[Federal Register Volume 61, Number 224 (Tuesday, November 19, 1996)]
[Notices]
[Pages 58877-58879]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-29556]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. ER96-350-003, et al.]
Idaho Power Company, et al.; Electric Rate and Corporate
Regulation Filings
November 12, 1996.
Take notice that the following filings have been made with the
Commission:
1. Idaho Power Company
[Docket No. ER96-350-003]
Take notice that on November 5, 1996, Idaho Power Company tendered
for filing revised tariff sheets incorporating modifications required
by
[[Page 58878]]
the Commission's Order of September 13, 1996.
Comment date: November 26, 1996, in accordance with Standard
Paragraph E at the end of this notice.
2. Jersey Central Power & Light Company, Metropolitan Edison Company
and Pennsylvania Electric Company
[Docket No. ER96-2253-000]
Take notice that on October 15, 1996, GPU Service, Inc. tendered
for filing on behalf of Jersey Central Power & Light Company,
Metropolitan Edison Company and Pennsylvania Electric Company an
amendment in the above-referenced docket.
Comment date: November 26, 1996, in accordance with Standard
Paragraph E at the end of this notice.
3. Florida Power & Light Company
[Docket No. ER97-163-000]
Take notice that on October 31, 1996, Florida Power & Light Company
tendered for filing an amendment in the above-referenced docket.
Comment date: November 26, 1996, in accordance with Standard
Paragraph E at the end of this notice.
4. Central Louisiana Company, Inc.
[Docket No. ER97-235-000]
Take notice that on October 25, 1996, Central Louisiana Electric
Company, Inc. (CLECO) tendered for filing a service agreement under
which CLECO will provide non-firm point-to-point transmission service
to Aquila Power Corporation under its point-to-point transmission
tariff.
CLECO states that a copy of the filing has been served on Aquila.
Comment date: November 26, 1996, in accordance with Standard
Paragraph E at the end of this notice.
5. The Toledo Edison Company
[Docket No. ER97-301-000]
Take notice that on November 1, 1996, The Toledo Edison Company,
filed an Amendment to the Interconnection and Service Agreement between
The Toledo Edison Company and American Municipal Power--Ohio, Inc.,
Toledo Edison Rate Schedule FERC No. 34, dated May 1, 1989 to add an
Interconnection Point at the Auglaize Hydro Plant near Bryan, Ohio.
Comment date: November 25, 1996, in accordance with Standard
Paragraph E at the end of this notice.
6. The Washington Water Power Company
[Docket No. ER97-302-000]
Take notice that on November 1, 1996, The Washington Water Power
Company (WWP), tendered for filing with the Federal Energy Regulatory
Commission pursuant to 18 CFR 35.13 an executed Service Agreement
between WWP and Idaho County Light & Power Cooperative Association,
Inc., under WWP's Open Access Transmission Tariff--FERC Electric Tariff
Original Volume No. 8. WWP requests an effective date of October 1,
1996.
Comment date: November 25, 1996, in accordance with Standard
Paragraph E at the end of this notice.
7. The Washington Water Power Company
[Docket No. ER97-303-000]
Take notice that on November 1, 1996, The Washington Water Power
Company (WWP), tendered for filing with the Federal Energy Regulatory
Commission pursuant to 18 CFR 35.13 an executed Interconnection and
Operating Agreement between WWP and Idaho County Light & Power
Cooperative Association, Inc. WWP requests an effective date of October
1, 1996.
Comment date: November 25, 1996, in accordance with Standard
Paragraph E at the end of this notice.
8. Interstate Power Company
[Docket No. ER97-304-000]
Take notice that on November 1, 1996, Interstate Power Company
(IPW), tendered for filing three Transmission Service Agreements
between IPW and Dairyland Power Cooperative (Dairyland). Under the
Transmission Service Agreements, IPW will provide point-to-point
transmission service to Dairyland.
Comment date: November 25, 1996, in accordance with Standard
Paragraph E at the end of this notice.
9. Arizona Public Service Company
[Docket No. ER97-305-000]
Take notice that on November 1, 1996, Arizona Public Service
Company (APS), tendered for filing revised Exhibit B APS-FERC Rate
Schedule No. 82 between APS and Plains Electric Generation &
Transmission Cooperative, Inc. (Plains).
Current rate levels are unaffected, revenue levels are unchanged
from those currently on file with the Commission, and no other
significant change in service to these or any other customer results
from the revisions proposed herein. No new or modifications to existing
facilities are required as a result of these revisions.
Copies of this filing have been served on Plains, the New Mexico
Public Service Commission and the Arizona Corporation Commission.
Comment date: November 25, 1996, in accordance with Standard
Paragraph E at the end of this notice.
10. Niagara Mohawk Power Corporation
[Docket No. ER97-346-000]
Take notice that on November 4, 1996, Niagara Mohawk Power
Corporation (NMPC), tendered for filing with the Federal Energy
Regulatory Commission its EDP agreement with the Authority and its EDP
tariff leaves as approved by the New York State Public Service
Commission (NYPSC).
NMPC requests an effective date of October 24, 1996. NMPC has
requested waiver of the notice requirements for good cause shown.
NMPC has served copies of the filing upon the New York State Public
Service, the New York Power Authority and counsel for multiple
intervenors.
Comment date: November 25, 1996, in accordance with Standard
Paragraph E at the end of this notice.
11. Illinois Power Company
[Docket No. ER97-347-000]
Take notice that on November 4, 1996, Illinois Power Company
(Illinois Power), 500 South 27th Street, Decatur, Illinois 62526,
tendered for filing a Power Sales Tariff, Service Agreement under which
Commonwealth Edison Company will take service under Illinois Power
Company's Power Sales Tariff. The agreements are based on the Form of
Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of November 1, 1996.
Comment date: November 25, 1996, in accordance with Standard
Paragraph E at the end of this notice.
12. Illinois Power Company
[Docket No. ER97-348-000]
Take notice that on November 4, 1996, Illinois Power Company
(Illinois Power), 500 South 27th Street, Decatur, Illinois 62526,
tendered for filing a Power Sales Tariff, Service Agreement under which
Virginia Electric and Power Company will take service under Illinois
Power Company's Power Sales Tariff. The agreements are based on the
Form of Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of November 1, 1996.
Comment date: November 25, 1996, in accordance with Standard
Paragraph E at the end of this notice.
[[Page 58879]]
13. Louisville Gas and Electric Company
[Docket No. ER97-349-000]
Take notice that on November 4, 1996, Louisville Gas and Electric
Company, tendered for filing copies of a service agreement between
Louisville Gas and Electric Company and Koch Power Services, Inc. under
Rate GSS.
Comment date: November 25, 1996, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 96-29556 Filed 11-18-96; 8:45 am]