2017-25081. Town of Camden, Maine; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
-
Start Preamble
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:
a. Type of Proceeding: Application for surrender of exemption.
b. Project No.: 8640-001.
c. Date Filed: July 6, 2017, and supplemented on November 8, 2017.
d. Exemptee: Town of Camden, Maine.
e. Name of Project: Seabright Dam Project No. 8640.
f. Location: The project is located on the Megunticook River in Camden, Maine.
g. Filed Pursuant to: 18 CFR 4.102.
h. Exemptee Contact: David B. Bolstridge, Town of Camden, Chief Dam Safety Engineer, P.O. Box 1207, Camden, ME 04843.
i. FERC Contact: Ms. Marybeth Gay, (202) 502-6125, Marybeth.gay@ferc.gov.
j. Deadline for filing comments, interventions, protests, and recommendations is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests and comments using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P-8640-001) on any comments, motions to intervene, protests, or recommendations filed.
k. Description of Request: The Town of Camden, Maine (exemptee) proposes to surrender the exemption for the Seabright Dam Project No. 8640. The exemptee states that the generation of power at the project is no longer economical. The exemptee proposes to remove the project's three transformers that feed power from the dam to the Central Maine Power Company grid in order to ensure power generation is permanently disconnected. The exemptee proposes to continue to maintain and operate the dam for recreational use of the reservoir, public safety, and environmental compliance, and would continue to follow its Commission-approved Public Safety Plan and its Maine Department of Environmental Protection Water Permit.
l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at http://www.ferc.gov/docs-filing/efiling.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208- 3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .212 and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate the temporary variance that is the subject of this notice. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Start SignatureStart Printed Page 55098End Signature End PreambleDated: November 13, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-25081 Filed 11-17-17; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 11/20/2017
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2017-25081
- Pages:
- 55097-55098 (2 pages)
- Docket Numbers:
- Project No. 8640-001
- PDF File:
- 2017-25081.pdf