Creek Counties, CO.
        Summary: EPA expressed concerns regarding potential impacts to the 
    alpine environment, especially wetlands, sediment control and wild 
    life. EPA also recommended that the 404 CWA permit process be 
    integrating with the FEIS.
        ERP No. D-FHW-J54000-CO Rating EC2, Southeast Corridor Multi-Modal 
    Project, To Improve Travel between Central and Southeast Corridors, 
    Light Rail Transit (LRT), Colorado Metropolitan Area, Denver, CO.
        Summary: EPA expressed concern regarding air quality, wetland and 
    potential cumulative impacts. EPA required additional information and 
    clarification related to these issues.
        ERP No. D-FHW-K40236-HI Rating EC2, Kihei-Upcounty Maui Highway, 
    Transportation Improvements, Funding and COE Section 404 Permit, County 
    of Maui, HI.
        Summary: EPA expressed environmental concerns regarding potential 
    impacts to water quality and wetlands. EPA recommended that FHWA and 
    the Hawaii Transportation Department design, construct and operate the 
    project to avoid and minimize adverse impacts to water resources to the 
    fullest extent possible.
        ERP No. D-FTA-K40237-CA Rating LO, Orange County CenterLine 
    Project, Transportation Improvements, Advanced Rail Transit in the 
    Heart of Orange County, Funding and COE Section 404 Permit, Orange 
    County, CA.
        Summary: EPA had no comments on the proposed light rail project.
        ERP No. D-FTA-K40238-CA Rating LO, Downtown Sacramento--Folsom 
    Corridor, To Improve Transit Services, US 50/Folsom Boulevard, COE 
    Section 404 Permit, Transportation Systems Management (TSM) and Light 
    Rail Transit (LRT), City and County of Sacramento, CA.
        Summary: EPA has no objection to the proposed action.
        ERP No. D-NPS-L65328-AK Rating EO2, Spruce Creek Access Project, 
    Construct and Operation. Denali National Park and Preserve, NPDES and 
    COE Section 404 Permits, AK.
        Summary: EPA objected to the proposed action, as there are other 
    viable options that would be less impacting to fish habitat and water 
    quality. EPA has no objections to the air access alternative or the no 
    action alternative. EPA recommended that additional, protect-level 
    information be included in the EIS, along with additional analysis/
    discussion of road maintenance and potential implications on Park 
    management plans and policies.
        ERP No. D-USN-A10072-00 Rating EC2, Surveillance Towed Array Sensor 
    System (SURTASS) Low Frequency Active (LFA), To Improved Capability to 
    Detect Quiter and Harder-to-Find Foreign Submarines, Implementation.
        Summary: EPA expressed concerns about the potential impacts to 
    marine animals and recommended that the information from the biological 
    opinion rendered from the Department of Commerce's National Marine 
    Fisheries Service be included in the final EIS.
        ERP No. D-USN-K11099-NV Rating EC2, Fallon Naval Air Station (NAS), 
    Proposal for the Fallon Range Complex Requirements, Federal and Private 
    Lands, Churchill, Eureka, Lander, Mineral, Nye and Washoe Counties, NV.
        Summary: EPA expressed concerns regarding cumulative impacts to 
    lands given the long history of bombing and gunnery activity. EPA 
    requested that more comprehensive information about past contamination, 
    clean up, and future potential impacts be included in the Final EIS.
    
    Final EISs
    
        ERP No. F-AFS-E65051-AL Longleaf Restoration Project, Implement a 
    Systematic Five-Year Program for Restoration of the Native Longleaf 
    Pine, Conecuh National Forest, Conecuh Ranger District, Covington and 
    Escambia Counties, AL.
        Summary: EPA has no objections to the project, provided that the 
    mitigation measures and monitoring programs are implemented as 
    described in the FEIS.
        ERP No. F-AFS-L67036-OR Nicore Mining Project, Implementation, 
    Plan-of-Operations, Mining of Four Sites, Road Construction, 
    Reconstruction, Hauling and Stockpiling of Ore, Rough and Ready Creek 
    Watershed, Illinois Valley Ranger District, Siskiyou National Forest, 
    Medford District, Josephine County, OR.
        Summary: EPA expressed lack of objections.
        ERP No. F-FHW-G40149-NM US 84/285 Highway Transportation 
    Improvements from Alamo Drive in Santa Fe to Viarrial Street in 
    Pojoaque, Right-of-Way Acquisition, NPDES Permit and COE Section 404 
    Permit, Santa Fe County, NM.
        Summary: No formal comment letter sent to lead agency.
        ERP No. F-FHW-K40229-HI Saddle Road (HI-200) Improvements between 
    Mamalahoa Highway (HI-190) to Milepost 6 near Hilo, Funding, NPDES and 
    COE Section 404 Permit, Hawaii County, HI.
        Summary: EPA continues to be concerned about quantities and quality 
    of mitigation for significant individual direct and indirect adverse 
    impacts to water quality, wetlands, and threatened and endangered 
    species habitats.
        ERP No. F-FHW-L40211-AK C Street Corridor Project, Improvements 
    from O'Malley Road to International Airport Road, NPDES and COE Section 
    404 Permits, Municipality of Anchorage, AK.
        Summary: No formal comment letter sent to the lead agency.
        ERP No. F-FRC-J05078-MT Missouri-Madison Hydroelectric (FERC No. 
    2188) Project, Issuing a New license (Relicense) for Nine Dams and 
    Associated Facilities, MT.
        Summary: EPA expressed environmental concerns regarding FERC's 
    rejection of certain State and Federal fish and wildlife agency 
    recommendations, and the need to establish Madison River thermal 
    success criteria. EPA also requested that license conditions be 
    included to allow the license to be re-opened if thermal success 
    criteria are not adequately attained by the proposed mitigation.
        ERP No. F-NRS-K36126-HI Lower Hamakua Ditch Watershed Plan, To 
    Provide a Stable and Affordable Supply of Agricultural Water to Farmer 
    and Other, COE Section 404 Permit, Watershed Protection and Flood 
    Prevention, Hawaii County, HI.
        Summary: No formal comment letter was sent to the preparing agency.
        ERP No. FS-NOA-B91005-00 Northeast Multispecies Fishery Management 
    Plan, Updated Information concerning Overfishing of Red Hake and Silver 
    Hake Fishiers, Northeast United States.
        Summary: EPA had no comments on the project.
    
    
    [[Page 61637]]
    
    
        Dated: November 9, 1999.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 99-29708 Filed 11-10-99; 8:45 am]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
11/12/1999
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
99-29708
Pages:
61635-61637 (3 pages)
Docket Numbers:
ER-FRL-6248-1
PDF File:
99-29708.pdf