[Federal Register Volume 62, Number 224 (Thursday, November 20, 1997)]
[Notices]
[Pages 62041-62046]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-30504]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG97-85-000, et al.]
Electric Rate and Corporate Regulation Filings; Entergy Power
Generation Corporation, et al.
November 14, 1997.
Take notice that the following filings have been made with the
Commission:
1. Entergy Power Generation Corporation
[Docket No. EG97-85-000]
On November 10, 1997, Entergy Power Generation Corporation filed
with the Federal Energy Regulatory Commission a supplement to its
September 26, 1997, application for determination of exempt wholesale
generator status pursuant to Part 365 of the Commission's Regulations.
The supplemental material included clarification sought by the
Commission Staff.
Comment date: November 24, 1997, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
2. De Pe Energy L.L.C.
[Docket No. EG98-4-000]
On October 24, 1997, De Pere Energy L.L.C. (De Pere), filed with
the Federal Energy Regulatory Commission an application for
determination of exempt wholesale generator status pursuant to Part 365
of the Commission's Regulations.
De Pere is developing a gas-fired eligible facility with an initial
capacity of approximately 180 megawatts (net) operating as a simple-
cycle combustion turbine, and later as an approximate 255 megawatt
(net) combined-cycle cogeneration plant producing both electricity and
steam, to be located in the City of De Pere, Brown County, Wisconsin.
Comment date: December 4, 1997, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
3. Enfield Energy Centre Limited
[Docket No. EG98-8-000]
Take notice that on November 10, 1997, Enfield Energy Centre
Limited, a limited liability company incorporated and existing under
the laws of the England and Wales, having its registered office at Cam
Lea Offices, 975 Mollison Avenue, Enfield, Middlesex, EN3 7NN, England
(the Applicant), filed with the Federal Energy Regulatory Commission an
application for determination of exempt wholesale generator (EWG)
status pursuant to Part 365 of the Commission's Regulations.
Applicant states that it will be engaged directly in owning an
eligible facility, the Enfield Energy power plant located in the
Borough of Enfield, North London, England (the Plant). The Plant will
consist of a 396 MW combined cycle power plant, fueled by natural gas
with gas oil as backup fuel.
Comment date: December 5, 1997, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
[[Page 62042]]
4. Kentucky Utilities Company
[Docket No. ER97-3378-000]
Take notice that on November 6, 1997, Kentucky Utilities Company
(KU), tendered for filing an Amendment to the five (5) Supplements to
FERC Rate Schedule 203, the Interconnection Agreement between KU and
East Kentucky Power Cooperative.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
5. Consolidated Edison Company of New York, Inc.
[Docket No. ER97-4006-000]
Take notice that on November 3, 1997, Consolidated Edison Company
of New York, Inc., tendered for filing a summary of the electric
exchanges, electric capacity, and electric other energy trading
activities under its FERC Electric Tariff Rate Schedule No. 2, for the
quarter ending June 30, 1997.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
6. Denver City Energy Associates, L.P.
[Docket No. ER97-4084-001]
Take notice that on November 3, 1997, Denver City Energy
Associates, L.P. (DCE), tendered for filing a Code of Conduct in
compliance with the Federal Energy Regulatory Commission (the
Commission) Order on Proposed Market-Based Rates of GS Electric
Generating Cooperative, Inc., and DCE issued October 17, 1997 in Docket
Nos. ER97-3583-000 and ER97-4084-000.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
7. Cargill-IEC, L.L.C.
[Docket No. ER97-4273-001]
Take notice that on October 31, 1997, Cargill-IEC, L.L.C. (Cargill-
IEC), tendered for filing, pursuant to the Commission's October 17,
1997, Order Conditionally Accepting Proposed Market-Based Rates, a
Compliance Filing including a revised Statement of Policy and Standards
of Conduct governing the relationship between the IEC Companies and
their affiliated wholesale power marketer, Cargill-IEC.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
8. GENSYS Energy
[Docket No. ER97-4335-001]
On November 3, 1997, GENSYS Energy made its compliance
filing as required under Ordering Paragraph (A) of the Commission's
Order issued in this proceeding on October 17, 1997.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
9. Idaho County Light & Power Cooperative Association, Inc.
[Docket No. ER97-4435-001]
Take notice that on November 4, 1997, Idaho County Light & Power
Cooperative Association, Inc. (Idaho County), advised the Commission
that it retired its debt from the Rural Utilities Service on October
21, 1997.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
10. Wisconsin Power and Light Company
[Docket No. ER97-4815-000]
Take notice that on November 3, 1997, Wisconsin Power and Light
Company (WP&L), tendered for filing a request to withdraw its filing in
Docket No. ER97-4815-000.
WP&L requests waiver of the Commission's notice requirements to
permit the requested action. A copy of this filing has been served upon
the Public Service Commission of Wisconsin.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
11. Detroit Edison Company
[Docket No. ER98-205-000]
Take notice that on October 15, 1997, the Detroit Edison Company
(Detroit Edison) filed a revised Service Agreement in the above-
referenced docket. Detroit Edison requests that the revised Service
Agreement be made effective as of November 1, 1997.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
12. PP&L, Inc.
[Docket No. ER98-292-000]
Take notice that on October 27, 1997, PP&L, Inc., (formerly known
as Pennsylvania Power & Light Company) (PP&L), filed a Service
Agreement dated October 3, 1997, with Northern Indiana Public Service
Co. (NIPSC) under PP&L's FERC Electric Tariff, Original Volume No. 5.
The Service Agreement adds NIPSC as an eligible customer under the
tariff.
PP&L requests an effective date of October 27, 1997, for the
Service Agreement.
PP&L states that copies of this filing have been supplied to NIPSC
and to the Pennsylvania Public Utility Commission.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
13. PECO Energy Company
[Docket No. ER98-293-000]
Take notice that on October 27, 1997, PECO Energy Company (PECO)
filed an executed Installed Capacity Obligation Allocation Agreement
between PECO and Woodruff Oil Company d/b/a Woodruff Energy
(hereinafter Supplier). The terms and conditions contained within this
Agreement are identical to the terms and conditions contained with the
Form of Installed Capacity Allocation Agreement filed by PECO with the
Commission on October 3, 1997, at Docket No. ER98-28-000. This filing
merely submits an individual executed copy of the Installed Capacity
Obligation Allocation Agreement between PECO and an alternate supplier
participating in PECO's Pilot.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
14. PECO Energy Company
[Docket No. ER98-294-000]
Take notice that on October 27, 1997, PECO Energy Company (PECO)
filed an executed Transmission Agency Agreement between PECO and
Woodruff Oil Company d/b/a Woodruff Energy (hereinafter Supplier). The
terms and conditions contained within this Agreement are identical to
the terms and conditions contained with the Form of Transmission Agency
Agreement submitted to the Commission on October 3, 1997, as part of
the joint filing by the Pennsylvania Public Utility Commission and the
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing
merely submits an individual executed copy of the Transmission Agency
Agreement between PECO and an alternative supplier participating in
PECO's Retail Access Pilot Program.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
15. PECO Energy Company
[Docket No. ER98-295-000]
Take notice that on October 27, 1997, PECO Energy Company (PECO)
filed an executed Transmission Agency Agreement between PECO and QST
Energy Inc., (hereinafter Supplier). The terms and conditions contained
within
[[Page 62043]]
this Agreement are identical to the terms and conditions contained with
the Form of Transmission Agency Agreement submitted to the Commission
on October 3, 1997, as part of the joint filing by the Pennsylvania
Public Utility Commission and the Pennsylvania PJM Utilities at Docket
No. ER98-64-000. This filing merely submits an individual executed copy
of the Transmission Agency Agreement between PECO and an alternative
supplier participating in PECO's Retail Access Pilot Program.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
16. PECO Energy Company
[Docket No. ER98-296-000]
Take notice that on October 27, 1997, PECO Energy Company (PECO),
filed an executed Transmission Agency Agreement between PECO and UGI
Power Supply Inc., (hereinafter Supplier). The terms and conditions
contained within this Agreement are identical to the terms and
conditions contained with the Form of Transmission Agency Agreement
submitted to the Commission on October 3, 1997, as part of the joint
filing by the Pennsylvania Public Utility Commission and the
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing
merely submits an individual executed copy of the Transmission Agency
Agreement between PECO and an alternative supplier participating in
PECO's Retail Access Pilot Program.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
17. PECO Energy Company
[Docket No. ER98-297-000]
Take notice that on October 27, 1997, PECO Energy Company (PECO)
filed an executed Transmission Agency Agreement between PECO and Duke
Trading and Marketing L.L.C., (hereinafter Supplier). The terms and
conditions contained within this Agreement are identical to the terms
and conditions contained with the Form of Transmission Agency Agreement
submitted to the Commission on October 3, 1997, as part of the joint
filing by the Pennsylvania Public Utility Commission and the
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing
merely submits an individual executed copy of the Transmission Agency
Agreement between PECO and an alternative supplier participating in
PECO's Retail Access Pilot Program.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
18. PECO Energy Company
[Docket No. ER98-298-000]
Take notice that on October 27, 1997, PECO Energy Company (PECO)
filed an executed Installed Capacity Obligation Allocation Agreement
between PECO and NorAm Energy Management Inc., (hereinafter Supplier).
The terms and conditions contained within this Agreement are identical
to the terms and conditions contained with the ``Form of Installed
Capacity Allocation Agreement'' filed by PECO with the Commission on
October 3, 1997, at Docket No. ER98-28-000. This filing merely submits
an individual executed copy of the Installed Capacity Obligation
Allocation Agreement between PECO and an alternate supplier
participating in PECO's Pilot.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
19. PECO Energy Company
[Docket No. ER98-299-000]
Take notice that on October 27, 1997, PECO Energy Company (PECO)
filed an executed Installed Capacity Obligation Allocation Agreement
between PECO and QST Energy Inc., (hereinafter Supplier). The terms and
conditions contained within this Agreement are identical to the terms
and conditions contained with the Form of Installed Capacity Allocation
Agreement filed by PECO with the Commission on October 3, 1997, at
Docket No. ER98-28-000. This filing merely submits an individual
executed copy of the Installed Capacity Obligation Allocation Agreement
between PECO and an alternate supplier participating in PECO's Pilot.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
20. PECO Energy Company
[Docket No. ER98-300-000]
Take notice that on October 27, 1997, PECO Energy Company (PECO)
filed an executed Installed Capacity Obligation Allocation Agreement
between PECO and West Penn Power Company dba Allegheny Power
(hereinafter Supplier). The terms and conditions contained within this
Agreement are identical to the terms and conditions contained with the
Form of Installed Capacity Allocation Agreement filed by PECO with the
Commission on October 3, 1997, at Docket No. ER98-28-000. This filing
merely submits an individual executed copy of the Installed Capacity
Obligation Allocation Agreement between PECO and an alternate supplier
participating in PECO's Pilot.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
21. PECO Energy Company
[Docket No. ER98-301-000]
Take notice that on October 27, 1997, PECO Energy Company (PECO)
filed an executed Transmission Agency Agreement between PECO and
Pennsylvania Power & Light Co., (hereinafter Supplier). The terms and
conditions contained within this Agreement are identical to the terms
and conditions contained with the Form of Transmission Agency Agreement
submitted to the Commission on October 3, 1997, as part of the joint
filing by the Pennsylvania Public Utility Commission and the
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing
merely submits an individual executed copy of the Transmission Agency
Agreement between PECO and an alternative supplier participating in
PECO's Retail Access Pilot Program.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
22. PECO Energy Company
[Docket No. ER98-302-000]
Take notice that on October 27, 1997, PECO Energy Company (PECO)
filed an executed Transmission Agency Agreement between PECO and
Energis Resources Inc.,(hereinafter Supplier). The terms and conditions
contained within this Agreement are identical to the terms and
conditions contained with the Form of Transmission Agency agreement
submitted to the Commission on October 3, 1997, as part of the joint
filing by the Pennsylvania Public Utility Commission and the
Pennsylvania PJM Utilities at Docket No. ER98-64-000.
[[Page 62044]]
This filing merely submits an individual executed copy of the
Transmission Agency Agreement between PECO and an alternative supplier
participating in PECO's Retail Access Pilot Program.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
23. Jersey Central Power & Light Company, Metropolitan Edison
Company, and Pennsylvania Electric Company
[Docket No. ER98-344-000]
Take notice that on October 28, 1997, Jersey Central Power & Light
Company, Metropolitan Edison Company and Pennsylvania Electric Company
(d/b/a GPU Energy), filed an executed Service Agreement between GPU
Energy and Energis Resources Incorporated (ENR), dated October 22,
1997. This Service Agreement specifies that ENR has agreed to the
rates, terms and conditions of GPU Energy's Operating Capacity and/or
Energy Sales Tariff (Sales Tariff) designated as FERC Electric Tariff,
Original Volume No. 1. The Sales Tariff was accepted by the Commission
by letter order issued on February 10, 1995 in Jersey Central Power &
Light Co., Metropolitan Edison Co., and Pennsylvania Electric Co.,
Docket No. ER95-276-000 and allows GPU Energy and ENR to enter into
separately scheduled transactions under which GPU Energy will make
available for sale, surplus operating capacity and/or energy at
negotiated rates that are no higher than GPU Energy's cost of service.
GPU Energy requests a waiver of the Commission's notice
requirements for good cause shown and an effective date of October 22,
1997, for the Service Agreement.
GPU Energy has served copies of the filing on regulatory agencies
in New Jersey and Pennsylvania.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
24. IES Utilities Inc.
[Docket No. ER98-346-000]
Take notice that on October 28, 1997, IES Utilities Inc. (IES),
tendered for filing Form of Service Agreement for Firm Point-to-Point
Transmission Service establishing Williams Energy Services Company as a
point-to-point transmission customer under the terms of IES's
transmission tariff.
IES requests an effective date of October 14, 1997, and
accordingly, seeks waiver of the Commission's notice requirements. A
copy of this filing has been served upon the Iowa Utilities Board.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
25. PECO Energy Company
[Docket No. ER98-348-000]
Take notice that on October 28, 1997, PECO Energy Company (PECO)
filed a summary of transactions made during the third quarter of
calendar year 1997 under PECO's Electric Tariff Original Volume No. 1,
accepted by the Commission in Docket No. ER95-770, as subsequently
amended and accepted by the Commission in Docket No. ER97-316.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
26. Central Power and Light Company, Public Service Company of
Oklahoma, Southwestern Electric Power Company, and West Texas
Utilities Company
[Docket No. ER98-349-000]
Take notice that on October 28, 1997, Central Power and Light
Company (CPL), Public Service Company of Oklahoma (PSO), Southwestern
Electric Power Company (SWEPCO), and West Texas Utilities Company (WTU)
(collectively, the Companies) tendered for filing eight Service
Agreements establishing Amoco Trading Corporation and Avista Energy,
Inc., as new customers under the terms of each Company's CSRT-1 Tariff.
The Companies also tendered for filing executed Service Agreements with
Electric Clearinghouse, Inc., and Entergy Power Marketing Corp., to be
substituted for the unexecuted agreements filed earlier.
The Companies request an effective date of October 1, 1997, for
each of the new service agreements and accordingly, seeks waiver of the
Commission's notice requirements. Copies of this filing were served on
the four customers, the Arkansas Public Service Commission, the
Louisiana Public Service Commission, the Oklahoma Corporation
Commission and the Public Utility Commission of Texas.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
27. Interstate Power Company
[Docket No. ER98-350-000]
Take notice that on October 28, 1997, Interstate Power Company
(IPW) tendered for filing two Transmission Service Agreements between
IPW and Dairyland Power Cooperative (Dairyland). Under the Transmission
Service Agreement, IPW will provide point-to-point transmission service
to Dairyland.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
28. Louisville Gas and Electric Company
[Docket No. ER98-351-000]
Take notice that on October 28, 1997, Louisville Gas and Electric
Company (LG&E) tendered for filing an unexecuted Firm Point-To-Point
Transmission Service Agreement between Louisville Gas and Electric
Company (LG&E) and itself under LG&E's Open Access Transmission Tariff.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
29. Orange and Rockland Utilities, Inc.
[Docket No. ER98-352-000]
Take notice that on October 28, 1997, Orange and Rockland
Utilities, Inc. (O&R) tendered for filing its Summary Report of O&R
transactions during the calendar quarter ending September 30, 1997,
pursuant to the market based rate power service tariff, made effective
by the Commission on March 27, 1997 in Docket No. ER97-1400-000.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
30. Orange and Rockland Utilities, Inc.
[Docket No. ER98-353-000]
Take notice that on October 28, 1997, Orange and Rockland
Utilities, Inc., acting on behalf of itself and its wholly owned
subsidiaries, Rockland Electric Company and Pike County Light & Power
Company, filed a revised Open Access Transmission Service Tariff which
incorporates changes to its Energy Imbalance Service.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
31. Public Service Electric and Gas Company
[Docket No. ER98-354-000]
Take notice that on October 29, 1997, Public Service Electric and
Gas Company (PSE&G), of Newark, New Jersey, tendered for filing an
agreement for the sale of capacity and energy to Aquila Power
Corporation (Aquila) pursuant to the PSE&G Wholesale Power Market Based
Sales Tariff, presently on file with the Commission.
PSE&G further requests waiver of the Commission's Regulations such
that the
[[Page 62045]]
agreement can be made effective as of September 30, 1997.
Copies of the filing have been served upon Aquila and the New
Jersey Board of Public Utilities.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
32. Public Service Electric and Gas Company
[Docket No. ER98-355-000]
Take notice that on October 29, 1997, Public Service Electric and
Gas Company (PSE&G), of Newark, New Jersey, tendered for filing an
agreement for the sale of capacity and energy to NorAm Energy Services,
Inc. (NorAm), pursuant to the PSE&G Wholesale Power Market Based Sales
Tariff, presently on file with the Commission.
PSE&G further requests waiver of the Commission's Regulations such
that the agreement can be made effective as of September 30, 1997.
Copies of the filing have been served upon NorAm and the New Jersey
Board of Public Utilities.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
33. Public Service Electric and Gas Company
[Docket No. ER98-356-000]
Take notice that on October 29, 1997, Public Service Electric and
Gas Company (PSE&G), of Newark, New Jersey, tendered for filing an
agreement for the sale of capacity and energy to Eastern Power
Distribution, Inc. (Eastern), pursuant to the PSE&G Wholesale Power
Market Based Sales Tariff, presently on file with the Commission.
PSE&G further requests waiver of the Commission's Regulations such
that the agreement can be made effective as of September 30, 1997.
Copies of the filing have been served upon Eastern and the New
Jersey Board of Public Utilities.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
34. Public Service Electric and Gas Company
[Docket No. ER98-357-000]
Take notice that on October 29, 1997, Public Service Electric and
Gas Company (PSE&G), of Newark, New Jersey, tendered for filing an
agreement for the sale of capacity and energy to New York Power
Authority (NYPA) pursuant to the PSE&G Wholesale Power Market Based
Sales Tariff, presently on file with the Commission.
PSE&G further requests waiver of the Commission's Regulations such
that the agreement can be made effective as of September 30, 1997.
Copies of the filing have been served upon NYPA and the New Jersey
Board of Public Utilities.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
35. Public Service Electric and Gas Company
[Docket No. ER98-358-000]
Take notice that on October 29, 1997, Public Service Electric and
Gas Company (PSE&G), of Newark, New Jersey, tendered for filing an
agreement for the sale of capacity and energy to DuPont Power Marketing
Inc. (DuPont), pursuant to the PSE&G Wholesale Power Market Based Sales
Tariff, presently on file with the Commission.
PSE&G further requests waiver of the Commission's Regulations such
that the agreement can be made effective as of September 30, 1997.
Copies of the filing have been served upon DuPont and the New
Jersey Board of Public Utilities.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
36. Jersey Central Power & Light Company, Edison Company, and
Pennsylvania Electric Company
[Docket No. ER98-359-000]
Take notice that on October 29, 1997, Jersey Central Power & Light
Company, Metropolitan Edison Company and Pennsylvania Electric Company
(d/b/a GPU Energy), filed an executed Service Agreement between GPU
Energy and Strategic Energy Ltd. (SEL), dated October 28, 1997. This
Service Agreement specifies that SEL has agreed to the rates, terms and
conditions of GPU Energy's Operating Capacity and/or Energy Sales
Tariff (Sales Tariff) designated as FERC Electric Tariff, Original
Volume No. 1. The Sales Tariff was accepted by the Commission by letter
order issued on February 10, 1995 in Jersey Central Power & Light Co.,
Metropolitan Edison Co. and Pennsylvania Electric Co., Docket No. ER95-
276-000 and allows GPU Energy and SEL to enter into separately
scheduled transactions under which GPU Energy will make available for
sale, surplus operating capacity and/or energy at negotiated rates that
are no higher than GPU Energy's cost of service.
GPU Energy requests a waiver of the Commission's notice
requirements for good cause shown and an effective date of October 28,
1997, for the Service Agreement.
GPU Energy has served copies of the filing on regulatory agencies
in New Jersey and Pennsylvania.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
37. Duquesne Light Company
[Docket No. ER98-360-000]
Take notice that on October 29, 1997, Duquesne Light Company (DLC)
filed a Service Agreement dated October 23, 1997, with Delmarva Power &
Light Co., under DLC's Open Access Transmission Tariff (Tariff). The
Service Agreement adds Delmarva Power & Light Co., as a customer under
the Tariff. DLC requests an effective date of October 23, 1997, for the
Service Agreement.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
38. Duke Power, a division of Duke Energy Corporation
[Docket No. ER98-361-000]
Take notice that on October 29, 1997, Duke Power (Duke), a division
of Duke Energy Corporation, tendered for filing Schedule MR quarterly
transaction summaries for service under Duke's FERC Electric Tariff,
Original Volume No. 3, for the quarter ended September 30, 1997.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
39. Southern California Edison Company
[Docket No. ER98-362-000]
Take notice that on October 29, 1997, Southern California Edison
Company (Edison), tendered for filing executed umbrella Service
Agreements (Service Agreements) with Morgan Stanley Capital Group Inc.,
and NP Energy Inc., for Point-To-Point Transmission Service under
Edison's Open Access Transmission Tariff (Tariff).
Edison filed the executed Service Agreements with the Commission in
compliance with applicable Commission regulations. Edison also
submitted revised Sheet Nos. 165 and 166 (Attachment E) to the Tariff,
which is an updated list of all current subscribers. Edison requests
waiver of the Commission's notice requirement to permit an effective
date of October 30, 1997, for Attachment E, and to allow the Service
Agreements to become effective according to their terms.
Copies of this filing were served upon the Public Utilities
Commission of the State of California and all interested parties.
[[Page 62046]]
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
40. Louisville Gas and Electric Company
[Docket No. ER98-363-000]
Take notice that on October 29, 1997, Louisville Gas and Electric
Company (LG&E), tendered for filing of its obligation to file the rates
and agreements for wholesale transactions made pursuant to its market-
based Generation Sales Service (GSS) Tariff.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
41. Louisville Gas and Electric Company
[Docket No. ER98-364-000]
Take notice that on October 29, 1997, Louisville Gas and Electric
Company (LG&E), tendered for filing an executed Non-Firm Point-To-Point
Transmission Service Agreement between LG&E and PP&L, Inc., under
LG&E's Open Access Transmission Tariff.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
42. New England Power Company
[Docket No. ER98-365-000]
Take notice that on October 29, 1997, New England Power Company
filed a Service Agreements and Certificates of Concurrence with
PacifiCorp Power Marketing, Inc., under NEP's FERC Electric Tariff,
Original Volumes No. 5 and 6.
Comment date: December 1, 1997, in accordance with Standard
Paragraph E at the end of this notice.
43. Wolverine Power Supply Cooperative, Inc.
[Docket No. ER98-493-000]
Take notice that Wolverine Power Supply Cooperative, Inc.
(Wolverine), on October 30, 1997, tendered for filing the Municipal/
Cooperative Coordinated Pool (MMCP) Agreement between the Michigan
Public Power Agency and Wolverine Power Supply Cooperative, Inc., dated
December 20, 1991. Wolverine will cease to be a borrower from the Rural
Utilities Service and become a public utility under the Federal Power
Act as of December 31, 1997.
Copies of this filing were served upon the Michigan Public Power
Agency and the Public Utility Commission of Michigan.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
44. Wolverine Power Supply Cooperative, Inc.
[Docket No. ER98-494-000]
Take notice that Wolverine Power Supply Cooperative, Inc.,
(Wolverine), On October 30, 1997, tendered for filing the two existing
agreements: (1) Lansing Board of Water and Light and (2) Traverse City
Light and Power Board Maintenance and Operating Agreement, dated
February 28, 1979. Wolverine does not propose any changes to these
contracts. Wolverine will cease to be a borrower from the Rural
Utilities Service and become a public utility under the Federal Power
Act as of January 1, 1998.
Copies of this filing were served upon the Lansing board of Water
and Light, the Traverse City Light and Power Board, and the Public
Utility commission of Michigan.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
45. GPU Advanced Resources, Inc.
[Docket No. ER98-500-000]
Take notice that GPU Advanced Resources, Inc., on October 30, 1997,
tendered for filing proposed changes in its Rate Schedule FERC No. 1.
The proposed changes would allow GPU Advanced Resources, Inc., to
sell electric energy at wholesale to certain affiliated public
utilities for the limited purpose of reconciling energy deliveries to
such public utilities with energy usage by certain retail customers of
GPU Advanced Resources, Inc.
Copies of the filing were served upon the affiliated public
utilities to which such wholesale sales will be made and upon the
Pennsylvania Public Utilities Commission.
Comment date: November 28, 1997, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 97-30504 Filed 11-19-97; 8:45 am]
BILLING CODE 6717-01-P