-
Start Preamble
The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING:
Federal Energy Regulatory Commission, Department of Energy.
DATE AND TIME:
November 21, 2019, 10:00 a.m.
PLACE:
Room 2C, 888 First Street NE, Washington, DC 20426.
STATUS:
Open.
MATTERS TO BE CONSIDERED:
Agenda.
* NOTE—Items listed on the agenda may be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's website at http://ferc.capitolconnection.org/ using the eLibrary link, or may be examined in the Commission's Public Reference Room.
Start Signature1061th Meeting—Open Meeting
[November 21, 2019, 10:00 a.m.]
Item No. Docket No. Company ADMINISTRATIVE A-1 AD20-1-000 Agency Administrative Matters. A-2 AD20-2-000 Customer Matters, Reliability, Security and Market Operations. A-3 AD07-13-013 FY2019 Report on Enforcement. A-4 AD20-4-000 FERC Cyber Security Focus Areas. ELECTRIC E-1 RM19-5-000 Public Utility Transmission Rate Changes to Address Accumulated Deferred Income Taxes. E-2 ER19-465-000, ER19-465-001 Midcontinent Independent System Operator, Inc. E-3 ER19-468-000, ER19-468-001 California Independent System Operator Corporation. E-4 ER19-470-000, ER19-470-001, ER19-470-002 ISO New England Inc. E-5 ER19-1900-001 Golden Spread Electric Cooperative, Inc. E-6 ER19-1920-000, ER19-1920-001 Tampa Electric Company. E-7 ER19-1924-000 Cheyenne Light, Fuel and Power Company. E-8 ER19-1925-000 Black Hills Colorado Electric, LLC. E-9 ER19-1926-000 Black Hills Power, Inc. E-10 ER19-1927-000, ER19-1927-001 Portland General Electric Company. E-11 EL14-12-003 Association of Businesses Advocating Tariff Equity, Coalition of MISO Transmission Customers, Illinois Industrial Energy Consumers, Indiana Industrial Energy Consumers, Inc., Minnesota Large Industrial Group, and Wisconsin Industrial Energy Group v. Midcontinent Independent System Operator, Inc., ALLETE, Inc., Ameren Illinois Company, Ameren Missouri, Ameren Transmission Company of Illinois, American Transmission Company LLC, Cleco Power LLC, Duke Energy Business Services, LLC, Entergy Arkansas, Inc., Entergy Gulf States Louisiana, LLC, Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, Inc., Entergy Texas, Inc., Indianapolis Power & Light Company, International Transmission Company, ITC Midwest LLC, Michigan Electric Transmission Company, LLC, MidAmerican Energy Company, Montana-Dakota Utilities Co., Northern Indiana Public Service Company, Northern States Power Company-Minnesota, Northern States Power Company-Wisconsin, Otter Tail Power Company, and Southern Indiana Gas & Electric Company. EL15-45-000 Arkansas Electric Cooperative Corporation, Mississippi Delta Energy Agency, Clarksdale Public Utilities Commission, Public Service Commission of Yazoo City, and Hoosier Energy Rural Electric Cooperative, Inc. v. ALLETE, Inc., Ameren Illinois Company, Ameren Missouri, Ameren Transmission Company of Illinois, American Transmission Company LLC, Cleco Power LLC, Duke Energy Business Services, LLC, Entergy Arkansas, Inc., Entergy Gulf States Louisiana, LLC, Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, Inc., Entergy Texas, Inc., Indianapolis Power & Light Company, International Transmission Company, ITC Midwest LLC, Michigan Electric Transmission Company, LLC, MidAmerican Energy Company, Montana-Dakota Utilities Co., Northern Indiana Public Service Company, Northern States Power Company-Minnesota, Northern States Power Company-Wisconsin, Otter Tail Power Company, and Southern Indiana Gas & Electric Company. E-12 ER19-2846-000 Trans Bay Cable LLC. E-13 ER19-1910-000 Southwest Power Pool, Inc. Start Printed Page 63866 E-14 ER19-2681-000 Southwest Power Pool, Inc. E-15 ER18-1122-0000 Ameren Illinois Company. E-16 ER19-1922-000, ER19-603-002 PJM Interconnection, L.L.C. EL19-18-001 (not consolidated) American Electric Power Service Corporation v. PJM Interconnection, L.L.C. E-17 EL01-88-019 Louisiana Public Service Commission v. Entergy Services, Inc. E-18 EL19-50-000 Louisiana Public Service Commission v. Entergy Corporation, Entergy Services, LLC, Entergy Louisiana, LLC, Entergy Arkansas, LLC, Entergy Mississippi, LLC, Entergy New Orleans, LLC, and Entergy Texas, Inc. E-19 EL17-94-000 New York Power Authority v. PJM Interconnection, L.L.C. and PJM Transmission Owners in their Collective Capacity. E-20 EL19-94-000 TerraForm Power, Inc. E-21 OMITTED E-22 EL19-88-000 New York Power Authority. E-23 EL15-3-002 City and County of San Francisco v. Pacific Gas and Electric Company. ER15-702-002, ER15-703-002, ER15-704-005, ER15-705-002, ER15-735-002 (consolidated) Pacific Gas and Electric Company. E-24 ER19-34-003 Midcontinent Independent System Operator, Inc. E-25 EL16-108-001 Tilton Energy LLC v. Midcontinent Independent System Operator, Inc. EL17-29-001 American Municipal Power, Inc. v. Midcontinent Independent System Operator, Inc. EL17-31-001 Northern Illinois Municipal Power Agency v. PJM Interconnection, L.L.C. EL17-37-001 American Municipal Power, Inc. v. PJM Interconnection, L.L.C. L17-54-001 Dynegy Marketing and Trade, LLC and Illinois Power Marketing Company v. Midcontinent Independent System Operator, Inc. E-26 EL15-67-004 Linden VFT, LLC v. PJM Interconnection, L.L.C. ER15-2562-003 PJM Interconnection, L.L.C. ER17-950-004 PJM Interconnection, L.L.C. EL17-68-001 Linden VFT, LLC v. PJM Interconnection, L.L.C. EL17-84-002 PJM Interconnection, L.L.C. EL17-90-002 Linden VFT, LLC v. Public Service Electric and Gas Company and PJM Interconnection, L.L.C. EL17-94-001 New York Power Authority v. PJM Interconnection, L.L.C. and PJM Transmission Owners in their Collective Capacity ER18-579-003 PJM Interconnection, L.L.C. ER18-680-001 PJM Interconnection, L.L.C. EL18-54-001 New Jersey Board of Public Utilities v. PJM Interconnection, L.L.C., New York Independent System Operator, Inc., Consolidated Edison Company of New York, Inc., Linden VFT, LLC, Hudson Transmission Partners, LLC and New York Power Authority. GAS G-1 PR17-60-003 PR17-60-004 Atmos Pipeline—Texas G-2 RP18-851-000 Cheniere Energy, Inc. G-3 OR19-31-000 Saddlehorn Pipeline Company, LLC G-4 OMITTED G-5 OR19-26-000 American Aviation Supply LLC, Delta Air Lines, Inc., JetBlue Airways Corporation, and United Airlines, Inc. v. Buckeye Pipe Line Company, L.P. G-6 OR16-26-000 Aircraft Service International Group, Inc., American Airlines, Inc., Delta Air Lines, Inc., Hooker's Point Fuel Facilities LLC, Southwest Airlines Co., United Aviation Fuels Corporation, and United Parcel Service, Inc. v. Central Florida Pipeline LLC and Kinder Morgan Liquid Terminals LLC HYDRO H-1 P-2242-110 Eugene Water & Electric Board H-2 P-1889-089 FirstLight Hydro Generating Company and FirstLight MA Hydro LLC P-2485-078 FirstLight Hydro Generating Company and Northfield Mountain LLC. CERTIFICATES C-1 CP16-116-000 Texas LNG Brownsville LLC. C-2 CP16-454-000 Rio Grande LNG, LLC. CP16-455-000 Rio Bravo Pipeline Company, LLC. C-3 CP16-480-000 Annova LNG Common Infrastructure, LLC, Annova LNG, Brownsville A, LLC, Annova LNG Brownsville B, LLC, and Annova LNG Brownsville C, LLC. C-4 CP18-332-000 EL Paso Natural Gas Company, L.L.C. C-5 CP17-40-002 Spire STL Pipeline LLC. C-6 CP18-512-000 Corpus Christi Liquefaction Stage III, LLC and Corpus Christi Liquefaction, LLC. CP18-513-000 Cheniere Corpus Christi Pipeline, LP. Start Printed Page 63867End SignatureIssued: November 14, 2019.
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through http://ferc.capitolconnection.org/. Anyone with internet access who desires to view this event can do so by navigating to www.ferc.gov' s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit http://ferc.capitolconnection.org/ or contact Shirley Al-Jarani at 703-993-3104.
Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.
End Preamble[FR Doc. 2019-25127 Filed 11-15-19; 11:15 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 11/19/2019
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2019-25127
- Pages:
- 63865-63867 (3 pages)
- PDF File:
- 2019-25127.pdf