2010-28477. Public Utility District No. 1 of Chelan County, WA; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble November 5, 2010.

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Application Type: Non-project use of project lands and waters.

    b. Project No. 2145-109.

    c. Date Filed: September 3, 2010.

    d. Applicant: Public Utility District No. 1 of Chelan County, Washington.

    e. Name of Project: Rocky Reach Hydroelectric Project.

    f. Location: The project is located on the Columbia River in the City of Entiat, in Chelan County, Washington.

    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).

    h. Applicant Contact: Michelle Smith, Public Utility District No. 1 of Chelan County, Washington, P.O. Box 1231, Wenatchee, WA 98807. Phone: (509) 663-8121.

    i. FERC Contact: Any questions on this notice should be addressed to Jade Alvey at (202) 502-6864, or email Jade.Alvey@ferc.gov.

    j. Deadline for filing comments, motions to intervene, and protests: December 6, 2010.

    All documents (original and eight copies) should be filed with: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P-2145-109) on any comments or motions filed.

    Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at http://www.ferc.gov under the “e-Filing” link.

    The Commission's Rules of Practice require all interveners filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served Start Printed Page 69427upon each representative of the applicant specified in the particular application.

    k. Description of the Application: The applicant is seeking Commission authorization to allow Beebe Ranch to construct a 40-slip community boat dock, and a community access area on the left bank of the Columbia River. The proposed facilities would be for use by residents of the Beebe Ranch Development. The community boat dock would be located north of the Beebe Bridge, in Douglas County, Washington.

    l. Location of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions To Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Any filings must bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE”, as applicable, and the Project Number of the particular application to which the filing refers.

    p. Agency Comments—Federal, state, and local agencies are invited to file comments on the application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.

    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2010-28477 Filed 11-10-10; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
11/12/2010
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2010-28477
Pages:
69426-69427 (2 pages)
Docket Numbers:
Project No. 2145-109
EOCitation:
of 2010-11-05
PDF File:
2010-28477.pdf