95-28713. Sinclair Inlet, Puget Sound, Bremerton, Washington, Naval Restricted Areas; Correction  

  • [Federal Register Volume 60, Number 226 (Friday, November 24, 1995)]
    [Rules and Regulations]
    [Pages 57934-57935]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-28713]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF DEFENSE
    Corps of Engineers, Department of the Army
    
    33 CFR Part 334
    
    
    Sinclair Inlet, Puget Sound, Bremerton, Washington, Naval 
    Restricted Areas; Correction
    
    AGENCY: U.S. Army Corps of Engineers, DoD.
    
    ACTION: Correction to interim final rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: This document contains a correction to the interim final rule 
    which was published Monday, August 21, 1995 (60 FR 43378-43379). The 
    effective date was August 21, 1995, with the comment period expiring on 
    October 20, 1995. These rules establish two restricted areas in the 
    waters of Sinclair Inlet adjacent to the Puget Sound Naval Shipyard, 
    Bremerton, Washington, to safeguard U.S. Navy vessels and Government 
    facilities from sabotage and other subversive acts, accidents, or other 
    incidents of a similar nature and to protect vessels and individuals 
    from the dangers associated with the industrial waterfront facilities 
    at the shipyard. Entry into this zone is prohibited unless otherwise 
    authorized by these regulations or the Commander, Naval Base Seattle, 
    Washington, or whomever he/she designates.
    
    DATES: Effective November 24, 1995.
    
    ADDRESSES: HQUSACE, CECW-OR, Washington, DC 20314-1000.
    
    FOR FURTHER INFORMATION CONTACT: Mr. Jonathan Freedom, Regulatory 
    Branch, Seattle District at (206) 764-3495, or Mr. Ralph Eppard, 
    Regulatory Branch, CECW-OR at (202) 761-1783.
    
    SUPPLEMENTARY INFORMATION: As a result of a court decision affecting 
    the regulations in 33 CFR 334.1240, the Commanding Officer, Puget Sound 
    Naval Shipyard reviewed the physical security and safety conditions 
    around the shipyard active piers and drydocks. Based on this review, 
    the Commanding Officer requested that the restricted area regulations 
    be amended to prohibit the trespassing of persons into the restricted 
    areas at Sinclair Inlet; add a coordinate to a accommodate the 
    extension of the south end of ``mooring A'' maintaining a buffer 100 
    yards south of the end of this mooring, and to change the geographic 
    coordinates for the restricted area to conform to the 1983 re-
    establishment of the National Geodetic Vertical Datum. These revisions 
    were published by the Corps as interim final rules on August 21, 1995. 
    All comments received in response to the interim final rule and the 
    public notice issued by the Seattle District Engineer are being 
    reviewed.
    
    [[Page 57935]]
    
    
    Need for Correction
    
        As published, the interim final rules in Sec. 334.1240(a)(3)(ii) 
    omitted the words ``Area No. 2.'' at the beginning of the subparagraph. 
    This correction clarifies that Area number two is for the exclusive use 
    of the U.S. Navy.
    
    Correction of Publication
    
        Accordingly, the publication on August 21, 1995 of the interim 
    final rule, which was the subject of 60 FR 43378-43379, is corrected as 
    follows:
    
    
    Sec. 334.1240  [Corrected]
    
        On page 43379, in Sec. 334.1240(a)(3)(ii) in the third column, in 
    the first line following paragraph designation (ii), insert ``Area No. 
    2.''.
    
        Dated: November 13, 1995.
    Stanley G. Genega,
    Major General, USA, Director of Civil Works.
    [FR Doc. 95-28713 Filed 11-22-95; 8:45 am]
    BILLING CODE 3710-92-M
    
    

Document Information

Effective Date:
11/24/1995
Published:
11/24/1995
Department:
Engineers Corps
Entry Type:
Rule
Action:
Correction to interim final rule.
Document Number:
95-28713
Dates:
Effective November 24, 1995.
Pages:
57934-57935 (2 pages)
PDF File:
95-28713.pdf
CFR: (1)
33 CFR 334.1240