2024-26144. Integrated System Power Rates  

  • Existing Proposed Change
    P-13B P-23 Dollars Percent
    Hydro Peaking Power
    Energy:
    Peaking Energy $0.0094 /kWh $0.0128 /kWh $0.0034 36.2
    Supplemental Peaking Energy $0.0094 /kWh $0.0128 /kWh 0.0034 36.2
    Purchased Power & Wheeling $0.0059 /kWh $0.0087 /kWh 0.0028 47.5
    Administrator's Discretionary Adder Adjustment—Annual Limit +/−$0.0059 /kWh +/−$0.0087 /kWh 0.0028 47.5
    Capacity:
    Grid or 138-161 kV $4.50 /kW/Mo $5.30 /kW/Mo 0.80 17.8
    Regulation & Frequency Response $0.07 /kW/Mo $0.0208 /kW/Mo (0.0492) −70.3
    Operational Reserves—Spinning $0.0146 /kW/Mo $0.0208 /kW/Mo 0.0062 42.5
    Operational Reserves—Supplemental $0.0146 /kW/Mo $0.0208 /kW/Mo 0.0062 42.5
    Energy Imbalance $0.0 /kW/Mo $0.0 /kW/Mo 0.0 0.0
    Regulation Purchased Adder (load within SWPA BAA) prorated share of total energy cost prorated share of total energy cost N/A N/A
    Transformation Service 69 kV & less (applied to usage, not reservation) $0.46 /kW/Mo $0.86 /kW/Mo 0.4000 87.0
    Non-Federal Transmission & Interconnection Facilities Service
    NFTS-13A NFS-23 Dollars Percent
    Firm Point-to-Point Capacity $1.48 /kW/Mo $1.15 /kW/Mo ($0.33) −22.3
    Non-Firm Point-to-Point Capacity (80 percent of Firm Point-to-Point) $1.184 /kW/Mo $0.92 /kW/Mo (0.26) −22.3
    Network Integration $1.48 /kW/Mo $1.15 /kW/Mo (0.33) −22.3
    Interconnection Facilities $1.48 /kW/Mo $1.15 /kW/Mo (0.33) −22.3
    Transformation Service 69 kV & less (applied to usage, not reservation) $0.46 /kW/Mo $0.86 /kW/Mo 0.40 87.0
    Scheduling, System Control, & Dispatch $0.09 /kW/Mo $0.17 /kW/Mo 0.08 88.9
    Reactive Supply & Voltage Control $0.04 /kW/Mo $0.10 /kW/Mo 0.06 150.0
    Regulation & Frequency Response $0.07 /kW/Mo $0.0208 /kW/Mo (0.0492) −70.3
    Operational Reserves—Spinning $0.0146 /kW/Mo $0.0208 /kW/Mo 0.0062 42.5
    Operational Reserves—Supplemental $0.0146 /kW/Mo $0.0208 /kW/Mo 0.0062 42.5
    Energy Imbalance $0.0 /kW/Mo $0.0 /kW/Mo 0.0 0.0
    Regulation Purchased Adder (load within SWPA BAA) prorated share of total energy cost prorated share of total energy cost N/A N/A
    Excess Energy
    EE-13 EE-23 Dollars Percent
    Excess Energy $0.0094 /kWh formula rate N/A N/A