99-29945. Notice of Application Accepted for Filing and Request for Motions to Intervene and Protests  

  • [Federal Register Volume 64, Number 221 (Wednesday, November 17, 1999)]
    [Notices]
    [Pages 62667-62668]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-29945]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Application Accepted for Filing and Request for Motions 
    to Intervene and Protests
    
    November 10, 1999.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: Preliminary Permit.
        b. Project No.: P-11825-000.
        c. Date filed: September 27, 1999.
        d. Applicant: Universal Electric Power Corporation.
        e. Name of Project: Newt Graham L&D Hydroelectric Project.
        f. Location: On the Verdigris River, near the town of Inola, 
    Wagoner County, Oklahoma, utilizing federal lands administered by the 
    U.S. Army Corps of Engineers.
        g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: Mr. Gregory S. Feltenberger, Universal 
    Electric Power Corp., 1145 Highbrook Street, Akron, Ohio 44301, (330) 
    535-7115.
        i. FERC Contact: Susan Tseng (202) 219-2798 or E-mail address at 
    susan.tseng@ferc.fed.us.
        j. Comment Date: 60 days from the issuance date of this notice.
        All documents (original and eight copies) should be filed with: 
    David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
    First Street, NE., Washington, DC 20426.
        The Commission's Rules of Practice and Procedure require all 
    intervenors filing documents with the Commission to serve a copy of 
    that document on each person whose name appears on the official list 
    for the project. Further, if an intervenor files comments or documents 
    with the Commission relating to the merits of an issue that may affect 
    the responsibilities of a particular resource agency, they must also 
    serve a copy of the document on that resource agency.
        k. Description of Project: The proposed project would utilize the 
    existing U.S. Army Corps of Engineers' Newt Graham L&D, and would 
    consist of: (1) 2 new 80-foot-long, 48-inch-diameter  steel  penstocks;  
     (2) a new 60-foot-long, 30-foot-wide, 30-foot-high powerhouse 
    downstream of the dam containing 2 generating units having a total 
    installed capacity of 900 kilowatts; (3) a new exhaust apron; (4) a new 
    0.19-mile-long, 14.7-kV transmission line; and (5) appurtenant 
    facilities.
        The proposed average annual generation is estimated to be 5 
    gigawatt hours. The cost of the studies under the permit will not 
    exceed $500,000. Project energy would be sold to utility companies, 
    corporations, municipalities, aggregators, or similar entities.
        l. Locations of the application. A copy of the application is 
    available for inspection and reproduction at the Commission's Public 
    Reference Room, located at 888 First Street, NE, Room 2A, Washington, 
    DC 20426, or by calling (202) 208-2371. The application may be
    
    [[Page 62668]]
    
    viewed on http://www.fed.rs/rims.htm (call (202) 208-2222 for 
    assistance). A copy is also available for inspection and reproduction 
    at the address in item h above.
        Preliminary Permit--Anyone desiring to file a competing application 
    for preliminary permit for a proposed project must submit the competing 
    application itself, or a notice of intent to file such an application, 
    to the Commission on or before the specified comment date for the 
    particular application (see 18 CFR 4.36). Submission of a timely notice 
    of intent allows an interested person to file the competing preliminary 
    permit application no later than 30 days after the specified comment 
    date for the particular application. A competing preliminary permit 
    application must conform with 18 CFR 4.30(b) and 4.36.
        Preliminary Permit--Any qualified development applicant desiring to 
    file a competing development application must submit to the Commission, 
    on or before a specified comment date for the particular application, 
    either a competing development application or a notice of intent to 
    file such an application. Submission of a timely notice of intent to 
    file a development application allows an interested person to file the 
    competing application no later than 120 days after the specified 
    comment date for the particular application. A competing license 
    application must conform with 18 CFR 4.30(b) and 4.36.
        Notice of intent--A notice of intent must specify the exact name, 
    business address, and telephone number of the prospective applicant, 
    and must include an unequivocal statement of intent to submit, if such 
    an application may be filed, either a preliminary permit application or 
    a development application (specify which type of application). A notice 
    of intent must be served on the applicant(s) named in this public 
    notice.
        Proposed Scope of Studies under Permit--A preliminary permit, if 
    issued, does not authorize construction. The term of the proposed 
    preliminary permit would be 36 months. The work proposed under the 
    preliminary permit would include economic analysis, preparation of 
    preliminary engineering plans, and a study of environmental impacts. 
    Based on the results of these studies, the Applicant would decide 
    whether to proceed with the preparation of a development application to 
    construct and operate the project.
        Comments, Protests, or Motions to Intervene--Anyone may submit 
    comments, a protest, or a motion to intervene in accordance with the 
    requirements of Rules of Practice and Procedure, 18 CFR 385.210, 
    385.211, 385.214. In determining the appropriate action to take, the 
    Commission will consider all protests or other comments filed, but only 
    those who file a motion to intervene in accordance with the 
    Commission's Rules may become a party to the proceeding. Any comments, 
    protests, or motions to intervene must be received on or before the 
    specified comment date for the particular application.
        Filing and Service of Responsive Documents--Any filings must bear 
    in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT TO 
    FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'', ``PROTEST'', 
    ``MOTION TO INTERVENE'', as applicable, and the Project Number of the 
    particular application to which the filing refers. Any of the above-
    named documents must be filed by providing the original and the number 
    of copies provided by the Commission's regulations to: The Secretary, 
    Federal Energy Regulatory Commission, 888 First Street, NE., 
    Washington, D.C. 20426. An additional copy must be sent to Director, 
    Division of Project Review, Federal Energy Regulatory Commission, at 
    the above-mentioned address. A copy of any notice of intent, competing 
    application or motion to intervene must also be served upon each 
    representative of the Applicant specified in the particular 
    application.
        Agency Comments--Federal, state, and local agencies are invited to 
    file comments on the described application. A copy of the application 
    may be obtained by agencies directly from the Applicant. If an agency 
    does not file comments within the time specified for filing comments, 
    it will be presumed to have no comments. One copy of any agency's 
    comments must also be sent to the Applicant's representatives.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 99-29945 Filed 11-16-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/17/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-29945
Dates:
60 days from the issuance date of this notice.
Pages:
62667-62668 (2 pages)