98-30516. Texas Gas Transmission Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 220 (Monday, November 16, 1998)]
    [Notices]
    [Page 63720]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-30516]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-35-000]
    
    
    Texas Gas Transmission Corporation; Notice of Request Under 
    Blanket Authorization
    
    November 9, 1998.
        Take notice that on October 26, 1998, as supplemented October 29, 
    1998, Texas Gas Transmission Corporation (Texas Gas), P.O. Box 20008, 
    Owensboro, Kentucky 42304, filed in Docket No. CP99-35-000, a request 
    pursuant to Section 157.205 and 157.216(b) of the Commission's 
    Regulations under the Natural Gas Act (18 CFR Sections 157.205 and 
    157.216), for authorization to abandon by removal the Germany Oil-
    Church Point Receipt Meter located on Texas Gas's Church Point 4-Inch 
    Line in Acadia Parish, Louisiana, under Texas Gas's blanket certificate 
    issued in Docket No. CP82-407-000, all as more fully set forth in the 
    request on file with the Commission and open to public.
        It is stated that this meter station was constructed in 1988 to 
    receive gas from Germany Oil Company for transportation for various 
    shippers and reported in Texas Gas's 1988 annual Report of Blanket 
    Certificate Activities under Texas Gas's blanket certificate issued in 
    Docket No. CP82-407-000.
        It is further stated that the facilities to be removed consist of a 
    2-inch skid-mounted meter and related facilities. Texas Gas states that 
    it estimates the cost of removal would be $500.
        Texas Gas states that it is requesting authorization to abandon 
    this meter station as the producer has plugged and abandoned the site, 
    and the landowner has requested return of the land.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-30516 Filed 11-13-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/16/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-30516
Pages:
63720-63720 (1 pages)
Docket Numbers:
Docket No. CP99-35-000
PDF File:
98-30516.pdf