96-29855. ANR Pipeline Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 61, Number 227 (Friday, November 22, 1996)]
[Notices]
[Pages 59426-59427]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-29855]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP97-87-000]
ANR Pipeline Company; Notice of Request Under Blanket
Authorization
November 18, 1996.
Take notice that on November 7, 1996, ANR Pipeline Company (ANR),
500 Renaissance Center, Detroit, Michigan 48243, filed a prior notice
request with the Commission in Docket No. CP97-87-000 pursuant to
Section 157.205 of the Commission's Regulations under the Natural Gas
Act (NGA) for authorization to construct and operate a 2-inch turbine
meter at its Donnellson meter station and to abandon its Cal Spray
meter station, both in Lee County, Iowa, under ANR's blanket
certificate issued in Docket No. CP82-480-000 pursuant to Section 7 of
the NGA, all as more fully set forth in the request which is open to
the public for inspection.
ANR proposes to construct a 2-inch turbine meter at the Donnellson
meter
[[Page 59427]]
station in Lee County and to operate the facility under Section 7 of
the NGA. ANR states that the proposed turbine meter at the Donnellson
meter station would enable ANR to accommodate greater winter flow rates
than the existing 2-inch positive displacement meter can currently
handle. ANR delivers natural gas to MidAmerican Energy Company
(MidAmerican) at this meter station. ANR further states that the
proposed annual quantities of natural gas that would be delivered at
the Donnellson meter station would not affect the installation of the
proposed 2-inch turbine meter. ANR estimates that it would cost $28,200
to construct the proposed 2-inch turbine meter.
ANR also proposes to abandon its Cal Spray meter station \1\
(located on the Donnellson meter station site) which consists of two 6-
inch orifice meters. ANR states that it no longer needs these
facilities, because MidAmerican no longer serves Chevron Chemical
Company's (Chevron) anhydrous ammonia plant at this location. Following
Chevron's closing of the anhydrous ammonia plant, MidAmerican
eliminated its tie-in with ANR at the Cal Spray meter station.
---------------------------------------------------------------------------
\1\ 24 FPC 177 (1960).
---------------------------------------------------------------------------
Any person or the Commission's staff may, within 45 days after the
Commission has issued this notice, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursuant to Section 157.205 of the
Regulations under the NGA (18 CFR 157.205) a protest to the request. If
no protest is filed within the allowed time, the proposed activity
shall be deemed to be authorized effective the day after the time
allowed for filing a protest. If a protest is filed and not withdrawn
within 30 days after the time allowed for filing a protest, the instant
request shall be treated as an application for authorization pursuant
to Section 7 of the NGA.
Lois D. Cashell,
Secretary.
[FR Doc. 96-29855 Filed 11-21-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 11/22/1996
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 96-29855
- Pages:
- 59426-59427 (2 pages)
- Docket Numbers:
- Docket No. CP97-87-000
- PDF File:
-
96-29855.pdf