98-30520. Florida Gas Transmission Co.; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 220 (Monday, November 16, 1998)]
    [Notices]
    [Page 63717]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-30520]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-52-000]
    
    
    Florida Gas Transmission Co.; Notice of Request Under Blanket 
    Authorization
    
    November 9, 1998.
        Take notice that on November 3, 1998, Florida Gas Transmission 
    Company (FGT), 1400 Smith Street, Houston, Texas 77002, filed in Docket 
    No. CP99-52-000 a request pursuant to Sec. 157.205 of the Commission's 
    regulations under the Natural Gas Act (18 CFR 157.205) for 
    authorization to construct and operate a new delivery point in East 
    Baton Rouge Parish, Louisiana for the City of Zachary (Zachary), under 
    FGT's blanket certificate issued in Docket No. CP82-553-000 pursuant to 
    section 7 of the Natural Gas Act, all as more fully set forth in the 
    request which is on file with the Commission and open to public 
    inspection.
        FGT states that the proposed delivery point would be constructed 
    adjacent to FGT's 24-inch and 30-inch Mainline and would include two 3-
    inch hot taps, less than 50 feet of 3-inch line, electric flow 
    measurement equipment, and any related appurtenant facilities necessary 
    for FGT to deliver up to 1500 MMBtu per day to Zachary.
        FGT states further that the estimated cost of the facilities would 
    be approximately $41,775, which would be fully reimbursed by Zachary.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Sec. 157.205 of the 
    regulations under the Natural Gas Act (18 CFR 157.205) a protest to the 
    request. If no protest is filed within the time allowed therefor, the 
    proposed activity shall be deemed to be authorized effective the day 
    after the time allowed for filing a protest. If a protest is filed and 
    not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to section 7 of the Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-30520 Filed 11-13-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/16/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-30520
Pages:
63717-63717 (1 pages)
Docket Numbers:
Docket No. CP99-52-000
PDF File:
98-30520.pdf