2014-27247. Alabama Power; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
-
Start Preamble
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:
a. Application Type: Non-project Use of Project Lands.
b. Project No: 349-183.
c. Date Filed: September 30, 2014.
d. Applicant: Alabama Power Company.
e. Name of Project: Martin Dam Project.
f. Location: Tallapoosa River in Elmore, Coosa, and Tallapoosa counties, Alabama.
g. Filed Pursuant to: Federal Power Act, 16 USC 791a—825r.
h. Applicant Contact: Matthew Akin, Alabama Power Company, 600 18th Street North, Birmingham, Alabama 35203; Telephone: (205) 257-1314.
i. FERC Contact: Shana High at (202) 502-8674, or email: shana.high@ferc.gov.
j. Deadline for filing comments, motions to intervene, and protests: 30 days from issue.
All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, (202) 502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P-349-183) on any comments, motions, or recommendations filed.
The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. Description of Request: Alabama Power Company proposes to authorize Billy Ray Smith to replace two existing piers and add to a third existing pier at Smith's Marina, formerly Veazey's Marina, located at 1590 Pine Point Road, Alexander City, Alabama 35010. As proposed, the three piers would accommodate 22 watercraft. The proposal would allow Smith's Marina to operate in both high and low water conditions, making the marina viable year-round, and would make the marina more accessible to the public from the water. Two of the piers would have second level party/sun decks. Existing gas pumps at the third pier would remain.
l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field (P-349) to access the document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to Start Printed Page 68675intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010.
Start SignatureDated: November 4, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-27247 Filed 11-17-14; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 11/18/2014
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2014-27247
- Pages:
- 68674-68675 (2 pages)
- Docket Numbers:
- Company Project No. 349-183
- PDF File:
- 2014-27247.pdf