97-30687. Drawbridge Operation Regulations; Oakland Inner Harbor Tidal Canal, CA  

  • [Federal Register Volume 62, Number 225 (Friday, November 21, 1997)]
    [Rules and Regulations]
    [Page 62262]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-30687]
    
    
    
    [[Page 62262]]
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Coast Guard
    
    33 CFR Part 117
    
    [CGD11-97-009]
    
    
    Drawbridge Operation Regulations; Oakland Inner Harbor Tidal 
    Canal, CA
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Notice of deviation from regulations.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Notice is hereby given that the Coast Guard has issued a 
    temporary deviation to the regulations governing the opening of the 
    Fruitvale Railroad Vertical Lift Bridge over the Oakland Inner Harbor 
    Tidal Canal. The deviation allows Alameda County, on behalf of the U.S. 
    Army Corps of Engineers, to provide an opening on 30 minutes advance 
    notice between sunrise and sunset from December 1 through December 20, 
    1997. At all other times, the bridge will continue to operate under its 
    published regulations. The purpose of this deviation is to allow the 
    Corps of Engineers to perform an electromagnetic test for adequacy of 
    the bridge's 32 haul ropes.
    
    DATES: The effective period of the deviation begins on Monday, December 
    1, 1997 and continues through Saturday, December 20, 1997.
    
    FOR FURTHER INFORMATION CONTACT:
    Mr. Jerry P. Olmes, Bridge Administrator, Eleventh Coast Guard 
    District, Building 50-6 Coast Guard Island, Alameda, CA, at (510) 437-
    3514.
    
    SUPPLEMENTARY INFORMATION: The Coast Guard anticipates that the 
    economic consequences of this deviation will be minimal. Mariners can 
    avoid experiencing any adverse consequences throughout the effective 
    period by either providing the bridge operator 30 minutes advance 
    notice between sunrise and sunset or transiting at other times. 
    Moreover, the Coast Guard expects the bridge to resume its normal 
    operating schedule before the end of the effective period if the Corps 
    of Engineers completes its tests in less than 20 days.
        This deviation from the normal operating regulations in 33 CFR 
    117.181 is authorized in accordance with the provisions of 33 CFR 
    117.35.
    
        Dated: November 6, 1997.
    J.C. Card,
    Vice Admiral, U.S. Coast Guard, Commander, Eleventh Coast Guard 
    District.
    [FR Doc. 97-30687 Filed 11-20-97; 8:45 am]
    BILLING CODE 4910-14-M
    
    
    

Document Information

Effective Date:
12/1/1997
Published:
11/21/1997
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of deviation from regulations.
Document Number:
97-30687
Dates:
The effective period of the deviation begins on Monday, December 1, 1997 and continues through Saturday, December 20, 1997.
Pages:
62262-62262 (1 pages)
Docket Numbers:
CGD11-97-009
PDF File:
97-30687.pdf
CFR: (1)
33 CFR 117