2016-27688. Federal Acquisition Regulation; Technical Amendments  

  • Start Preamble

    AGENCY:

    Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).

    ACTION:

    Final rule.

    SUMMARY:

    This document makes amendments to the Federal Acquisition Regulation (FAR) in order to make editorial changes.

    DATES:

    Effective: November 18, 2016.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ms. Hada Flowers, Regulatory Secretariat Division (MVCB), 1800 F Street NW., 2nd Floor, Washington, DC 20405, 202-501-4755. Please cite FAC 2005-92, Technical Amendments.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    In order to update certain elements in 48 CFR parts 2, 7, 19, 34, 42, and 52 this document makes editorial changes to the FAR.

    Start List of Subjects

    List of Subjects in 48 CFR Parts 2, 7, 19, 34, 42, and 52

    • Government procurement
    End List of Subjects Start Signature

    Dated: November 10, 2016.

    William F. Clark,

    Director, Office of Government-wide Acquisition Policy, Office of Acquisition Policy, Office of Government-wide Policy.

    End Signature

    Therefore, DoD, GSA, and NASA amend 48 CFR parts 2, 7, 19, 34, 42, and 52 as set forth below:

    Start Amendment Part

    1. The authority citation for 48 CFR parts 2, 7, and 19 continues to read as follow:

    End Amendment Part Start Authority

    Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 51 U.S.C. 20113.

    End Authority Start Part

    PART 2—DEFINITIONS OF WORDS AND TERMS

    End Part Start Amendment Part

    2. Amend section 2.101, in paragraph (b)(2) by revising the definition “Earned value management system” to read as follows:

    End Amendment Part
    Definitions.
    * * * * *

    (b) * * *

    (2) * * *

    Earned value management system means a project management tool that effectively integrates the project scope of work with cost, schedule and performance elements for optimum project planning and control. The qualities and operating characteristics of an earned value management system are described in Electronic Industries Alliance Standard 748 (EIA-748), Earned Value Management Systems. (See OMB Circular A-11, Part 7.)

    * * * * *
    Start Part

    PART 7—ACQUISITION PLANNING

    [Amended]
    End Part Start Amendment Part

    3. Amend section 7.105 by removing from paragraph (b)(11) “American National Standards Institute/Electronics Industries Alliance (ANSI/EIA) Standard-748, Earned Value Management Systems” and adding “Electronic Industries Alliance Standard 748 (EIA-748)” in its place.

    End Amendment Part Start Part

    PART 19—SMALL BUSINESS PROGRAMS

    End Part Start Amendment Part

    4. Revise section 19.1506 to read as follows:

    End Amendment Part
    Women-Owned Small Business Program sole source awards.

    (a) A contracting officer shall consider a contract award to an EDWOSB concern on a sole source basis (see 6.302-5(b)(7)) before considering small business set-asides (see 19.203 and subpart 19.5) provided none of the exclusions at 19.1504 apply and—

    (1) The acquisition is assigned a NAICS code in which SBA has determined that WOSB concerns are underrepresented in Federal procurement;

    (2) The contracting officer does not have a reasonable expectation that offers would be received from two or more EDWOSB concerns; and

    (3) The conditions in paragraph (c) of this section exist.

    (b) A contracting officer shall consider a contract award to a WOSB concern (including EDWOSB concerns) eligible under the WOSB Program on a sole source basis (see 6.302-5(b)(7)) before considering small business set-asides (see 19.203 and subpart 19.5) provided none of the exclusions at 19.1504 apply and—

    (1) The acquisition is assigned a NAICS code in which SBA has determined that WOSB concerns are substantially underrepresented in Federal procurement;

    (2) The contracting officer does not have a reasonable expectation that offers would be received from two or more WOSB concerns (including EDWOSB concerns); and

    (3) The conditions in paragraph (c) of this section exist.

    (c)(1) The anticipated award price of the contract, including options, will not exceed—

    (i) $6.5 million for a requirement within the NAICS codes for manufacturing; or

    (ii) $4 million for a requirement within any other NAICS codes.

    (2) The EDWOSB concern or WOSB concern has been determined to be a responsible contractor with respect to performance.

    (3) The award can be made at a fair and reasonable price.

    (d) The SBA has the right to appeal the contracting officer's decision not to make a sole source award to either an EDWOSB concern or WOSB concern eligible under the WOSB program.

    Start Part

    PART 34—MAJOR SYSTEM ACQUISITION

    End Part Start Amendment Part

    5. The authority citation for 48 CFR part 34 is revised to read as follows:

    End Amendment Part Start Authority

    Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 51 U.S.C. 20113.

    End Authority

    Subpart 34.0 [Amended]

    Start Amendment Part

    6. Remove the heading of subpart 34.0.

    End Amendment Part
    [Amended]
    Start Amendment Part

    7. Amend section 34.005-2 by removing from paragraph (b)(6) “ANSI/EIA Standard—748” and adding “Electronic Industries Alliance Standard 748 (EIA-748)” in its place.

    End Amendment Part
    [Amended]
    Start Amendment Part

    8. Amend section 34.201 by removing from paragraph (b) “American National Standards Institute/Electronics Industries Alliance (ANSI/EIA) Standard—748, Earned Value Management Systems” and adding “Electronic Industries Alliance Standard 748 (EIA-748)” in its place.

    End Amendment Part
    [Amended]
    Start Amendment Part

    9. Amend section 34.203 by—

    End Amendment Part Start Amendment Part

    a. Removing from paragraph (a) “Notice of Earned Value Management System—Pre-Award IBR” and adding “Notice of Earned Value Management System—Preaward Integrated Baseline Review” in its place; and

    End Amendment Part Start Amendment Part

    b. Removing from paragraph (b) “Notice of Earned Value Management System—Post-Award IBR” and adding “Notice of Earned Value Management System—Postaward Integrated Baseline Review” in its place.

    End Amendment Part Start Part Start Printed Page 83104

    PART 42—CONTRACT ADMINISTRATION AND AUDIT SERVICES

    End Part Start Amendment Part

    10. The authority citation for 48 CFR part 42 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 51 U.S.C. 20113.

    End Authority
    [Redesignated as Section 42.709-0]
    Start Amendment Part

    11. Section 42.709 is redesignated as section 42.709-0, and a new section 42.709 is added to read as follows:

    End Amendment Part
    Penalties for Unallowable Costs.
    * * * * *
    Start Part

    PART 52—SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    End Part Start Amendment Part

    12. The authority citation for 48 CFR part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 51 U.S.C. 20113.

    End Authority Start Amendment Part

    13. Amend section 52.234-2 by—

    End Amendment Part Start Amendment Part

    a. Revising the section and provision headings;

    End Amendment Part Start Amendment Part

    b. Removing from paragraph (a) “ANSI/EIA Standard—748” and adding “Electronic Industries Alliance Standard 748 (EIA-748)” in its place; and

    End Amendment Part Start Amendment Part

    c. Removing from paragraph (b)(4) “ANSI/EIA Standard—748” and adding “EIA-748” in its place.

    End Amendment Part

    The revisions read as follows:

    Notice of Earned Value Management System—Preaward Integrated Baseline Review.
    * * * * *

    Notice of Earned Value Management System—Preaward Integrated Baseline Review NOV 2016

    * * * * *
    Start Amendment Part

    14. Amend section 52.234-3 by—

    End Amendment Part Start Amendment Part

    a. Revising the section and provision headings;

    End Amendment Part Start Amendment Part

    b. Removing from paragraph (a) “ANSI/EIA Standard—748” and adding “Electronic Industries Alliance Standard 748 (EIA-748)” in its place; and

    End Amendment Part Start Amendment Part

    c. Removing from paragraph (b)(4) “ANSI/EIA Standard—748” and adding “EIA-748” in its place.

    End Amendment Part

    The revisions read as follows:

    Notice of Earned Value Management System—Postaward Integrated Baseline Review.
    * * * * *

    Notice of Earned Value Management System—Postaward Integrated Baseline Review NOV 2016

    * * * * *
    Start Amendment Part

    15. Amend section 52.234-4 by—

    End Amendment Part Start Amendment Part

    a. Revising the date of the clause;

    End Amendment Part Start Amendment Part

    b. Removing from paragraph (a) “ANSI/EIA Standard—748” and adding “Electronic Industries Alliance Standard 748 (EIA-748)” in its place; and

    End Amendment Part Start Amendment Part

    c. Removing from paragraph (b) introductory text “ANSI/EIA Standard—748” and adding “EIA-748” in its place.

    End Amendment Part

    The revision reads as follows:

    Earned Value Management System.
    * * * * *

    Earned Value Management System NOV 2016

    * * * * *
    End Supplemental Information

    [FR Doc. 2016-27688 Filed 11-17-16; 8:45 am]

    BILLING CODE 6820-EP-P

Document Information

Effective Date:
11/18/2016
Published:
11/18/2016
Department:
National Aeronautics and Space Administration
Entry Type:
Rule
Action:
Final rule.
Document Number:
2016-27688
Dates:
Effective: November 18, 2016.
Pages:
83103-83104 (2 pages)
Docket Numbers:
FAC 2005-92, Item III, Docket No. 2016-0052, Sequence No. 5
Topics:
Government procurement
PDF File:
2016-27688.pdf
CFR: (10)
48 CFR 2.101
48 CFR 7.105
48 CFR 19.1506
48 CFR 34.201
48 CFR 34.203
More ...