November 16, 1995.
Take notice that on November 13, 1995, El Paso Natural Gas Company
(El Paso), submitted for filing schedules detailing the flow-through of
GRI over-collections for the period January 1, 1994 through June 30,
1995.
El Paso states that the purpose of this filing is to comply with
the Commission's October 31, 1995, order at Docket No. RP95-325-000
which conditionally accepted El Paso's May 31, 1995, filing and
required El Paso to file revised schedules within fifteen days of the
order that allocated the GRI over-collections solely to Releasing
Shippers.
El Paso states that on November 7, 1995, El Paso distributed to the
affected Releasing Shippers over-collections received from GRI
totalling $2,667,623.41, consisting of $1,848,012.51 attributable to
GRI over-collections for the calendar year 1994 and $819,610.90
attributable to GRI over-collections for the period January 1, 1995
through June 30, 1995.
Any person desiring to protest said filing should file a protest
with the Federal Energy Regulatory Commission, 888 First Street, N.E.,
Washington, D.C. 20426, in accordance with Section 385.211 of the
Commission's Rules and Regulations. All such protests should be filed
on or before November 24, 1995. Protests will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to the proceeding. Copies of this
filing are on file with the Commission and are available for public
inspection in the Public Reference Room.
Lois D. Cashell,
Secretary.
[FR Doc. 95-28568 Filed 11-22-95; 8:45 am]