2018-25045. Environmental Impact Statements; Notice of Availability  

  • Start Preamble

    Responsible Agency: Office of Federal Activities, General Information (202) 564-5632 or https://www.epa.gov/​nepa/​.

    Weekly receipt of Environmental Impact Statements

    Filed 11/05/2018 Through 11/09/2018

    Pursuant to 40 CFR 1506.9.

    Notice

    Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA's comment letters on EISs are available at: https://cdxnodengn.epa.gov/​cdx-enepa-public/​action/​eis/​search.

    EIS No. 20180267, Final, USFS, CO, Golden Peak Improvements 2016, Review Period Ends: 12/26/2018, Contact: Max Forgensi 970-309-4861

    EIS No. 20180268, Draft Supplement, FHWA, NH, Derry-Londonderry I-93 Exit 4A, Comment Period Ends: 01/04/2019, Contact: Jamison S. Sikora 603-410-4870

    EIS No. 20180269, Draft, FHWA, NV, Interstate 80/Interstate 580/US Highway 395 Freeway-to-Freeway Interchange and Connecting Road Improvements, Comment Period Ends: 01/15/2019, Contact: Abdelmoez Abdalla 775-687-1231

    EIS No. 20180270, Final, NSF, NM, Sacramento Peak Observatory, Review Period Ends: 12/17/2018, Contact: Elizabeth Pentecost 703-292-4907

    EIS No. 20180271, Final, APHIS, PRO, Fruit Fly Cooperative Control Program, Review Period Ends: 12/17/2018, Contact: Jim E. Warren 212-316-3216

    EIS No. 20180272, Draft, USN, NV, Fallon Range Training Complex Modernization, Comment Period Ends: 01/15/2019, Contact: Sara Goodwin 619-532-4463

    EIS No. 20180273, Final, NRC, LA, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 58, Regarding River Bend Station, Unit 1, Final Report, Review Period Ends: 12/17/2018, Contact: David Drucker 301-415-6223

    EIS No. 20180274, Final, NMFS, AK, Final Environmental Impact Statement for Issuing Annual Catch Limits To the Alaska Eskimo Whaling Commission for A Subsistence Hunt On Bowhead Whales for The Years 2019 And Beyond, Review Period Ends: 12/17/2018, Contact: John Henderschedt, ATTN: Carolyn Doherty 301-427-8385

    EIS No. 20180275, Final, USACE, VA, Final Integrated City of Norfolk Coastal Storm Risk Management Feasibility Study, Review Period Ends: 12/17/2018, Contact: Katherine Perdue 757-201-7218

    Amended Notices

    EIS No. 20180235, Draft, USACE, VA, Draft Integrated City of Norfolk Coastal Storm Risk Management Feasibility Study, Contact: Katherine Perdue 757-201-7218

    Revision to FR Notice Published 10/12/2018; Retracted due to erroneous filing.

    Start Signature

    Dated: November 13, 2018.

    Robert Tomiak,

    Director, Office of Federal Activities.

    End Signature End Preamble

    [FR Doc. 2018-25045 Filed 11-15-18; 8:45 am]

    BILLING CODE 6560-50-P