[Federal Register Volume 60, Number 219 (Tuesday, November 14, 1995)]
[Notices]
[Pages 57252-57253]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-28026]
-----------------------------------------------------------------------
[[Page 57253]]
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 70-7001; 70-7002]
United States Enrichment Corporation: Notice of Receipt of
Compliance Plan for the Certification of the Paducah Gaseous Diffusion
Plant and the Portsmouth Gaseous Diffusion Plant, Notice of Comment
Period, and Notice of Public Meetings
I. Receipt of Compliance Plan and Availability of Documents
Notice is hereby given that the U. S. Nuclear Regulatory Commission
(NRC or the Commission) has received by letter dated November 6, 1995,
a compliance plan from the U. S. Enrichment Corporation (USEC) to
address those areas at the gaseous diffusion plants (GDPs) located near
Paducah, Kentucky and Piketon, Ohio, that are not yet in compliance
with the NRC requirements in 10 CFR Part 76, ``Certification of Gaseous
Diffusion Plants.'' The Energy Policy Act of 1992, which established
the USEC to operate the GDPs under lease from the U. S. Department of
Energy, requires this compliance plan, prepared by the Department of
Energy (DOE). NRC received USEC's application for certification of the
GDPs on September 15, 1995, and notice of its receipt was published on
September 21, 1995, (60 FR 49026). The previous notice also announced
the public comment period on the USEC application, and the public
meeting dates scheduled for each plant. Copies of the compliance plan,
the application for certification (except for classified and
proprietary portions withheld in accordance with 10 CFR 2.790,
``Availability of Public Records''), and related correspondence, are
available for public inspection and copying at the Commission's Public
Document Room (PDR) in the Gelman Building, 2120 L Street, N.W.,
Washington, D.C. 20555 and in the Local Public Document Rooms (LPDRs)
established for these facilities. A copy of the compliance plan and
application for the Paducah plant is available at the Paducah Public
Library, 555 Washington Street, Paducah, Kentucky 42003. A copy of the
compliance plan and application for the Portsmouth plant is available
at the Portsmouth Public Library, 1220 Gallia Street, Portsmouth, Ohio
45662.
II. Notice of Comment Period
Any interested party may submit written comments on the compliance
plan for either the Paducah plant or the Portsmouth plant for
consideration by the NRC staff. To be certain of consideration,
comments must be received by December 29, 1995 for the compliance plan.
Comments received after the due date will be considered if it is
practical to do so, but the Commission is able to assure consideration
only for comments received on or before this date. Written comments on
the application should be mailed to the Chief, Rules Review and
Directives Branch, Office of Administration, U. S. Nuclear Regulatory
Commission, Washington, D.C. 20555 or hand delivered to 11545 Rockville
Pike, Rockville, MD 20852 between 7:45 am and 4:15 pm Federal workdays.
Comments should be legible and reproducible, and include the name,
affiliation (if any), and address of the commenter. All comments
received by the Commission will be made available for public inspection
at the Commission's Public Document Room located in Washington, D.C.
and the Local Public Document Rooms located in Paducah, Kentucky and
Portsmouth, Ohio. In accordance with 10 CFR 76.62 and 76.64, a member
of the public must submit written comments or provide oral comments at
a public meeting described below to petition the Commission requesting
review of the Director's decision on certification.
III. Notice of Public Meetings
As previously announced on September 21, 1995, public meetings are
being held to solicit public input on the initial certification of
these facilities. The meeting for the Paducah Gaseous Diffusion Plant
will be held at the Paducah Information Age Park Resource Center, 200
McCracken Boulevard in Paducah, Kentucky on December 5, 1995, 7 pm. The
meeting on the Portsmouth Gaseous Diffusion Plant will be held at the
Vern Riffe Joint Vocational School, 23365 State Rt. 124 in Piketon,
Ohio on November 28, 1995, 7 pm.
In order to allow a maximum number of speakers, statements by the
public will be limited to 5 minutes per individual. Those interested in
speaking at the meetings may register at the meeting and will be taken
in the order of sign-up. A record of the public meeting will be placed
in the PDR and the LPDRs established for the GDPs. Written comments
will also be accepted at the meetings.
FOR FURTHER INFORMATION CONTACT: Ms. Rocio Castaneira, (301) 415-8103;
Mr. Carl B. Sawyer, (301) 415-8174; or Ms. Merri Horn, (301) 415-8126;
Office of Nuclear Material Safety and Safeguards, U. S. Nuclear
Regulatory Commission, Washington, D.C. 20555.
Dated at Rockville, Maryland, this 7th day of November 1995.
For the Nuclear Regulatory Commission.
John W. N. Hickey,
Chief, Enrichment Branch, Division of Fuel Cycle Safety and Safeguards.
[FR Doc. 95-28026 Filed 11-13-95; 8:45 am]
BILLING CODE 7590-01-P