98-30575. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 63, Number 220 (Monday, November 16, 1998)]
    [Notices]
    [Page 63729]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-30575]
    
    
    
    [[Page 63729]]
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-5496-9]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared October 26, 1998 Through 
    October 30, 1998 pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 564-7167. An explanation of the ratings assigned to draft 
    environmental impact statements (EISs) was published in FR dated April 
    10, 1998 (62 FR 17856).
    
    Draft EISs
    
        ERP No. D-AFS-L65307-WA Rating *LO, Sand Ecosystem Restoration 
    Project, Implementation, Leavenworth Range District, Wenatchee National 
    Forest, Chelan County, WA.
    SUMMARY: EPA used a screening tool to conduct a limited review of the 
    action. Based upon the screen, EPA does not foresee having any 
    environmetal objections to the proposed project. Therefore, EPA will 
    not be conducting a detailed review.
        ERP No. D-BLM-K67048-AZ Rating EO2, Yarnell Gold Mining Project, 
    Construction and Operation an Open-pit Gold Mine and Ore Processing 
    Facility, Yavapai County, AZ.
    
    SUMMARY: EPA expressed environmental objections due to potential 
    significant adverse impacts to air quality, noise, and the stability of 
    the proposed North Waste Rock Dump (NWRD). PM10 emissions from the 
    project would result in concentrations far exceeding the maximum 
    allowable increase over the baseline concentration (increment) for 
    PM10. EPA recommended control measures and monitoring at the mine. EPA 
    also recommended that the NWRD be eliminated from the project and that 
    the BLM select Alternative 3 as the preferred alternative. EPA 
    recommended that additional information be provided in the FEIS 
    regarding geochemistry; waste rock sampling and handling; monitoring; 
    reclamation bonding; socioeconomic impacts; and mitigation for impacts 
    to air and water quality and nosie and blasting impacts.
        ERP No. DS-AFS-L67004-ID Rating EO2, Thompson Creek Mine (TCM), 
    Updated Information, Prevent and/or Control Potential Acid-Rock 
    Drainage, Plan of Operations Approval, Custer County, ID.
        SUMMARY: EPA expressed environmental objections based on the narrow 
    scope of the alternatives analysis and precicted adverse water quality 
    effects. EPA requested additional information regarding embankment 
    stability and uncertainties associated with the modeling predictions.
        ERP No. DS-BLM-J03011-00 Rating LO, TransColorado Gas Pipeline 
    Transmission Project, Updated Resource Information, Construction, 
    Operation and Maintenance, COE Section 404 and 10 Permits, Right-of-Way 
    Grants and Special Use Permit, La Plata, Delta, Dolores, Garfield, 
    Mesa, Montezuma, Montrose, Rio Blanco, San Miguel Counties, CO and San 
    Juan County, NM.
        SUMMARY: EPA expressed lack of environemental objections.
        ERP No. D2-BLM-J65212-WY Rating EC2, Newcastle Resource Management 
    Plan, Implementation, Updated Information, Evaluates Alternatives for 
    the Use of Public/Federal Lands and Resources in Portions of Wyoming, 
    Crook, Niobrara and Weston Counties, WY.
        SUMMARY: EPA expressed environmental concerns about potential 
    impacts to air quality, water quality and habitat. EPA suggested the 
    Final EIS include analysis of the environmental impacts for all 
    alternatives.
    
    Final EISs
    
        ERP No. F-DOI-K40222-TT. Palau Compact Road Construction, 
    Implementation, Funding, Republic of Palau, Babeldaob Island, Trust 
    Territory of the Pacific Islands.
        SUMMARY: EPA continued to express environmental concerns regarding 
    the potential direct and long term impacts of the Palau Compact Road. 
    EPA supported the position of the US Department of the Interior's, that 
    road construction should not begin until long term protection of 
    environmental mitigation sites has been approved by the Republic of 
    Palau.
    
        Dated: November 10, 1998.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 98-30575 Filed 11-13-98; 8:45 am]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
11/16/1998
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
98-30575
Pages:
63729-63729 (1 pages)
Docket Numbers:
ER-FRL-5496-9
PDF File:
98-30575.pdf