Take notice that on November 6, 1996, Williston Basin Interstate
Pipeline Company (Williston Basin), 200 North Third Street, Suite 300,
Bismarck, North Dakota 58501, filed an abbreviated application for a
certificate of public convenience and necessity pursuant to Section
7(c) of the Natural Gas Act. The application requests authority for the
installation and operation of an additional compressor unit and
appurtenant facilities at the Little Beaver Compressor Station, Fallon
County, Montana, all as more fully set forth in the application which
is on file with the Commission and open to public inspection.
Any person desiring to be heard or to make any protest with
reference to said application should on or before December 4, 1996,
file with the Federal Energy Regulatory Commission, 888 First Street,
N.E., Washington, D.C. 20426, a motion to intervene or a protest in
accordance with the requirements of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 385.214) and the Regulations under
the Natural Gas Act (18 CFR 157.10). All protests filed with the
Commission will be considered by it in determining the appropriate
action to be taken but will not serve to make the protestants parties
to the proceeding. Any person wishing to become a party to a proceeding
or to participate as a party in any hearing therein must file a motion
to intervene in accordance with the Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
heard without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that a grant of the certificate is required by the public
convenience and necessity. If a motion for leave to intervene is timely
filed, or if the Commission on its motion believes that a formal
hearing is required, further notice of such hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for Williston Basin to appear or be represented
at the hearing.