98-29233. Northwest Pipeline Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 211 (Monday, November 2, 1998)]
    [Notices]
    [Page 58716]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-29233]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-24-000]
    
    
    Northwest Pipeline Corporation; Notice of Request Under Blanket 
    Authorization
    
    October 27, 1998.
        Take notice that on October 19, 1998, Northwest Pipeline 
    Corporation (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84158, 
    filed a request with the Commission in Docket No. CP98-24-000, pursuant 
    to Sections 157.205 and 157.216(b) of the Commission's Regulations 
    under the Natural Gas Act (NGA) for authorization to abandon in place, 
    approximately 1.3 miles of the Issaquah Lateral authorized in blanket 
    certificate issued in Docket No. CP82-433-000, all as more fully set 
    forth in the request on file with the Commission and open to public 
    inspection.
        Northwest proposes to abandon in place the portion of the Issaquah 
    Lateral which was authorized to be abandoned by sale in Docket No. 
    CP97-657-000. Northwest received approval to abandon by removal the 
    first 407 feet of the Issaquah Lateral and appurtenant facilities, and 
    to abandon only the remainder of the Issaquah Lateral (Docket No. CP98-
    656-000), amounting to approximately 1.3 miles of 6-inch pipeline, by 
    sale to Puget Sound Energy, Inc. (Puget). Northwest reports that after 
    extensive negotiations, Puget and Northwest have been unable to 
    finalize an agreement for the sale of the lateral. Northwest further 
    reports the lateral has been taken out of service in conjunction with 
    the authorized removal of the first 407 feet of the Issaquah Lateral. 
    Northwest continues that the remaining pipeline was packed with 
    nitrogen and capped at each end in conjunction with the abandonment by 
    removal of the first 407 feet of the lateral, and no further 
    disturbance of ground or incurring costs would be required for the 
    proposed abandonment in place.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the tine 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-29233 Filed 10-30-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/02/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-29233
Pages:
58716-58716 (1 pages)
Docket Numbers:
Docket No. CP99-24-000
PDF File:
98-29233.pdf