98-30921. Notice of Application Ready for Environmental Analysis  

  • [Federal Register Volume 63, Number 223 (Thursday, November 19, 1998)]
    [Notices]
    [Pages 64254-64255]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-30921]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Application Ready for Environmental Analysis
    
    November 13, 1998.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: Minor New License.
        b. Project No.: 2032-001.
        c. Date filed: September 25, 1996.
        d. Applicant: Lower Valley Power & Light, Inc.
        e. Name of Project: Strawberry.
        f. Location: On the Strawberry Creek, in Lincoln County, Wyoming. 
    The project affects 25 acres of the Bridger National Forest.
        g. Filed Pursuant to: Federal Power Act, 16 USC 791(a)-825(r).
        h. Applicant Contact: Mr. Winston G. Allred, Lower Valley Power & 
    Light, Inc., 345 North Washington Street, P.O. Box 188, Ofton, WY 
    83110, (307) 886-3175.
        i. FERC Contact: Surender M. Yepuri, P.E.; (202) 219-2847.
        j. Deadline Date: See attached paragraph D10.
        k. Status of Environmental Analysis: This application has been 
    accepted for
    
    [[Page 64255]]
    
    filing and is ready for environmental analysis at this time--see 
    attached standard paragraph D10.
        l. Brief Description of Project: The project consists of the 
    following existing facilities: (1) a 22-foot-high, 110-foot-long 
    reinforced concrete gravity dam with a 24-foot-long right abutment, a 
    40-foot-long overflow spillway with a crest elevation of 7,020 feet 
    NGVD, a 16-foot-long intake sluice section, and a 30-foot-long left 
    abutment; (2) a reservoir with a surface area of 2.8 acres at normal 
    pool elevation of 7,021 feet; (3) an 11,300-foot-long, 36-inch-diameter 
    steel penstock; (4) a powerhouse with three turbine-generator units 
    with a total installed capacity of 1,500 kilowatts; (5) a substation; 
    and (6) other appurtenances.
        m. Purpose of Project: Power generated at the project will be 
    utilized by the utility to supply its municipal utility customers.
        n. This notice also consists of the following standard paragraph: 
    D10.
        o. Locations of the Application: A copy of the application, as 
    amended and supplemented, is available for inspection and reproduction 
    at the Commission's Public Reference and Files Maintenance Branch, 
    located at 888 First Street, NE, Room 2A, Washington, DC 20426, or by 
    calling (202) 208-2325. A copy of the application may also be viewed or 
    printed by accessing the Commission's website on the Internet at 
    www.ferc.fed.us. For assistance, users may call (202) 208-2222. A copy 
    is also available for inspection and reproduction at the applicant's 
    office (see item (h) above).
        D10. Filing and Service of Responsive Documents--The application is 
    ready for environmental analysis at this time, and the Commission is 
    requesting comments, reply comments, recommendations, terms and 
    conditions, and prescriptions.
        The Commission directs, pursuant to Section 4.34(b) of the 
    Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 
    1991) that all comments, recommendations, terms and conditions and 
    prescriptions concerning the application be filed with the Commission 
    within 60 days from the issuance date of this notice. All reply 
    comments must be filed with the Commission within 105 days from the 
    date of this notice.
        Anyone may obtain an extension of time for these deadlines from the 
    Commission only upon a showing of good cause or extraordinary 
    circumstances in accordance with 18 CFR 385.2008.
        All filings must (1) bear in all capital letters the title 
    ``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND 
    CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
    name of the applicant and the project number of the application to 
    which the filing responds; (3) furnish the name, address, and telephone 
    number of the person submitting the filing; and (4) otherwise comply 
    with the requirements of 18 CFR 385.2001 through 385.2005. All 
    comments, recommendations, terms and conditions or prescriptions must 
    set forth their evidentiary basis and otherwise comply with the 
    requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
    application directly from the applicant. Any of these documents must be 
    filed by providing the original and the number of copies required by 
    the Commission's regulations to: The Secretary, Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426. 
    An additional copy must be sent to Director, Division of Project 
    Review, Office of Hydropower Licensing, Federal Energy Regulatory 
    Commission, at the above address. Each filing must be accompanied by 
    proof of service on all persons listed on the service list prepared by 
    the Commission in this proceeding, in accordance with 18 CFR 4.34(b), 
    and 385.2010.
    David P. Boergers,
    Secretary.
    [FR Doc. 98-30921 Filed 11-18-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/19/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-30921
Dates:
See attached paragraph D10.