E9-27845. Defense Federal Acquisition Regulation Supplement; Steel for Military Construction Projects (DFARS Case 2008-D038)
-
Start Preamble
AGENCY:
Defense Acquisition Regulations System, Department of Defense (DoD).
ACTION:
Final rule.
SUMMARY:
DoD has adopted as final, without change, an interim rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to implement section 108 of the Military Construction and Veterans Affairs Appropriations Act, 2009. Section 108 requires that American steel producers, fabricators, and manufacturers be given the opportunity to compete for contracts and subcontracts for the acquisition of steel for use in military construction projects or activities.
DATES:
Effective Date: November 19, 2009.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ms. Amy Williams, Defense Acquisition Regulations System, OUSD (AT&L) DPAP (DARS), IMD 3D139, 3062 Defense Pentagon, Washington, DC 20301-3062. Telephone 703-602-0328; facsimile 703-602-7887. Please cite DFARS Case 2008-D038.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
A. Background
DoD published an interim rule at 74 FR 2417 on January 15, 2009, to implement section 108 of the Military Construction and Veterans Affairs Start Printed Page 59917Appropriations Act, 2009 (Pub. L. 110-329, Division E). Section 108 prohibits the use of funds appropriated in Title I of that Act for the procurement of steel for any military construction project or activity for which American steel producers, fabricators, or manufacturers have been denied the opportunity to compete.
DoD received no comments on the interim rule. Therefore, DoD has adopted the interim rule as a final rule without change.
This rule was subject to Office of Management and Budget review under Executive Order 12866, dated September 30, 1993.
B. Regulatory Flexibility Act
DoD has prepared a final regulatory flexibility analysis consistent with 5 U.S.C. 604. A copy of the analysis may be obtained from the point of contact specified herein. The analysis is summarized as follows:
This rule implements section 108 of the Military Construction and Veterans Affairs Appropriations Act, 2009. The objective of the rule is to ensure that American steel producers, fabricators, and manufacturers are given the opportunity to compete for contracts and subcontracts for the acquisition of steel for use in military construction projects and activities. Existing Buy American Act and Balance of Payments Program requirements, implemented in FAR Subpart 25.2 and DFARS Subpart 225.75 respectively, already provide for DoD acquisition of domestic construction materials, including steel. However, this DFARS rule will prohibit use of the exceptions to Buy American Act/Balance of Program requirements otherwise permitted by FAR/DFARS, with regard to the acquisition of steel, unless American steel producers, fabricators, and manufacturers are first provided the opportunity to compete. The rule is expected to benefit American steel producers, fabricators, and manufacturers by ensuring they are provided an opportunity to compete for contracts and subcontracts for the acquisition of steel for use in military construction projects and activities. DoD received no comments on the initial regulatory flexibility analysis or on any other aspect of the interim rule.
C. Paperwork Reduction Act
The Paperwork Reduction Act does not apply, because the rule does not impose any information collection requirements that require the approval of the Office of Management and Budget under 44 U.S.C. 3501, et seq.
Start List of SubjectsList of Subjects in 48 CFR Parts 225, 236, and 252
- Government procurement
Amy G. Williams,
Editor, Defense Acquisition Regulations System.
Accordingly, the interim rule amending 48 CFR parts 225, 236, and 252, which was published at 74 FR 2417 on January 15, 2009, is adopted as a final rule without change.
End Amendment Part End Supplemental Information[FR Doc. E9-27845 Filed 11-18-09; 8:45 am]
BILLING CODE 5001-08-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 11/19/2009
- Department:
- Defense Acquisition Regulations System
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- E9-27845
- Pages:
- 59916-59917 (2 pages)
- RINs:
- 0750-AG16: Steel for Military Construction Projects (DFARS Case 2008-D038)
- RIN Links:
- https://www.federalregister.gov/regulations/0750-AG16/steel-for-military-construction-projects-dfars-case-2008-d038-
- Topics:
- Government procurement
- PDF File:
- e9-27845.pdf
- CFR: (3)
- 48 CFR 225
- 48 CFR 236
- 48 CFR 252