[Federal Register Volume 62, Number 223 (Wednesday, November 19, 1997)]
[Notices]
[Page 61813]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-30309]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-71-000]
ANR Pipeline Company; Notice of Application
November 13, 1997.
Take notice that on November 5, 1997, ANR Pipeline Company (ANR),
500 Renaissance Center, Detroit, MI 48243, filed in Docket No. CP98-71-
000 an application pursuant to Section 7(b) of the Natural Gas Act for
permission and approval to abandon by transfer 11.74 miles of 10-inch
pipeline located in Wheeler County, TX and Beckham County, OK, all as
more fully set forth in the application which is on file with the
Commission and open to public inspection.
ANR proposes to transfer to its affiliate, ANR Field Services
Company at net book value, its Mayfield Lateral located in Beckham
County, OK and Wheeler County, TX.
The facilities, it is said, consists of 11.74 miles of 10-inch
pipeline and extent from the Mayfield Gathering System to an
intersection with ANR's 16-inch trunkline 496-1602.
ANR requests that the Commission declare that the facilities are
gathering facilities exempt from the Commission's jurisdiction under
Section 1(b) of the Natural Gas Act.
Any person desiring to be heard or any person desiring to make any
protest with reference to said application should on or before December
4, 1997, file with the Federal Energy Regulatory Commission,
Washington, DC 20426, a motion to intervene or a protest in accordance
with the requirements of the Commission's Rules of Practice and
Procedure (18 CFR 385.214 or 385.211) and the Regulations under the
Natural Gas Act (18 CFR 157.10). All protests filed with the Commission
will be considered by it in determining the appropriate action to be
taken but will not serve to make the protestants parties to the
proceeding. Any person wishing to become a party to a proceeding or to
participate as a party in any hearing therein must file a motion to
intervene in accordance with the Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that permission and approval for the proposed abandonment are
required by the public convenience and necessity. If a motion for leave
to intervene is timely filed, or if the Commission on its own motion
believes that a formal hearing is required, further notice of such
hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for ANR to appear or be represented at the
hearing.
Lois D. Cashell,
Secretary.
[FR Doc. 97-30309 Filed 11-18-97; 8:45 am]
BILLING CODE 6717-01-M