97-30307. Natural Gas Pipeline Company of America; Notice of Request under Blanket Authorization
[Federal Register Volume 62, Number 223 (Wednesday, November 19, 1997)]
[Notices]
[Page 61814]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-30307]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-68-000]
Natural Gas Pipeline Company of America; Notice of Request under
Blanket Authorization
November 13, 1997.
Take notice that on November 5, 1997, Natural Gas Pipeline Company
of America (Natural), 701 East 22nd Street, Lombard, Illinois 60148,
filed in Docket No. CP98-68-000 a request pursuant to Sections 157.205,
and 157.212, of the Commission's Regulations under the Natural Gas Act
(18 CFR 157.205, 157.212) for authorization to construct and operate
facilities in Lonoke County, Arkansas, under Natural's blanket
certificate issued in Docket No. CP82-402-000 pursuant to Section 7 of
the Natural Gas Act, all as more fully set forth in the request that is
on file with the Commission and open to public inspection.
Natural proposes to install a 2-inch meter and 3-inch side tap
facilities for an interconnection with Arkla, a Division of Noram
Energy Corporation (Arkla). These facilities will be constructed to
deliver approximately 1,000 MMBtu per day of natural gas to Arkla in
Cabot, Arkansas. They are estimated to cost $55,000. Natural states
that it has sufficient capacity to provide these services at the
proposed delivery point without detriment or disadvantage to Natural's
peak day and annual delivery capacity.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no request is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 97-30307 Filed 11-18-08; 8:45am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 11/19/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-30307
- Pages:
- 61814-61814 (1 pages)
- Docket Numbers:
- Docket No. CP98-68-000
- PDF File:
-
97-30307.pdf