96-29917. Environmental Impact Statements; Notice of Availability  

  • [Federal Register Volume 61, Number 227 (Friday, November 22, 1996)]
    [Notices]
    [Pages 59435-59436]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-29917]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-5475-1]
    
    
    Environmental Impact Statements; Notice of Availability
    
        Responsible Agency: Office of Federal Activities, General 
    Information (202) 564-7167 or (202) 564-7153.
        Weekly receipt of Environmental Impact Statements Filed November 
    11, 1996 Through November 15, 1996 Pursuant to 40 CFR 1506.9.
    
    EIS No. 960532, FINAL EIS, FHW, PA, Erie East Side Access Study, 
    Transportation Improvement, PA-4034, Section A40, COE Section 404 
    Permit, Erie County, PA, Due: December 23, 1996, Contact: Manuel A. 
    Mark (717) 782-3461.
    EIS No. 960533, FINAL SUPPLEMENT, FHW, TX, TX-161 Construction, Updated 
    Information on I-20 to TX-183, Funding, Coast Guard Section 10 Permit 
    and Possible COE Section 404 Permit, Cities of Grand Prairie and 
    Irving, Dallas County, TX, Due: December 23, 1996, Contact: Peter A. 
    Lombard (817) 978-3646.
    EIS No. 960534, FINAL EIS, NPS, WA, Elwha River Ecosystem Restoration 
    Implemention Project, Olympic National Park, Clallam County, WA, Due: 
    December 23, 1996, Contact: Brian Winter (360) 452-0302.
    EIS No. 960535, FINAL EIS, FRC, WA, Condit Hydroelectric Project (FERC 
    No. 2342-005), Relicensing, White Salmon River, Klickitat and Skamania 
    Counties, WA, Due: December 23, 1996, Contact: John Blair (202) 219-
    2845.
    EIS No. 960536, DRAFT EIS, FTA, MD, Glen Burnie Light Rail Extension, 
    Transportation Improvement, between Cromwell Station Stop to the Glen 
    Burnie Town Center, Central Light Rail Line (CLRL), Funding, Anne 
    Arundel and Baltimore Counties, MD, Due: January 10, 1997, Contact: 
    Alfred Lebeau (215) 656-6900.
    EIS No. 960537, FINAL EIS, FHW, CA, Arden Garden Connector Project, 
    Arden Way in North Sacramento to Garden Highway in South Natomas across 
    the Natomas East Main Drainage Canal, Funding, Sacramento County, CA, 
    Due: December 23, 1996, Contact: John R. Schultz (916) 498-5041.
    EIS No. 960538, FINAL EIS, USN, Naval Spent Nuclear Fuel Container 
    System Management, Loading, Handling and Dry Storage, Transportation 
    and Storage, Handling and Transportation of certain Associated 
    Radioactive Waste, Implementation, United States, Due: December 23, 
    1996, Contact: William Knoll (703) 602-8229.
    EIS No. 960539, FINAL EIS, DOE, Adoption--Naval Spent Nuclear Fuel 
    Container System Management, Loading, Handling and Dry Storage, 
    Transportation and Storage, Handling and Transportation of certain 
    Associated Radioactive Waste, Implementation, United States, Due: 
    December 23, 1996, Contact: William Knoll (703) 602-8229. The US 
    Department of Energy (DOE), has adopted the US Department of the Navy's 
    FEIS #960538, filed with the Environmental Protection Agency on 11-15-
    96. DOE is a cooperating agency on this project. Recirculation of the 
    document is not necessary under Section 1506.3(c) of the Council on 
    Environmental Quality Regulations.
    EIS No. 960540, DRAFT EIS, COE, IA, Channel Maintenance Management 
    Plan, Implementation, 9-Foot Navigation Channel Project, Upper 
    Mississippi River, Guttenberg, IA, Due: January 21, 1997, Contact: 
    Robert Whiting (612) 290-5264.
    EIS No. 960541, FINAL EIS, BIA, NM, Jemez Mountains Electric 
    Cooperative, Construction, Operation and Maintain, El Rancho 
    Substation, Sante Fe County, NM, Due: December 23, 1996, Contact: 
    Curtis Canard (505) 766-3374.
    
    Amended Notices
    
    EIS No. 960359, DRAFT EIS, BLM, ID, Challis Land and Resource 
    Management Plan, Implementation, Upper Columbus--Salmon Clearwater 
    Districts, Salmon River, Lemhi and Custer Counties, ID, Due: January 
    06, 1997, Contact: Kathe Rhodes (208) 756-5440.
    Published FR 08-09-96--Review Period Extended.
    EIS No. 960403, DRAFT EIS, NPS, MA, Cape Cod National Seashore General 
    Management Plan, Implementation, Barnstable County, MA, Due: November 
    30, 1996, Contact: Maria Burks (508) 349-3785.
    Published FR--09-06-96--Review Period Extended.
    EIS No. 960459, DRAFT EIS, FAA, MO, Lambert-St. Louis International 
    Airport (Lambert) Improvements, Construction and Operation, Airport 
    Layout Plan Approval, City of St. Louis, St. Louis County, MO , Due: 
    December 18, 1996, Contact: Ms. Moira Keane (816) 426-4731.
    Published FR--10-04-96--Review Period extended.
    EIS No. 960482, DRAFT EIS, NPS, WA, Lake Crescent Management Plan, 
    Implementation, Olympic National Park, WA , Due: February 03, 1997, 
    Contact: Joe Dunstan (206) 220-4273.
    Published FR--10-18-96--Review Period Extended.
    EIS No. 960503, DRAFT EIS, FTA, TX, North Central Corridor Light Rail 
    Transit (LRT) Extension, Transportation Improvements, Funding, NPDES 
    Permit and COE Section 404 Permit, Dallas and Collin Counties, TX , 
    Due: December 09, 1996, Contact: Jesse Balleza (817) 860-9663.
    Published FR--10-25-96 Correction to Telephone Number.
    EIS No. 960519, DRAFT EIS, UAF, CA, NM, Airborne Laser (ABL) Phase 
    Program Definition and Risk Reduction Phase, Proposed Locations: Home 
    Base Edwards Air Force Base; Diagnostic Test Range--White Sands Missile 
    Range, NM; and Expanded Area Test Range--Western Range (Vandenberg Air 
    Force Base and Point Mugu Naval Air Warfare Center Weapons Division), 
    CA and NM, Due: January 10, 1997, Contact: Major Kark Freeks (703) 695-
    8942.
    Published FR--11-08-96--Correction to EIS Titled and Due Dated.
    EIS No. 960523, FINAL EIS, COE, FL, Coast of Florida Erosion and Storm 
    Effects Study Region III, Construction, Operation and Maintenance, 
    Shore Protection Project, Palm Beach, Broward and Dade Counties, FL, 
    Due: December 16, 1996, Contact: Michael Dupes (904) 232-1689.
    Published FR--11-15-96--Due Date Correction.
    EIS No. 960524, FINAL EIS, AFS, CA, Snowy Trail Off-Highway Vehicle Re-
    Route, Smith Fork Parcel of Los Padres National Forest, Approval and
    
    [[Page 59436]]
    
    Implementation, Mount Pinos Ranger District, Ventura County, CA, Due: 
    December 16, 1996, Contact: Mark Bethke (805) 245-3731.
    Published FR--11-15-96--Due Date Correction.
    EIS No. 960529, FINAL EIS, FRC, WA, Cushman Hydroelectric Project (FERC 
    No. 460), Relicensing, North Fork Skokomish River, Mason County, WA, 
    Due: December 16, 1996, Contact: John Blair (202) 219-2845.
    Published FR--11-15-96 Due Date Correction.
    EIS No. 960531, FINAL EIS, DOE, TN, GA, TX, SC, MO, Programmatic EIS- 
    Stockpile Stewardship and Management Project, Reduced Nuclear Weapons 
    Stockpile in the Absence of Undergound Testing, Eight Sites: Oak Ridge 
    Reservation (ORR), Savannah River Site (SRS), Kansas City Plant (KCP) 
    Pantex Plant, Los Alamos Nat'l Lab., Lawrence Livermore Nat'l Lab., 
    Sandia Nat'l and Nevada Test, Due: December 16, 1996, Contact: Alfred 
    W. Feldt (202) 586-5449.
    Published FR--11-15-96--Due Date Correction.
    
        Dated: November 19, 1996.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 96-29917 Filed 11-21-96; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Published:
11/22/1996
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
96-29917
Pages:
59435-59436 (2 pages)
Docket Numbers:
ER-FRL-5475-1
PDF File:
96-29917.pdf