    On July 29, 2003, Illinois submitted a site-specific sulfur dioxide (SO2) State Implementation Plan (SIP) revision request for the Central Illinois Light Company's Edwards Generating Station in Peoria County, Illinois (CILCO Edwards). This revision request is identical to an earlier temporary SIP revision, which EPA approved on April 13, 2000 (65 FR 19838). Therefore, EPA is approving the July 29, 2003, permanent SIP revision request.

    DATES:

    This “direct final” rule is effective on January 11, 2005 unless EPA receives adverse written comments by December 13, 2004. If adverse comment is received, EPA will publish a timely withdrawal of the rule in the Federal Register and inform the public that the rule will not take effect.

    ADDRESSES:

    Submit comments, identified by Regional Material in EDocket (RME) ID No. R05-OAR-2004-IL-0003, by one of the following methods:

    Federal eRulemaking Portal: http://www.regulations.gov. Follow the on-line instructions for submitting comments.

    Agency Web site: http://docket.epa.gov/​rmepub/​. Regional Material in EDocket (RME), EPA's electronic public docket and comments system, is EPA's preferred method for receiving comments. Once in the system, select “quick search,” then key in the appropriate RME Docket identification number. Follow the on-line instructions for submitting comments.

    E-mail: bortzer.jay@epa.gov.

    Fax: (312) 886-5824.

    Mail: You may send written comments to: J. Elmer Bortzer, Chief, Air Programs Branch, (AR-18J), U.S. Environmental Protection Agency, 77 West Jackson Boulevard, Chicago, Illinois 60604.

    Hand delivery: Deliver your comments to: J. Elmer Bortzer, Chief, Air Programs Branch (AR-18J), U.S. Environmental Protection Agency, Region 5, 77 West Jackson Boulevard, 18th floor, Chicago, Illinois 60604.

    Such deliveries are only accepted during the Regional Office's normal hours of operation. The Regional Office's official hours of business are Monday through Friday, 8:30 a.m. to 4:30 p.m. excluding Federal holidays.

    Instructions: Direct your comments to Regional Material in EDocket (RME) ID No. R05-OAR-2004-IL-0003. EPA's policy is that all comments received will be included in the public docket without change, including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose Start Printed Page 65379disclosure is restricted by statute. Do not submit information that you consider to be CBI or otherwise protected through Regional Material in EDocket (RME), regulations.gov, or e-mail. The EPA RME Web site and the federal regulations.gov Web site are “anonymous access” systems, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an e-mail comment directly to EPA without going through RME or regulations.gov, your e-mail address will be automatically captured and included as part of the comment that is placed in the public docket and made available on the Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact information in the body of your comment and with any disk or CD-ROM you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. Electronic files should avoid the use of special characters, any form of encryption, and be free of any defects or viruses. For additional instructions on submitting comments, go to Section I of the SUPPLEMENTARY INFORMATION section of the related proposed rule which is published in the Proposed Rules section of this Federal Register.

    Docket: All documents in the electronic docket are listed in the Regional Material in EDocket (RME) index at http://docket.epa.gov/​rmepub/​index.jsp. Although listed in the index, some information is not publicly available, i.e., Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Publicly available docket materials are available either electronically in RME or in hard copy at Environmental Protection Agency, Region 5, Air and Radiation Division, 77 West Jackson Boulevard, Chicago, Illinois 60604. (We recommend that you telephone Mary Portanova, Environmental Engineer, at (312) 353-5954 before visiting the Region 5 office.) This Facility is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mary Portanova, Environmental Engineer, Criteria Pollutant Section, Air Programs Branch, EPA Region 5, Chicago, Illinois 60604, (312) 353-5954, portanova.mary@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The supplementary information is organized in the following order:

    I. General Information

    A. Does This Action Apply to Me?

    B. How Can I Get Copies of This Document and Other Related Information?

    C. How and To Whom Do I Submit Comments?

    II. What Action Is Being Taken in This Document?

    III. What Has Changed in the Illinois SO2 SIP?

    IV. What Is EPA's Final Rulemaking Action?

    V. Statutory and Executive Order Reviews

    I. General Information

    A. Does This Action Apply to Me?

    This action applies to a single source, CILCO Edwards Generating Station, in Peoria County, IL.

    B. How Can I Get Copies of This Document and Other Related Information?

    1. The Regional Office has established an electronic public rulemaking file available for inspection at Regional Material in EDocket (RME) under RME ID No. R05-OAR-2004-IL-0003, and a hard copy file which is available for inspection at the Regional Office. The official public file consists of the documents specifically referenced in this action, any public comments received, and other information related to this action. Although a part of the official docket, the public rulemaking file does not include Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. The official public rulemaking file is the collection of materials that is available for public viewing at the Air Programs Branch, Air and Radiation Division, EPA Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604. EPA requests that if at all possible, you contact the person listed in the FOR FURTHER INFORMATION CONTACT section to schedule your inspection. The Regional Office's official hours of business are Monday through Friday, 8:30 a.m. to 4:30 p.m. excluding Federal holidays.

    2. Electronic Access. You may access this Federal Register document electronically through the regulations.gov Web site located at http://www.regulations.gov where you can find, review, and submit comments on Federal rules that have been published in the Federal Register, the Government's legal newspaper, and are open for comment.

    For public commenters, it is important to note that EPA's policy is that public comments, whether submitted electronically or in paper, will be made available for public viewing at the EPA Regional Office, as EPA receives them and without change, unless the comment contains copyrighted material, CBI, or other information whose disclosure is restricted by statute. When EPA identifies a comment containing copyrighted material, EPA will provide a reference to that material in the version of the comment that is placed in the official public rulemaking file. The entire printed comment, including the copyrighted material, will be available at the Regional Office for public inspection.

    C. How and To Whom Do I Submit Comments?

    You may submit comments electronically, by mail, or through hand delivery/courier. To ensure proper receipt by EPA, identify the appropriate rulemaking identification number by including the text “Public comment on proposed rulemaking Region 5 Air Docket “R05-OAR-2004-IL-0003” in the subject line on the first page of your comment. Please ensure that your comments are submitted within the specified comment period. Comments received after the close of the comment period will be marked “late.” EPA is not required to consider these late comments.

    For detailed instructions on submitting public comments and on what to consider as you prepare your comments see the ADDRESSES section and the section I General Information of the SUPPLEMENTARY INFORMATION section of the related proposed rule which is published in the Proposed Rules section of this Federal Register.

    II. What Action Is Being Taken in This Document?

    EPA is approving a site-specific request to revise Illinois' SO2 SIP for CILCO Edwards in Bartonville, Illinois. The requested revision limits the SO2 emissions of the plant's three boilers. On April 15, 1999, the Illinois Pollution Control Board (IPCB) granted CILCO Edwards a variance to the SO2 emission limits of 35 Illinois Administrative Code (IAC) 214.141. EPA approved the variance on April 13, 2000 (65 FR 19838). Under the terms of the variance, CILCO Edwards could apply to the IPCB to convert the variance to a permanent site-specific SIP revision. If CILCO Edwards chose not to apply for permanence, the variance was to expire on February 28, 2002. CILCO Edwards did apply for permanence, filing its petition of site-specific rulemaking with the Office of the Clerk of the IPCB on April 26, 2002. The Notice of Hearing for this petition was filed August 21, 2002, and the public hearing was held on October 11, 2002. The IPCB adopted the variance's emission limits into 35 Start Printed Page 65380IAC 214.561, and Illinois submitted this rule to the EPA as a SIP revision request on July 29, 2003.

    The regulatory language in 35 IAC 214.561, as published in the Illinois Register on July 25, 2003 (27 IR 12101), is identical to the language which the EPA approved as a SIP revision on April 13, 2000 (65 FR 19838). Therefore, the EPA is relying on the April 13, 2000 action to support its rulemaking action on Illinois' July 29, 2003 request. For further information, please see 65 FR 19838.

    III. What Has Changed in the Illinois SO2 SIP?

    This SIP revision request simply makes permanent the following SO2 emission limits in the Illinois SIP at 35 IAC 214.561: CILCO Edwards operates three boilers, numbered 1, 2, and 3. The average SO2 emissions from Boilers 1, 2, and 3, as a group, may not exceed 4.71 lb/MMBTU actual heat input.

    The average SO2 emissions from any one boiler may not exceed 6.6 lb/MMBTU actual heat input.

    CILCO Edwards must determine compliance with these limits on a daily basis using the SO2 methodology of the Phase II Acid Rain program set forth in 40 CFR part 75.

    A plantwide SO2 emissions limit for CILCO Edwards limits Boilers 1, 2, and 3, as a group, to 34,613 pounds SO2 per hour (lb/hr) on a 24-hour average. Compliance with the plantwide limit must also be determined on a daily basis using the Phase II Acid Rain methodology.

    IV. What Is EPA's Final Rulemaking Action?

    EPA is approving the July 29, 2003, site-specific SO2 SIP revision request for the Central Illinois Light Company's Edwards Generating Station in Peoria County, Illinois.

    V. Statutory and Executive Order Reviews

    Executive Order 12866: Regulatory Planning and Review

    Under Executive Order 12866 (58 FR 51735, October 4, 1993), this action is not a “significant regulatory action” and therefore is not subject to review by the Office of Management and Budget.

    Executive Order 13211: Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use

    For the above reason, this action is also not subject to Executive Order 13211, “Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use” (66 FR 28355, May 22, 2001).

    Regulatory Flexibility Act

    This action merely approves State law as meeting Federal requirements and imposes no additional requirements beyond those imposed by State law. Accordingly, the Administrator certifies that this rule will not have a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.).

    Unfunded Mandates Reform Act

    Because this rule approves pre-existing requirements under State law and does not impose any additional enforceable duty beyond that required by State law, it does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4).

    Executive Order 13175: Consultation and Coordination With Indian Tribal Governments

    This rule also does not have tribal implications because it will not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000).

    Executive Order 13132: Federalism

    This action also does not have Federalism implications because it does not have substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). This action merely approves a State rule implementing a Federal standard, and does not alter the relationship or the distribution of power and responsibilities established in the Clean Air Act.

    Executive Order 13045: Protection of Children From Environmental Health and Safety Risks

    This rule also is not subject to Executive Order 13045 “Protection of Children from Environmental Health Risks and Safety Risks” (62 FR 19885, April 23, 1997), because it is not economically significant.

    National Technology Transfer Advancement Act

    In reviewing SIP submissions, EPA's role is to approve State choices, provided that they meet the criteria of the Clean Air Act. In this context, in the absence of a prior existing requirement for the State to use voluntary consensus standards (VCS), EPA has no authority to disapprove a SIP submission for failure to use VCS. It would thus be inconsistent with applicable law for EPA, when it reviews a SIP submission, to use VCS in place of a SIP submission that otherwise satisfies the provisions of the Clean Air Act. Thus, the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply.

    Paperwork Reduction Act

    This rule does not impose an information collection burden under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

    Congressional Review Act

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. Section 804, however, exempts from section 801 the following types of rules: rules of particular applicability; rules relating to agency management or personnel; and rules of agency organization, procedure, or practice that do not substantially affect the rights or obligations of non agency parties. 5 U.S.C. 804(3). EPA is not required to submit a rule report regarding today's action under section 801 because this is a rule of particular applicability.

    Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by January 11, 2005. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this rule for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

    Start List of Subjects Start Printed Page 65381

    List of Subjects in 40 CFR Part 52

    • Environmental protection
    • Air pollution control
    • Incorporation by reference
    • Intergovernmental relations
    • Reporting and recordkeeping requirements
    • Sulfur oxides
    End List of Subjects Start Signature

    Dated: October 20, 2004.

    Bharat Mathur,

    Acting Regional Administrator, Region 5.

    End Signature Start Amendment Part

    Part 52, Chapter I, title 40 of the Code of Federal Regulations is amended as follows:

    End Amendment Part Start Part

    PART 52—[AMENDED]

    End Part Start Amendment Part

    1. The authority citation for part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 7401 et seq.

    End Authority

    Subpart O—Illinois

    Start Amendment Part

    2. Section 52.720 is amended by adding paragraph (c)(171) to read as follows.

    End Amendment Part
    Identification of plan.
    * * * * *

    (c) * * *

    (171) On July 29, 2003, the Illinois Environmental Protection Agency submitted a site-specific revision to the State Implementation Plan (SIP) for sulfur dioxide (SO2) for the Central Illinois Light Company's E. D. Edwards Generating Station in Peoria County, Illinois.

    (i) Incorporation by reference. Illinois Administrative Code Title 35: Environmental Protection, Subtitle B: Air Pollution, Chapter 1: Pollution Control Board Subchapter C: Emissions Standards and Limitations for Stationary Sources, Part 214: Sulfur Limitations, Subpart X: Utilities Section 214.561 E.D. Edwards Electric Generating Station which was amended at 27 Ill. Reg. 12101, effective July 11, 2003.

    * * * * *
    End Supplemental Information

    [FR Doc. 04-24916 Filed 11-10-04; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
1/11/2005
Published:
11/12/2004
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Direct final rule.
Document Number:
04-24916
Dates:
This ``direct final'' rule is effective on January 11, 2005 unless EPA receives adverse written comments by December 13, 2004. If adverse comment is received, EPA will publish a timely withdrawal of the rule in the Federal Register and inform the public that the rule will not take effect.
Pages:
65378-65381 (4 pages)
Docket Numbers:
R05-OAR-2004-IL-0003, FRL-7831-8
Topics:
Air pollution control, Environmental protection, Incorporation by reference, Intergovernmental relations, Reporting and recordkeeping requirements, Sulfur oxides
PDF File:
04-24916.pdf
CFR: (1)
40 CFR 52.720