-
Start Preamble
Prevailing Wind Park, LLC EG19EG19-159-000 West of the Pecos Solar, LLC EG19EG19-160-000 Whitney Hill Wind Power, LLC EG19EG19-161-000 Misae Lessee LLC EG19EG19-162-000 Childress Solar Park, LLC EG19EG19-163-000 Chief Conemaugh Power II, LLC EG19EG19-164-000 Chief Keystone Power II, LLC EG19EG19-165-000 Rosewater Wind Farm LLC EG19EG19-166-000 Kaheawa Wind Power, LLC EG19EG19-167-000 SR Arlington II MT, LLC EG19EG19-168-000 SR Arlington II, LLC EG19EG19-169-000 South Peak Wind LLC EG19EG19-170-000 PGR Lessee L, LLC EG19EG19-171-000 TWE Bowman Solar Project, LLC EG19EG19-172-000 MD Solar 2, LLC EG19EG19-173-000 FL Solar 4, LLC EG19EG19-174-000 AZ Solar 1, LLC EG19EG19-175-000 GA Solar 3, LLC EG19EG19-176-000 Lily Solar LLC EG19EG19-177-000 Lily Solar Lessee, LLC EG19EG19-178-000 Take notice that during the month of October, 2019, the status of the above-captioned entities as Exempt Wholesale Generators became effective by operation of the Commission's regulations. 18 CFR 366.7(a) (2019).
Start SignatureDated: November 13, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-25032 Filed 11-18-19; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 11/19/2019
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2019-25032
- Pages:
- 63871-63871 (1 pages)
- PDF File:
- 2019-25032.pdf