96-29508. Mississippi River Transmission Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 224 (Tuesday, November 19, 1996)]
    [Notices]
    [Page 58876]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-29508]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP97-82-000]
    
    
    Mississippi River Transmission Corporation; Notice of Request 
    Under Blanket Authorization
    
    November 13, 1996.
        Take notice that on November 4, 1996, Mississippi River 
    Transmission Corporation (MRT), whose main office is located at 1600 
    Smith Street, Houston, Texas 77002, filed in Docket No. CP97-82-000 a 
    request pursuant to Sections 157.205, 157.216 of the Commission's 
    Regulations under the Natural Gas Act (18 CFR 157.205, 157.216) for 
    authorization to abandon and remove an inactive meter and regulating 
    station in Iron County, Missouri, under MRT's blanket certificate 
    issued in Docket No. CP82-489-000 pursuant to Section 7 of the Natural 
    Gas Act, all as more fully set forth in the request that is on file 
    with the Commission and open to public inspection.
        MRT proposes to abandon and remove an inactive meter and regulating 
    station on Line A-198 in Section 30, Township 34 North, Range 4 East, 
    Iron County, Missouri. This inactive delivery tap is not utilized in 
    the delivery of natural gas quantities and the company, Pilot Knob 
    Pellet Company, served by this metering facility is no longer in 
    existence. There is no other existing customer service through this 
    meter.
        MRT states that this abandonment is not prohibited by its existing 
    tariff and that it has sufficient capacity to continue to render 
    transportation service to customers connected to its pipeline system. 
    The abandonment will not have an effect on MRT's peak day and annual 
    deliveries. The abandonment of these facilities will not require any 
    new construction. The line and tap will be abandoned in place and the 
    aboveground facilities will be removed.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-29508 Filed 11-18-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/19/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-29508
Pages:
58876-58876 (1 pages)
Docket Numbers:
Docket No. CP97-82-000
PDF File:
96-29508.pdf