[Federal Register Volume 60, Number 212 (Thursday, November 2, 1995)]
[Notices]
[Pages 55713-55714]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27183]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP96-35-000]
Steuben Gas Storage Company; Notice of Application
October 27, 1995.
Take notice that on October 24, 1995, Steuben Gas Storage Company
(Steuben), 500 Renaissance Center, Detroit, Michigan 48243, filed an
application for a blanket certificate of public convenience and
necessity authorizing the storage of natural gas, at Steuben's Adrian
storage field, pursuant to 18 CFR 284.221, of the Federal Energy
Regulatory Commission's Regulations, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection.
Steuben states that the purpose of this filing is to comply with
Ordering Paragraph (D) of the Commission's July 28, 1995, ``Preliminary
Determination on Non-Environmental Issues'', at Docket Nos. CP95-119-
000 and CP95-119-001, requiring Steuben to apply for a blanket
certificate under Part 284 and file an open-access tariff for its
Adrian storage field storage services.
Any person desiring to be heard or to make any protest with
reference to said application should on or before November 3, 1995,
file with the Federal Energy Regulatory Commission, Washington, DC
20426, a motion to intervene or a protest in accordance with the
requirements of the Commission's Rules of Practice and Procedure (18
CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act
(18 CFR 157.10). All protests filed with the Commission will be
considered by it in determining the appropriate action to be taken but
will not serve to make the protestants parties to the proceeding. Any
person wishing to become a party to a proceeding or to participate as a
party in any hearing therein must file a motion to intervene in
accordance with the Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to jurisdiction conferred upon the Federal Energy
Regulatory Commission by
[[Page 55714]]
Sections 7 and 15 of the Natural Gas Act and the Commission's Rules of
Practice and Procedure, a hearing will be held without further notice
before the Commission or its designee on this application if no motion
to intervene is filed within the time required herein, if the
Commission on its own review of the matter finds that a grant of the
certificate is required by the public convenience and necessity. If a
motion for leave to intervene is timely filed, or if the Commission on
its own motion believes that a formal hearing is required, further
notice of such hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for Steuben to appear or be represented at the
hearing.
Lois D. Cashell,
Secretary.
[FR Doc. 95-27183 Filed 11-1-95; 8:45 am]
BILLING CODE 6717-01-M