NUCLEAR REGULATORY COMMISSION
Probabilistic Risk Assessment (PRA) Implementation Plan Workshop
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of public workshop.
-----------------------------------------------------------------------
SUMMARY: The Nuclear Regulatory Commission (NRC) will conduct a public
workshop on December 2, 1994, to discuss the Commission's Probabilistic
Risk Assessment (PRA) Implementation Plan. The PRA Implementation Plan
was developed to ensure that the increased use of PRA methods and
technology in nuclear regulatory activities would be implemented in a
consistent and predictable manner that promotes regulatory stability
and efficiency. The purpose of the workshop is to inform the public of
NRC activities related to increasing the use of PRA methods and
techniques in regulatory applications and receive public comments on
these activities. The principal focus of this workshop will be PRA
applications for commercial power reactors and while the NRC
presentations will be broad in nature, NRC staff representatives will
be present to address specific areas of concern or specific line items
in the PRA Implementation Plan.
DATES: November 28, 1994--Advance notification of intent to attend the
workshop, desire to comment or make a presentation during the workshop,
or both, is requested by the NRC. Participants are encouraged to submit
written comments, presentation summaries, or both to the staff by this
date.
December 2, 1994--The workshop will be held at the NRC Auditorium
from 8:30 am to 4:30 pm.
January 20, 1995--All written comments on matters covered by the
workshop received by this date will be considered by the staff. Written
comments received after January 20, 1995, will be considered to the
extent practical.
Written comments on the PRA Implementation Plan will be accepted
before, during, and after the workshop. Advance comments, which could
serve to enhance the effectiveness of the workshop are particularly
solicited.
ADDRESSES: The workshop will be held in the NRC Auditorium. The NRC
Auditorium is located on an underground level between the One White
Flint North Building and the Two White Flint North Building at 11545
Rockville Pike, Rockville, Maryland 20852. The NRC buildings are
located across from the entrance to the White Flint Metro Station.
Notification of intent to attend, desire to make a statement or
presentation should be sent to Thomas G. Hiltz, Office of Nuclear
Reactor Regulation, Mail Stop O-11-F-23, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001. These notifications can also be
transmitted via facsimile or telephone. The facsimile number is (301)
504-2279 and the telephone number is (301) 504-1105. The facsimile
cover sheet should contain the address information listed above.\1\
\1\Letter or facsimile notifications should contain, and people
giving notification via telephone should be prepared to provide, the
following pre-registration information: full name of participants/
attendees, name of organization or business, mailing address,
daytime telephone, facsimile number, a statement concerning whether
the person or organization will provide comments or a presentation
during the workshop, a statement concerning whether the person or
organization intents to provide written comments before or after the
workshop, and any specific questions or comments that the
participant or organization would like to be considered and/or
addressed at the workshop.
Copies of documents cited in the supplementary Information section
are available for inspection and/or for reproduction for a fee in the
NRC Public Document Room, 2120 L Street NW (Lower Level), Washington,
DC 20037. Copies of NUREGs cited in this document may be purchased from
the Superintendent of Documents, U.S. Government Printing Office, P.O.
Box 37082, Washington, DC 20013-7082. Copies are also available for
purchase from the National Technical Information Service, 5285 Port
Royal Road, Springfield, VA 22161.
In addition, copies of the following documents can be obtained
electronically by accessing the NRC electronic bulletin board system
(BBS) Tech Specs Plus:
(1) SECY-94-218, ``Proposed Policy Statement on the Use of
Probabilistic Risk Assessment Methods in Nuclear Regulatory
Activities'';
(2) SECY-94-219, ``Proposed Agency-Wide Implementation Plan for
Probabilistic Risk Assessment (PRA)'';
(3) the Commission's Staff Requirements Memorandum (SRM) of
September 13, 1994 concerning the August 30, 1994 Commission meeting;
and
(4) the Commission's SRM of October 4, 1994 on SECY-94-218.
These four WordPerfect 5.1 documents are located in the BBS MISC
library directory under the single filename ``PRAPLAN.ZIP''. The BBS
operates 24 hours a day and can be accessed through a toll-free number,
1-800-679-5784, at modem speeds up to 9600 baud with communication
parameters set at 8 data bits, no parity, 1 stop bit, full duplex, and
using ANSI terminal emulation.
Written comments may be sent to the Chief, Rules Review and
Directives Branch, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001.
Hand-deliver comments to Two White Flint North, 11545 Rockville
Pike, Rockville, Maryland 20852, between 7:30 am and 4:15 pm on Federal
workdays.
Copies of comments received and relevant reference documents may be
examined at the NRC Public Document Room at 2120 L Street NW. (Lower
Level), Washington, DC, between the hours of 7:45 am and 4:15 pm on
Federal workdays.
FOR FURTHER INFORMATION CONTACT: Thomas G. Hiltz, Office of Nuclear
Reactor Regulation, Mail Stop OWFN 11-F-23, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, telephone (301) 504-1105.
SUPPLEMENTARY INFORMATION:
I. Background.
II. Tentative Agenda.
III. Workshop Content and Structure.
I. Background
The Proposed PRA Policy Statement
To establish top-level guidance on the use of PRA in nuclear
regulatory activities and aid in development of a detailed PRA
Implementation Plan, the NRC staff proposed a policy statement
regarding the use of PRA in regulatory activities. The policy statement
would articulate the Commission's position on the role of PRA in
various regulatory programs and would communicate that position to the
NRC staff, the public, licensees, and applicants for licenses.
The NRC staff discussed its recommendations for a PRA policy
statement in SECY-94-218, ``Proposed Policy Statement on the Use of
Probabilistic Risk Assessment Methods in Nuclear Regulatory
Activities.'' In SECY-94-218, the staff stated that an overall policy
on the use of PRA in nuclear regulatory activities should be
established so that the many potential applications of PRA can be
implemented in a consistent and predictable manner that promotes
regulatory stability and efficiency. In addition, the staff stated that
the use of PRA technology in NRC regulatory activities should be
increased. The increased use of PRA methods and technology is intended
to complement and enhance deterministic-based regulations by using PRA
technology in activities where methods and data are well understood.
The staff believes the increased use of PRA technology would lead to
improved risk-effective safety decisions and more focused and efficient
use of NRC staff and industry resources.
The Commission concludes that increased use of PRA techniques as an
integral part of the regulatory decision-making process is now
justified. Consequently, the Commission has proposed a policy to
encourage the use of PRA and to expand the scope of PRA applications in
nuclear regulatory matters to the extent supported by the state-of-the-
art methods and data. An important aspect of the expanded use of PRA
technology would be a strengthening of NRC's defense-in-depth
philosophy by helping to identify and address weaknesses or overly
conservative regulatory requirements for the physical and functional
barriers. In its Staff Requirements Memorandum of October 4, 1994, the
Commission directed the staff to revise the proposed policy statement
and publish the proposed policy statement for public comment. The
proposed PRA Policy Statement is scheduled to be published in the
Federal Register in November 1994 for a 60-day public comment period.
The PRA Implementation Plan
The PRA Implementation Plan was developed in parallel with the
Proposed PRA Policy Statement to ensure that the increased use of PRA
methods and technology in nuclear regulatory activities would be
implemented in a consistent and predictable manner that promotes
regulatory stability and efficiency. This PRA Implementation Plan is a
``living'' document that provides the framework for NRC management
oversight of the use of PRA methods and technology in regulatory
activities.
As previously discussed, PRA methods have been applied successfully
in numerous nuclear regulatory activities and have proven to be a
valuable complement to deterministic engineering approaches. However,
the increased use of PRA in nuclear regulatory activities has broad
implications and could result in changes in many areas associated with
our current regulatory framework. These areas, considered by the staff
in developing the draft PRA Implementation Plan, may include: Changes
to regulations, guidance documents and inspection programs, a
substantial shift in staff resources including recruiting and training
programs to provide the necessary PRA expertise, an increased emphasis
on continued development of PRA methods and decision-making tools, and
enhanced reliability data collection. As discussed in SECY-94-218, the
expanded use of PRA in nuclear regulatory activities may raise
additional policy, technical, and legal issues that will be considered
in subsequent modifications to the PRA Implementation Plan.
Principal Issues Related to Increasing Use of Risk Assessment
Four principal issues associated with applying risk assessment
methods and techniques to regulatory applications are highlighted in
the PRA Implementation Plan. These issues included development of
regulatory decision-making criteria, collection and analysis of
equipment and human performance data, development and use of consistent
PRA models and methods, and development of a systemic PRA training
program.
To ensure consistent and appropriate decision-making that
incorporates PRA methods and results, it is crucial that coherent and
clear criteria are applied. As part of this plan, decision criteria
will be established that address the interdependence of probabilistic
risk and deterministic engineering principles. The process of
developing these criteria will involve communications among the NRC,
the nuclear industry, and the public to ensure an understanding by all
parties of the role of PRA methods and results in NRC's risk management
efforts.
The NRC staff uses equipment performance data in the conduct of
PRAs, reliability analyses, component failure studies, plant aging
studies, identification and resolution of generic issues, preparation
for inspections, and reviews of technical specifications change
requests. For these purposes, the staff uses generic data supplemented
with a limited amount of plant-specific data. The use of the generic
data can be problematic because the data have not been verified or
updated and do not differentiate between plant-to-plant variations in
performance or changes in performance as reactor plants age. The ad hoc
collection of plant-specific data is costly and inefficient.
The availability of human performance data is even more
problematic. One reason is the lack of established and accepted human
performance analysis methods and models upon which to base the
collection of human performance data. This is particularly important in
the analysis of operator performance in response to events during which
both acts of omission and commission may occur. Human reliability
methods and data are currently the focus of research and limited
evaluations of human performance issues raised by analysis of operating
reactor events.
As the NRC and the nuclear reactor industry move toward greater use
of PRA, the need for better data on human performance, plant-specific
safety system availability data (at the system train level), and
equipment reliability data will be required to continue to increase the
role of PRA in the regulatory decision-making process. Increased
availability of data on equipment and human performance is very
important to implementing many risk-based regulation initiatives. For
example, this information is essential for implementing the maintenance
rule and in supporting the development of risk-based technical
specifications.
The NRC staff recognizes the need to collect equipment and human
performance data. This information, derived largely from operating
experience, will continue to provide a source of credible performance
data for NRC use in the regulatory process.
The NRC PRA Working Group identified the need for the development
and use of consistent PRA models and methods. Several tasks that are
now being undertaken include the development of more user-friendly
computer interfaces; the development of low-power and shutdown models,
external events models, and Level 2/3 PRA models compatible with the
needs of NRC events assessment staff; and the development of methods
for consistently identifying the appropriate detailed PRA model for use
in the analysis of individual events or issues.
It is important to note that not all of the NRC's risk management
activities lend themselves to a risk analysis approach that uses a
probabilistic, fault free methodology. The NRC recognizes that a single
approach to risk management is not appropriate. As part of the PRA
Implementation Plan the NRC will develop and validate risk assessment
models and methods.
Another issue is the training of the staff who will not be directly
working with PRA methods. As the NRC shifts to grater use of, and
reliance on, PRA methods and risk-based regulation, all technical staff
members, including inspectors, will need to develop an understanding of
the strengths and weaknesses of PRA methods and their use. The PRA
Implementation Plan includes an extensive training program. This
training program is based on the systems approach to training, which
includes completing job task analyses, developing learning objectives,
developing and delivering courses, evaluating trainee mastery of
objectives, and modifying the PRA training program as necessary.
Because the number of NRC staff members who will need training is
large, a large resource commitment over the next several years will be
required.
The PRA Implementation Plan will require users and developers of
the new methods to have significant experience in PRA methods and
statistics. It will take time for these staff members to gain the
necessary experience. Some of the knowledge and skills needed to do
this work can be obtained though traditional training. However, on-the-
job training, classroom instruction, and industrial experience will be
needed in order to acquire some of the required knowledge and
experience. Recruiting of outside experts and intensified development
of current staff members will likely be necessary to gain this staff
experience. This process will take several years to accomplish and will
be a major factor in the success of the PRA Implementation Plan and in
establishing the pace of its implementation.
II. Tentative Agenda
December 2, 1994
7:30 am Registration
8:30 am Introduction
8:45 am PRA Policy Statement Overview (NRC)
9:15 am Implementation Plan Overview (NRC)
10:00 am Break
10:15 am Industry Interactions (NRC/Industry)
11:45 am Lunch
1:00 pm Participant Presentations/Panel Discussion in Response to
Participant Comments
2:45 pm Break
3:00 pm Participant Presentations/Panel Discussion in Response to
Participant Comments (cont'd)
4:00 pm Summary and Conclusions
4:30 pm Adjourn
III. Workshop Content and Structure
The workshop is structured to include NRC staff presentations
during the morning and to allow interested parties to make
presentations during the afternoon. An opportunity for questions and
comments following presentations is planned.
In the afternoon session, participants will be allowed to express
their views and make presentations. Participants who will be making
presentations will be scheduled in the order in which they notified the
staff of their intention to make a presentation. Comments will be taken
from parties in the order in which they notified the staff of their
intent to comment. The order of comment will be:
(1) Parties who notified the staff by November 28, 1994;
(2) Parties registering to comment before 8:30 a.m. the day of the
workshop; and
(3) Parties who have not given prior notice.
Organizations that notify the staff by November 28, 1994, of their
intent to give a presentation will be limited to 20 minutes. Otherwise
organization and individual presentations and comments will be limited
to 5 minutes. These time limits may be adjusted depending on the number
of presentations and comments. The workshop will be transcribed, and
the transcript will be available in the NRC Public Document Room.
To foster meaningful discussions during this session and to aid
participants in preparing their presentations and comments,
participants should consider the following set of questions:
What additional areas should be considered regarding the
increased use of PRA in regulatory applications?
What areas currently in the PRA Implementation Plan
require additional emphasis? What areas are emphasized too much?
Is the overall impact of the PRA Policy Statement on
regulatory activities clearly evident by the activities in the PRA
Implementation Plan?
What impact will the PRA Policy Statement and the PRA
Implementation Plan have on those organizations that the NRC regulates?
Dated in Rockville, Maryland, this 27th day of October 1994.
For the Nuclear Regulatory Commission.
Edward J. Butcher,
Chief, Probabilistic Safety Assessment Branch, Office of Nuclear
Reactor Regulation.