97-30504. Electric Rate and Corporate Regulation Filings; Entergy Power Generation Corporation, et al.  

  • [Federal Register Volume 62, Number 224 (Thursday, November 20, 1997)]
    [Notices]
    [Pages 62041-62046]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-30504]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EG97-85-000, et al.]
    
    
    Electric Rate and Corporate Regulation Filings; Entergy Power 
    Generation Corporation, et al.
    
    November 14, 1997.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Entergy Power Generation Corporation
    
    [Docket No. EG97-85-000]
    
        On November 10, 1997, Entergy Power Generation Corporation filed 
    with the Federal Energy Regulatory Commission a supplement to its 
    September 26, 1997, application for determination of exempt wholesale 
    generator status pursuant to Part 365 of the Commission's Regulations. 
    The supplemental material included clarification sought by the 
    Commission Staff.
        Comment date: November 24, 1997, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. De Pe Energy L.L.C.
    
    [Docket No. EG98-4-000]
    
        On October 24, 1997, De Pere Energy L.L.C. (De Pere), filed with 
    the Federal Energy Regulatory Commission an application for 
    determination of exempt wholesale generator status pursuant to Part 365 
    of the Commission's Regulations.
        De Pere is developing a gas-fired eligible facility with an initial 
    capacity of approximately 180 megawatts (net) operating as a simple-
    cycle combustion turbine, and later as an approximate 255 megawatt 
    (net) combined-cycle cogeneration plant producing both electricity and 
    steam, to be located in the City of De Pere, Brown County, Wisconsin.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    3. Enfield Energy Centre Limited
    
    [Docket No. EG98-8-000]
    
        Take notice that on November 10, 1997, Enfield Energy Centre 
    Limited, a limited liability company incorporated and existing under 
    the laws of the England and Wales, having its registered office at Cam 
    Lea Offices, 975 Mollison Avenue, Enfield, Middlesex, EN3 7NN, England 
    (the Applicant), filed with the Federal Energy Regulatory Commission an 
    application for determination of exempt wholesale generator (EWG) 
    status pursuant to Part 365 of the Commission's Regulations.
        Applicant states that it will be engaged directly in owning an 
    eligible facility, the Enfield Energy power plant located in the 
    Borough of Enfield, North London, England (the Plant). The Plant will 
    consist of a 396 MW combined cycle power plant, fueled by natural gas 
    with gas oil as backup fuel.
        Comment date: December 5, 1997, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    [[Page 62042]]
    
    4. Kentucky Utilities Company
    
    [Docket No. ER97-3378-000]
    
        Take notice that on November 6, 1997, Kentucky Utilities Company 
    (KU), tendered for filing an Amendment to the five (5) Supplements to 
    FERC Rate Schedule 203, the Interconnection Agreement between KU and 
    East Kentucky Power Cooperative.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER97-4006-000]
    
        Take notice that on November 3, 1997, Consolidated Edison Company 
    of New York, Inc., tendered for filing a summary of the electric 
    exchanges, electric capacity, and electric other energy trading 
    activities under its FERC Electric Tariff Rate Schedule No. 2, for the 
    quarter ending June 30, 1997.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Denver City Energy Associates, L.P.
    
    [Docket No. ER97-4084-001]
    
        Take notice that on November 3, 1997, Denver City Energy 
    Associates, L.P. (DCE), tendered for filing a Code of Conduct in 
    compliance with the Federal Energy Regulatory Commission (the 
    Commission) Order on Proposed Market-Based Rates of GS Electric 
    Generating Cooperative, Inc., and DCE issued October 17, 1997 in Docket 
    Nos. ER97-3583-000 and ER97-4084-000.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Cargill-IEC, L.L.C.
    
    [Docket No. ER97-4273-001]
    
        Take notice that on October 31, 1997, Cargill-IEC, L.L.C. (Cargill-
    IEC), tendered for filing, pursuant to the Commission's October 17, 
    1997, Order Conditionally Accepting Proposed Market-Based Rates, a 
    Compliance Filing including a revised Statement of Policy and Standards 
    of Conduct governing the relationship between the IEC Companies and 
    their affiliated wholesale power marketer, Cargill-IEC.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. GENSYS Energy
    
    [Docket No. ER97-4335-001]
    
        On November 3, 1997, GENSYS Energy made its compliance 
    filing as required under Ordering Paragraph (A) of the Commission's 
    Order issued in this proceeding on October 17, 1997.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Idaho County Light & Power Cooperative Association, Inc.
    
    [Docket No. ER97-4435-001]
    
        Take notice that on November 4, 1997, Idaho County Light & Power 
    Cooperative Association, Inc. (Idaho County), advised the Commission 
    that it retired its debt from the Rural Utilities Service on October 
    21, 1997.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Wisconsin Power and Light Company
    
    [Docket No. ER97-4815-000]
    
        Take notice that on November 3, 1997, Wisconsin Power and Light 
    Company (WP&L), tendered for filing a request to withdraw its filing in 
    Docket No. ER97-4815-000.
        WP&L requests waiver of the Commission's notice requirements to 
    permit the requested action. A copy of this filing has been served upon 
    the Public Service Commission of Wisconsin.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Detroit Edison Company
    
    [Docket No. ER98-205-000]
    
        Take notice that on October 15, 1997, the Detroit Edison Company 
    (Detroit Edison) filed a revised Service Agreement in the above-
    referenced docket. Detroit Edison requests that the revised Service 
    Agreement be made effective as of November 1, 1997.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. PP&L, Inc.
    
    [Docket No. ER98-292-000]
    
        Take notice that on October 27, 1997, PP&L, Inc., (formerly known 
    as Pennsylvania Power & Light Company) (PP&L), filed a Service 
    Agreement dated October 3, 1997, with Northern Indiana Public Service 
    Co. (NIPSC) under PP&L's FERC Electric Tariff, Original Volume No. 5. 
    The Service Agreement adds NIPSC as an eligible customer under the 
    tariff.
        PP&L requests an effective date of October 27, 1997, for the 
    Service Agreement.
        PP&L states that copies of this filing have been supplied to NIPSC 
    and to the Pennsylvania Public Utility Commission.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. PECO Energy Company
    
    [Docket No. ER98-293-000]
    
        Take notice that on October 27, 1997, PECO Energy Company (PECO) 
    filed an executed Installed Capacity Obligation Allocation Agreement 
    between PECO and Woodruff Oil Company d/b/a Woodruff Energy 
    (hereinafter Supplier). The terms and conditions contained within this 
    Agreement are identical to the terms and conditions contained with the 
    Form of Installed Capacity Allocation Agreement filed by PECO with the 
    Commission on October 3, 1997, at Docket No. ER98-28-000. This filing 
    merely submits an individual executed copy of the Installed Capacity 
    Obligation Allocation Agreement between PECO and an alternate supplier 
    participating in PECO's Pilot.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. PECO Energy Company
    
    [Docket No. ER98-294-000]
    
        Take notice that on October 27, 1997, PECO Energy Company (PECO) 
    filed an executed Transmission Agency Agreement between PECO and 
    Woodruff Oil Company d/b/a Woodruff Energy (hereinafter Supplier). The 
    terms and conditions contained within this Agreement are identical to 
    the terms and conditions contained with the Form of Transmission Agency 
    Agreement submitted to the Commission on October 3, 1997, as part of 
    the joint filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PECO and an alternative supplier participating in 
    PECO's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. PECO Energy Company
    
    [Docket No. ER98-295-000]
    
        Take notice that on October 27, 1997, PECO Energy Company (PECO) 
    filed an executed Transmission Agency Agreement between PECO and QST 
    Energy Inc., (hereinafter Supplier). The terms and conditions contained 
    within
    
    [[Page 62043]]
    
    this Agreement are identical to the terms and conditions contained with 
    the Form of Transmission Agency Agreement submitted to the Commission 
    on October 3, 1997, as part of the joint filing by the Pennsylvania 
    Public Utility Commission and the Pennsylvania PJM Utilities at Docket 
    No. ER98-64-000. This filing merely submits an individual executed copy 
    of the Transmission Agency Agreement between PECO and an alternative 
    supplier participating in PECO's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. PECO Energy Company
    
    [Docket No. ER98-296-000]
    
        Take notice that on October 27, 1997, PECO Energy Company (PECO), 
    filed an executed Transmission Agency Agreement between PECO and UGI 
    Power Supply Inc., (hereinafter Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PECO and an alternative supplier participating in 
    PECO's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. PECO Energy Company
    
    [Docket No. ER98-297-000]
    
        Take notice that on October 27, 1997, PECO Energy Company (PECO) 
    filed an executed Transmission Agency Agreement between PECO and Duke 
    Trading and Marketing L.L.C., (hereinafter Supplier). The terms and 
    conditions contained within this Agreement are identical to the terms 
    and conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PECO and an alternative supplier participating in 
    PECO's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. PECO Energy Company
    
    [Docket No. ER98-298-000]
    
        Take notice that on October 27, 1997, PECO Energy Company (PECO) 
    filed an executed Installed Capacity Obligation Allocation Agreement 
    between PECO and NorAm Energy Management Inc., (hereinafter Supplier). 
    The terms and conditions contained within this Agreement are identical 
    to the terms and conditions contained with the ``Form of Installed 
    Capacity Allocation Agreement'' filed by PECO with the Commission on 
    October 3, 1997, at Docket No. ER98-28-000. This filing merely submits 
    an individual executed copy of the Installed Capacity Obligation 
    Allocation Agreement between PECO and an alternate supplier 
    participating in PECO's Pilot.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. PECO Energy Company
    
    [Docket No. ER98-299-000]
    
        Take notice that on October 27, 1997, PECO Energy Company (PECO) 
    filed an executed Installed Capacity Obligation Allocation Agreement 
    between PECO and QST Energy Inc., (hereinafter Supplier). The terms and 
    conditions contained within this Agreement are identical to the terms 
    and conditions contained with the Form of Installed Capacity Allocation 
    Agreement filed by PECO with the Commission on October 3, 1997, at 
    Docket No. ER98-28-000. This filing merely submits an individual 
    executed copy of the Installed Capacity Obligation Allocation Agreement 
    between PECO and an alternate supplier participating in PECO's Pilot.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. PECO Energy Company
    
    [Docket No. ER98-300-000]
    
        Take notice that on October 27, 1997, PECO Energy Company (PECO) 
    filed an executed Installed Capacity Obligation Allocation Agreement 
    between PECO and West Penn Power Company dba Allegheny Power 
    (hereinafter Supplier). The terms and conditions contained within this 
    Agreement are identical to the terms and conditions contained with the 
    Form of Installed Capacity Allocation Agreement filed by PECO with the 
    Commission on October 3, 1997, at Docket No. ER98-28-000. This filing 
    merely submits an individual executed copy of the Installed Capacity 
    Obligation Allocation Agreement between PECO and an alternate supplier 
    participating in PECO's Pilot.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. PECO Energy Company
    
    [Docket No. ER98-301-000]
    
        Take notice that on October 27, 1997, PECO Energy Company (PECO) 
    filed an executed Transmission Agency Agreement between PECO and 
    Pennsylvania Power & Light Co., (hereinafter Supplier). The terms and 
    conditions contained within this Agreement are identical to the terms 
    and conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PECO and an alternative supplier participating in 
    PECO's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    22. PECO Energy Company
    
    [Docket No. ER98-302-000]
    
        Take notice that on October 27, 1997, PECO Energy Company (PECO) 
    filed an executed Transmission Agency Agreement between PECO and 
    Energis Resources Inc.,(hereinafter Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000.
    
    [[Page 62044]]
    
    This filing merely submits an individual executed copy of the 
    Transmission Agency Agreement between PECO and an alternative supplier 
    participating in PECO's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    23. Jersey Central Power & Light Company, Metropolitan Edison 
    Company, and Pennsylvania Electric Company
    
    [Docket No. ER98-344-000]
    
        Take notice that on October 28, 1997, Jersey Central Power & Light 
    Company, Metropolitan Edison Company and Pennsylvania Electric Company 
    (d/b/a GPU Energy), filed an executed Service Agreement between GPU 
    Energy and Energis Resources Incorporated (ENR), dated October 22, 
    1997. This Service Agreement specifies that ENR has agreed to the 
    rates, terms and conditions of GPU Energy's Operating Capacity and/or 
    Energy Sales Tariff (Sales Tariff) designated as FERC Electric Tariff, 
    Original Volume No. 1. The Sales Tariff was accepted by the Commission 
    by letter order issued on February 10, 1995 in Jersey Central Power & 
    Light Co., Metropolitan Edison Co., and Pennsylvania Electric Co., 
    Docket No. ER95-276-000 and allows GPU Energy and ENR to enter into 
    separately scheduled transactions under which GPU Energy will make 
    available for sale, surplus operating capacity and/or energy at 
    negotiated rates that are no higher than GPU Energy's cost of service.
        GPU Energy requests a waiver of the Commission's notice 
    requirements for good cause shown and an effective date of October 22, 
    1997, for the Service Agreement.
        GPU Energy has served copies of the filing on regulatory agencies 
    in New Jersey and Pennsylvania.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    24. IES Utilities Inc.
    
    [Docket No. ER98-346-000]
    
        Take notice that on October 28, 1997, IES Utilities Inc. (IES), 
    tendered for filing Form of Service Agreement for Firm Point-to-Point 
    Transmission Service establishing Williams Energy Services Company as a 
    point-to-point transmission customer under the terms of IES's 
    transmission tariff.
        IES requests an effective date of October 14, 1997, and 
    accordingly, seeks waiver of the Commission's notice requirements. A 
    copy of this filing has been served upon the Iowa Utilities Board.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    25. PECO Energy Company
    
    [Docket No. ER98-348-000]
    
        Take notice that on October 28, 1997, PECO Energy Company (PECO) 
    filed a summary of transactions made during the third quarter of 
    calendar year 1997 under PECO's Electric Tariff Original Volume No. 1, 
    accepted by the Commission in Docket No. ER95-770, as subsequently 
    amended and accepted by the Commission in Docket No. ER97-316.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    26. Central Power and Light Company, Public Service Company of 
    Oklahoma, Southwestern Electric Power Company, and West Texas 
    Utilities Company
    
    [Docket No. ER98-349-000]
    
        Take notice that on October 28, 1997, Central Power and Light 
    Company (CPL), Public Service Company of Oklahoma (PSO), Southwestern 
    Electric Power Company (SWEPCO), and West Texas Utilities Company (WTU) 
    (collectively, the Companies) tendered for filing eight Service 
    Agreements establishing Amoco Trading Corporation and Avista Energy, 
    Inc., as new customers under the terms of each Company's CSRT-1 Tariff. 
    The Companies also tendered for filing executed Service Agreements with 
    Electric Clearinghouse, Inc., and Entergy Power Marketing Corp., to be 
    substituted for the unexecuted agreements filed earlier.
        The Companies request an effective date of October 1, 1997, for 
    each of the new service agreements and accordingly, seeks waiver of the 
    Commission's notice requirements. Copies of this filing were served on 
    the four customers, the Arkansas Public Service Commission, the 
    Louisiana Public Service Commission, the Oklahoma Corporation 
    Commission and the Public Utility Commission of Texas.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    27. Interstate Power Company
    
    [Docket No. ER98-350-000]
    
        Take notice that on October 28, 1997, Interstate Power Company 
    (IPW) tendered for filing two Transmission Service Agreements between 
    IPW and Dairyland Power Cooperative (Dairyland). Under the Transmission 
    Service Agreement, IPW will provide point-to-point transmission service 
    to Dairyland.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    28. Louisville Gas and Electric Company
    
    [Docket No. ER98-351-000]
    
        Take notice that on October 28, 1997, Louisville Gas and Electric 
    Company (LG&E) tendered for filing an unexecuted Firm Point-To-Point 
    Transmission Service Agreement between Louisville Gas and Electric 
    Company (LG&E) and itself under LG&E's Open Access Transmission Tariff.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    29. Orange and Rockland Utilities, Inc.
    
    [Docket No. ER98-352-000]
    
        Take notice that on October 28, 1997, Orange and Rockland 
    Utilities, Inc. (O&R) tendered for filing its Summary Report of O&R 
    transactions during the calendar quarter ending September 30, 1997, 
    pursuant to the market based rate power service tariff, made effective 
    by the Commission on March 27, 1997 in Docket No. ER97-1400-000.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    30. Orange and Rockland Utilities, Inc.
    
    [Docket No. ER98-353-000]
    
        Take notice that on October 28, 1997, Orange and Rockland 
    Utilities, Inc., acting on behalf of itself and its wholly owned 
    subsidiaries, Rockland Electric Company and Pike County Light & Power 
    Company, filed a revised Open Access Transmission Service Tariff which 
    incorporates changes to its Energy Imbalance Service.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    31. Public Service Electric and Gas Company
    
    [Docket No. ER98-354-000]
    
        Take notice that on October 29, 1997, Public Service Electric and 
    Gas Company (PSE&G), of Newark, New Jersey, tendered for filing an 
    agreement for the sale of capacity and energy to Aquila Power 
    Corporation (Aquila) pursuant to the PSE&G Wholesale Power Market Based 
    Sales Tariff, presently on file with the Commission.
        PSE&G further requests waiver of the Commission's Regulations such 
    that the
    
    [[Page 62045]]
    
    agreement can be made effective as of September 30, 1997.
        Copies of the filing have been served upon Aquila and the New 
    Jersey Board of Public Utilities.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    32. Public Service Electric and Gas Company
    
    [Docket No. ER98-355-000]
    
        Take notice that on October 29, 1997, Public Service Electric and 
    Gas Company (PSE&G), of Newark, New Jersey, tendered for filing an 
    agreement for the sale of capacity and energy to NorAm Energy Services, 
    Inc. (NorAm), pursuant to the PSE&G Wholesale Power Market Based Sales 
    Tariff, presently on file with the Commission.
        PSE&G further requests waiver of the Commission's Regulations such 
    that the agreement can be made effective as of September 30, 1997.
        Copies of the filing have been served upon NorAm and the New Jersey 
    Board of Public Utilities.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    33. Public Service Electric and Gas Company
    
    [Docket No. ER98-356-000]
    
        Take notice that on October 29, 1997, Public Service Electric and 
    Gas Company (PSE&G), of Newark, New Jersey, tendered for filing an 
    agreement for the sale of capacity and energy to Eastern Power 
    Distribution, Inc. (Eastern), pursuant to the PSE&G Wholesale Power 
    Market Based Sales Tariff, presently on file with the Commission.
        PSE&G further requests waiver of the Commission's Regulations such 
    that the agreement can be made effective as of September 30, 1997.
        Copies of the filing have been served upon Eastern and the New 
    Jersey Board of Public Utilities.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    34. Public Service Electric and Gas Company
    
    [Docket No. ER98-357-000]
    
        Take notice that on October 29, 1997, Public Service Electric and 
    Gas Company (PSE&G), of Newark, New Jersey, tendered for filing an 
    agreement for the sale of capacity and energy to New York Power 
    Authority (NYPA) pursuant to the PSE&G Wholesale Power Market Based 
    Sales Tariff, presently on file with the Commission.
        PSE&G further requests waiver of the Commission's Regulations such 
    that the agreement can be made effective as of September 30, 1997.
        Copies of the filing have been served upon NYPA and the New Jersey 
    Board of Public Utilities.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    35. Public Service Electric and Gas Company
    
    [Docket No. ER98-358-000]
    
        Take notice that on October 29, 1997, Public Service Electric and 
    Gas Company (PSE&G), of Newark, New Jersey, tendered for filing an 
    agreement for the sale of capacity and energy to DuPont Power Marketing 
    Inc. (DuPont), pursuant to the PSE&G Wholesale Power Market Based Sales 
    Tariff, presently on file with the Commission.
        PSE&G further requests waiver of the Commission's Regulations such 
    that the agreement can be made effective as of September 30, 1997.
        Copies of the filing have been served upon DuPont and the New 
    Jersey Board of Public Utilities.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    36. Jersey Central Power & Light Company, Edison Company, and 
    Pennsylvania Electric Company
    
    [Docket No. ER98-359-000]
    
        Take notice that on October 29, 1997, Jersey Central Power & Light 
    Company, Metropolitan Edison Company and Pennsylvania Electric Company 
    (d/b/a GPU Energy), filed an executed Service Agreement between GPU 
    Energy and Strategic Energy Ltd. (SEL), dated October 28, 1997. This 
    Service Agreement specifies that SEL has agreed to the rates, terms and 
    conditions of GPU Energy's Operating Capacity and/or Energy Sales 
    Tariff (Sales Tariff) designated as FERC Electric Tariff, Original 
    Volume No. 1. The Sales Tariff was accepted by the Commission by letter 
    order issued on February 10, 1995 in Jersey Central Power & Light Co., 
    Metropolitan Edison Co. and Pennsylvania Electric Co., Docket No. ER95-
    276-000 and allows GPU Energy and SEL to enter into separately 
    scheduled transactions under which GPU Energy will make available for 
    sale, surplus operating capacity and/or energy at negotiated rates that 
    are no higher than GPU Energy's cost of service.
        GPU Energy requests a waiver of the Commission's notice 
    requirements for good cause shown and an effective date of October 28, 
    1997, for the Service Agreement.
        GPU Energy has served copies of the filing on regulatory agencies 
    in New Jersey and Pennsylvania.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    37. Duquesne Light Company
    
    [Docket No. ER98-360-000]
    
        Take notice that on October 29, 1997, Duquesne Light Company (DLC) 
    filed a Service Agreement dated October 23, 1997, with Delmarva Power & 
    Light Co., under DLC's Open Access Transmission Tariff (Tariff). The 
    Service Agreement adds Delmarva Power & Light Co., as a customer under 
    the Tariff. DLC requests an effective date of October 23, 1997, for the 
    Service Agreement.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    38. Duke Power, a division of Duke Energy Corporation
    
    [Docket No. ER98-361-000]
    
        Take notice that on October 29, 1997, Duke Power (Duke), a division 
    of Duke Energy Corporation, tendered for filing Schedule MR quarterly 
    transaction summaries for service under Duke's FERC Electric Tariff, 
    Original Volume No. 3, for the quarter ended September 30, 1997.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    39. Southern California Edison Company
    
    [Docket No. ER98-362-000]
    
        Take notice that on October 29, 1997, Southern California Edison 
    Company (Edison), tendered for filing executed umbrella Service 
    Agreements (Service Agreements) with Morgan Stanley Capital Group Inc., 
    and NP Energy Inc., for Point-To-Point Transmission Service under 
    Edison's Open Access Transmission Tariff (Tariff).
        Edison filed the executed Service Agreements with the Commission in 
    compliance with applicable Commission regulations. Edison also 
    submitted revised Sheet Nos. 165 and 166 (Attachment E) to the Tariff, 
    which is an updated list of all current subscribers. Edison requests 
    waiver of the Commission's notice requirement to permit an effective 
    date of October 30, 1997, for Attachment E, and to allow the Service 
    Agreements to become effective according to their terms.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
    
    [[Page 62046]]
    
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    40. Louisville Gas and Electric Company
    
    [Docket No. ER98-363-000]
    
        Take notice that on October 29, 1997, Louisville Gas and Electric 
    Company (LG&E), tendered for filing of its obligation to file the rates 
    and agreements for wholesale transactions made pursuant to its market-
    based Generation Sales Service (GSS) Tariff.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    41. Louisville Gas and Electric Company
    
    [Docket No. ER98-364-000]
    
        Take notice that on October 29, 1997, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Non-Firm Point-To-Point 
    Transmission Service Agreement between LG&E and PP&L, Inc., under 
    LG&E's Open Access Transmission Tariff.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    42. New England Power Company
    
    [Docket No. ER98-365-000]
    
        Take notice that on October 29, 1997, New England Power Company 
    filed a Service Agreements and Certificates of Concurrence with 
    PacifiCorp Power Marketing, Inc., under NEP's FERC Electric Tariff, 
    Original Volumes No. 5 and 6.
        Comment date: December 1, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    43. Wolverine Power Supply Cooperative, Inc.
    
    [Docket No. ER98-493-000]
    
        Take notice that Wolverine Power Supply Cooperative, Inc. 
    (Wolverine), on October 30, 1997, tendered for filing the Municipal/
    Cooperative Coordinated Pool (MMCP) Agreement between the Michigan 
    Public Power Agency and Wolverine Power Supply Cooperative, Inc., dated 
    December 20, 1991. Wolverine will cease to be a borrower from the Rural 
    Utilities Service and become a public utility under the Federal Power 
    Act as of December 31, 1997.
        Copies of this filing were served upon the Michigan Public Power 
    Agency and the Public Utility Commission of Michigan.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    44. Wolverine Power Supply Cooperative, Inc.
    
    [Docket No. ER98-494-000]
    
        Take notice that Wolverine Power Supply Cooperative, Inc., 
    (Wolverine), On October 30, 1997, tendered for filing the two existing 
    agreements: (1) Lansing Board of Water and Light and (2) Traverse City 
    Light and Power Board Maintenance and Operating Agreement, dated 
    February 28, 1979. Wolverine does not propose any changes to these 
    contracts. Wolverine will cease to be a borrower from the Rural 
    Utilities Service and become a public utility under the Federal Power 
    Act as of January 1, 1998.
        Copies of this filing were served upon the Lansing board of Water 
    and Light, the Traverse City Light and Power Board, and the Public 
    Utility commission of Michigan.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    45. GPU Advanced Resources, Inc.
    
    [Docket No. ER98-500-000]
    
        Take notice that GPU Advanced Resources, Inc., on October 30, 1997, 
    tendered for filing proposed changes in its Rate Schedule FERC No. 1.
        The proposed changes would allow GPU Advanced Resources, Inc., to 
    sell electric energy at wholesale to certain affiliated public 
    utilities for the limited purpose of reconciling energy deliveries to 
    such public utilities with energy usage by certain retail customers of 
    GPU Advanced Resources, Inc.
        Copies of the filing were served upon the affiliated public 
    utilities to which such wholesale sales will be made and upon the 
    Pennsylvania Public Utilities Commission.
        Comment date: November 28, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-30504 Filed 11-19-97; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
11/20/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-30504
Dates:
November 24, 1997, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
62041-62046 (6 pages)
Docket Numbers:
Docket No. EG97-85-000, et al.
PDF File:
97-30504.pdf