-
Start Preamble
November 7, 2003.
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2114-116.
c. Date Filed: October 29, 2003.
d. Applicant: Public Utility District No. 2 of Grant County, WA.
e. Name of Project: Priest Rapids Hydroelectric Project.
f. Location: On the Columbia River in portions of Grant, Yakima, Kittitas, Douglas, Benton, and Chelan counties, Washington. The project occupies federal lands managed by the U.S. Bureau of Land Management, U.S. Bureau of Reclamation, U.S. Department of Energy, U.S. Department of the Army, and U.S. Fish and Wildlife Service.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Laurel Heacock, Licensing Manager, Public Utility District No. 2 of Grant County, 30 C Street S.W., Ephrata, Washington 98823, telephone (509) 754-6622.
i. FERC Contact: Charles Hall, telephone (202) 502-6853, e-mail Charles.Hall@ferc.gov.
j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
Motions to intervene and protests may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (http://www.ferc.gov) under the “e-Filing” link.
k. This application has been accepted, but is not ready for environmental analysis at this time.
l. The project includes two developments with a total authorized capacity of 1,755 megawatts (MW) as follows:
(a) The Wanapum development consisting of a dam 186.5 feet high and 8,637 feet long with upstream fish passage facilities, a reservoir with an approximate surface area of 14,680 acres, a powerhouse with ten turbine-generator units with a total nameplate capacity of 900 MW, transmission lines, and appurtenant facilities.
(b) The Priest Rapids development consisting of a dam 179.5 feet high and 10,103 feet long with upstream fish passage facilities, a reservoir with an approximate surface area of 7,725 acres, a powerhouse with ten turbine-generator units with a total nameplate capacity of 855 MW, transmission lines, and appurtenant facilities.
m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is also available for inspection and reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application.
All filings must (1) bear in all capital letters the title “PROTEST” or “MOTION TO INTERVENE;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.
Start SignatureMagalie R. Salas,
Secretary.
[FR Doc. E3-00245 Filed 11-14-03; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 11/17/2003
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- E3-00245
- Pages:
- 64888-64888 (1 pages)
- EOCitation:
- of 2003-11-07
- PDF File:
- e3-00245.pdf