    Washington Natural Gas Co., as Project Operator; Notice of 
    Petition to Amend
    
    November 7, 1995.
        Take notice that on October 20, 1995, Washington Natural Gas 
    Company, as Project Operator of the Jackson Prairie Storage Project 
    (Applicant), 815 Mercer Street, Seattle, Washington 98109, filed in 
    Docket No. CP94-550-001 a petition pursuant to Section 7(c) of the 
    Natural Gas Act (NGA) to amend the certificate issued November 16, 1994 
    in this proceeding all as more fully set forth in the application which 
    is on file with the Commission and open to public inspection.
        Applicant states that the certificate issued November 16, 1994 
    authorized Applicant to add 3 Bcf of cushion gas and to increase the 
    shut-in bottom hole reservoir pressure to 1225 psia in Zone 9 at the 
    Jackson Prairie Storage Project (Storage Project) located in Lewis 
    County, Washington. Further, Applicant states that it expects to reach 
    the maximum certificated shut-in bottom hole reservoir pressure in mid-
    November. Therefore Applicant is requesting authority to increase the 
    maximum allowable shut-in bottom hole reservoir pressure to 1325 psia 
    in order to complete the testing of Zone 9 of the Storage Project.
        Any person desiring to make any protest with reference to said 
    application should on or before November 28, 1995, file with the 
    Federal Energy Regulatory Commission, Washington, D.C. 20426, a motion 
    to intervene or a protest in accordance with the requirements of the 
    Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
    385.211) and the Regulations under the NGA (19 CFR 157.10). All 
    protests filed with the Commission will be considered by it in 
    determining the appropriate action to be taken but will not serve to 
    make the protestants parties to the proceeding. Any person wishing to 
    become a party to a proceeding or to participate as a party in the 
    hearing therein must file a motion to intervene in accordance with the 
    Commission's rules.
        Take further notice that, pursuant to authority contained in and 
    subject to the jurisdiction conferred upon the Federal 
    
    [[Page 57237]]
    Energy Regulatory Commission by Sections 7 and 15 of the NGA and the 
    Commission's rules of Practice and Procedure, a hearing will be held 
    without further notice before the Commission or its designee on the 
    application if a motion to intervene is not filed within the time 
    required herein. If a motion to intervene is timely filed, or if the 
    Commission on its own motion believes that a formal hearing is 
    required, further notice of such hearing will be duly given.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-28005 Filed 11-13-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
11/14/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-28005
Pages:
57236-57237 (2 pages)
Docket Numbers:
Docket No. CP94-550-001
PDF File:
95-28005.pdf