[Federal Register Volume 60, Number 226 (Friday, November 24, 1995)]
[Notices]
[Pages 58090-58091]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-28676]
-----------------------------------------------------------------------
[[Page 58091]]
DEPARTMENT OF THE INTERIOR
[CA-020-5101-10-B039; CACA-31406, NVN-57250]
Notice of Availability of a Final Environmental Impact Statement
AGENCY: Bureau of Land Management, Interior, Susanville District
Office, California.
SUMMARY: The Bureau of Land Management (BLM) and the California Public
Utilities Commission (CPUC) have prepared a final Environmental Impact
Report/Statement (EIR/S) for the Alturas 345 kilovolt (KV) transmission
line project proposed by Sierra Pacific Power Company (SPPCo) in BLM
application number CACA-31406. The final EIR/S has been prepared to
satisfy the requirements of the National Environmental Policy Act and
the California Environmental Quality Act.
The BLM and CPUC believe that approval of the proposed project,
with appropriate mitigation measures, has the potential to
significantly impact the environment. The final EIR/S includes an
evaluation of the proposed project. The final EIR/S assesses the
environmental impacts of the approval, construction, operation and
maintenance of a 345KV overhead electric power transmission line
approximately 165 miles long, from the vicinity of Alturas, California
through Modoc, Lassen, and Sierra Counties, California, through Washoe
County, Nevada to the vicinity of Reno, Nevada. The proposed project
would affect Federal, State and private lands. The proposed project
also includes the construction of two new electrical substations, one
northwest of Alturas and one in Sierra County, California, just west of
Border Town, Nevada, and the expansion of SPPCo's existing North Valley
Road Substation.
The final EIR/S responds to public and agency comments received on
the draft EIR/S. The final EIR/S has been placed in the public files of
the CPUC and the BLM, and is available for public inspection at:
California Public Utilities Commission, Central Files, 505 Van Ness
Avenue, San Francisco, CA 94102, (415) 703-2045
Bureau of Land Management, Susanville District Office, 705 Hall Street,
Susanville, CA 96130, (916) 257-5381
Copies of the final EIR/S are also available for inspection at BLM
offices in Alturas and Susanville, California, in Carson City, Nevada,
and Washington, D.C.; at the Modoc National Forest in Alturas and the
Toiyabe National Forest in Sparks, NV; at public libraries in Alturas,
Susanville and Reno, and at the City Hall in Loyalton. Copies have also
been sent to interested Federal, State and local agencies, as well as
interested groups and individuals. An Executive Summary of the key
issues and impacts addressed in the EIR/S will be available upon
request.
DATES and addresses: Request for the Executive Summary should be
addressed to: Peter Humm, Project Manager; Bureau of Land Management;
705 Hall Street, Susanville, California 96130.
FOR FURTHER INFORMATION CONTACT:
This Federal Notice of Availability of a Final EIR/S is issued by the
Eagle Lake Area Manager, Bureau of Land Management, 705 Hall Street,
Susanville, California 96130. For further information write to the Area
Manager or call Peter Humm, BLM Project Manager, at (916) 257-0456.
Dated: November 13, 1995.
Linda D. Hansen,
Area Manager.
[FR Doc. 95-28676 Filed 11-22-95; 8:45 am]
BILLING CODE 4310-40-M