[Federal Register Volume 61, Number 224 (Tuesday, November 19, 1996)]
[Notices]
[Pages 58871-58872]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-29540]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Availability of the Stockpile Stewardship and Management Final
Programmatic Environmental Impact Statement
AGENCY: Department of Energy.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The Department of Energy (DOE) announces the availability of
the Stockpile Stewardship and Management Final Programmatic
Environmental Impact Statement (PEIS), DOE/EIS-0236. The Stockpile
Stewardship and Management PEIS analyzes the consequences to the
environment associated with alternative ways of maintaining the safety
and reliability of the nuclear weapons stockpile in the absence of
underground nuclear testing.
DATES: The Environmental Protection Agency published its Notice of
Availability regarding this Final PEIS on November 15, 1996. DOE
intends to issue a Record of Decision on the Stockpile Stewardship and
Management PEIS no sooner than 30 days from the publication date of the
Environmental Protection Agency Notice of Availability in the Federal
Register.
ADDRESSES AND FURTHER INFORMATION: A copy of the entire Final PEIS
(five volumes) or its Summary may be obtained upon request by calling
1-800-776-2765, or writing to: Reconfiguration Group, Office of
Technical, and Environmental Support, DP-45, U.S. Department of Energy,
1000 Independence Avenue, S.W., Washington, D.C. 20585.
Requests for copies of the Final PEIS can also be made
electronically via computer as follows: Federal Information Exchange
Bulletin Board, InterNet Address: http://web.fie.com/fedix/doeoor.html,
Modem Toll-Free: 1-800-783-3349, DC Metro Modem: 301-258-0953.
For general information on the DOE NEPA process, please contact:
Carol M. Borgstrom, Director, Office of NEPA Policy and Assistance, EH-
42, U.S. Department of Energy, 1000 Independence Avenue, S.W.,
Washington DC 20585, (202) 586-4600 or (800) 472-2756.
SUPPLEMENTARY INFORMATION: In response to the end of the Cold War and
changes in the world political regimes, the United States is no longer
producing new design nuclear weapons and is no longer conducting
underground nuclear testing. Instead, the emphasis of the United
States' nuclear weapons program is on reducing the size of the Nation's
nuclear stockpile by dismantling existing nuclear weapons. The DOE has
been directed by the President and Congress to maintain the safety and
reliability of the reduced nuclear weapons stockpile in the absence of
underground nuclear testing. In order to fulfill that responsibility,
DOE has developed the Stockpile Stewardship
[[Page 58872]]
and Management Program to provide a single, highly integrated technical
program for maintaining the continued safety and reliability of the
nuclear stockpile. The Stockpile Stewardship and Management PEIS
describes and analyzes alternative ways to implement the Stockpile
Stewardship and Management Program.
Stockpile stewardship refers to activities associated with
research, design, development, and testing of nuclear weapons, and the
assessment and certification of their safety and reliability. The
stockpile stewardship portion of the PEIS evaluates the potential
environmental impacts of three proposed facilities: the National
Ignition Facility (NIF), the Contained Firing Facility, and the Atlas
Facility. Four sites are potentially affected by the Stockpile
Stewardship alternatives: Los Alamos National Laboratory (LANL),
Lawrence Livermore National Laboratory (LLNL), Sandia National
Laboratories/New Mexico (SNL), and the Nevada Test Site (NTS).
Stockpile management refers to activities associated with the
production, maintenance, surveillance, refurbishment, and dismantlement
of the nuclear weapons stockpile. The stockpile management portion of
the PEIS evaluates the potential environmental impacts of the
reasonable alternatives for carrying out the stockpile management
functions. Alternative sites are assessed for nuclear weapons assembly/
disassembly, and for fabrication of plutonium, uranium, high
explosives, and nonnuclear components. Eight sites are potentially
affected: Savannah River Site (SRS), Oak Ridge Reservation (ORR),
Pantex Plant (Pantex), Kansas City Plant (KCP), LANL, LLNL, SNL, and
NTS.
The PEIS also evaluates the No Action alternative of relying on
existing facilities and continuing the missions at current sites to
achieve both stockpile stewardship and stockpile management missions.
The No Action alternative assesses the environmental impacts of the on-
going Stockpile Stewardship and Management Program and provides a
baseline against which alternatives can be evaluated.
The following preferred alternatives have been identified:
Stockpile Stewardship
--Construct and operate the NIF at LLNL;
--Construct and operate the Contained Firing Facility at LLNL;
--Construct and operate the Atlas Facility at LANL.
Stockpile Management
--Secondary and Case Component Fabrication--downsize the Y-12 Plant at
ORR;
--Pit Component Fabrication--re-establish capability and appropriate
capacity at LANL;
--Assembly/Disassembly--downsize at Pantex;
--High Explosives Fabrication-- downsize at Pantex;
--Nonnuclear Component Fabrication-- downsize at KCP.
Based on the analyses performed to support this PEIS, the preferred
alternatives for strategic reserve storage are as follows: (1) Highly
enriched uranium strategic reserve storage at Y-12; and (2) plutonium
pit strategic reserve storage in Zone 12 at Pantex. The preferred
alternatives for strategic reserve storage could change based upon
analyses conducted in support of the Storage and Disposition of
Weapons-Usable Fissile Materials Final PEIS. Decisions on strategic
reserve storage are not expected to be made until both the Stockpile
Stewardship and Management Final PEIS and the Storage and Disposition
of Weapons-Usable Fissile Materials Final PEIS are completed. The
preferred alternative for plutonium-242 oxide at SRS is to transport
the material to LANL for storage.
DOE has distributed copies of the Stockpile Stewardship and
Management Final PEIS to interested individuals and organizations.
Additional copies of the Final PEIS are available to any other
interested persons and can be requested as described above. DOE expects
to issue a Record of Decision on the Stockpile Stewardship and
Management PEIS no sooner than December 16, 1996.
Signed in Washington, DC this 13th day of November 1996, for the
United States Department of Energy.
Victor H. Reis,
Assistant Secretary for Defense Programs.
[FR Doc. 96-29540 Filed 11-18-96; 8:45 am]
BILLING CODE 6450-01-P