97-30742. Northern Border Pipeline Company; Notice of Application  

  • [Federal Register Volume 62, Number 226 (Monday, November 24, 1997)]
    [Notices]
    [Page 62580]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-30742]
    
    
    
    [[Page 62580]]
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-77-000]
    
    
    Northern Border Pipeline Company; Notice of Application
    
    November 18, 1997.
        Take notice that on November 12, 1997, Northern Border Pipeline 
    Company (Northern Border), 1111 South 103rd Street, Omaha, Nebraska 
    68124, filed in Docket No. CP98-77-000 an abbreviated application 
    pursuant to Section 7(c) of the Natural Gas Act and Sections 157.14 and 
    157.16 of the Commission's Regulations for a certificate of public 
    convenience and necessity authorizing the acquisition and operation of 
    certain meter facilities in Minnesota.
        Specifically, Northern Border seeks to acquire the Windom 
    measurement station from Northwest Gas of Cottonwood County, LLC 
    (Northwest Gas). The Windom measurement station, which is located in 
    Section 17, Township 105N, Range 35W, Cottonwood County, Minnesota, 
    comprises the following facilities:
        (1) one 4-inch turbine meter and associated piping;
        (2) one 2-inch rotary meter and associated piping;
        (3) approximately 110 feet of 4-inch pipe;
        (4) remote terminal unit; and
        (5) meter and control buildings, and appurtenances.
        Northern Border states that Northwest Gas no longer desires to 
    operate the measurement station and will transfer it to Northern Border 
    for a nominal fee. Northwest Gas will pay Northern Border $46,633 for 
    the negative cashflow that Northern Border states it will experience as 
    a result of the timing of income tax liability incurred in acquiring 
    the Windom measurement station.
        Any person desiring to participate in the hearing process or to 
    make any protest with reference to said application should on or before 
    December 9, 1997, file with the Federal Energy Regulatory Commission, 
    888 First Street, N.E., Washington, D.C. 20426, a motion to intervene 
    or a protest in accordance with the requirements of the Commission's 
    Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the 
    Regulations under the Natural Gas Act (18 CFR 157.10). All protests 
    filed with the Commission will be considered by it in determining the 
    appropriate action to be taken but will not serve to make the 
    protestants parties to the proceeding. The Commission's rules require 
    that protestors provide copies of their protests to the party or 
    parties directly involved. Any person wishing to become a party to a 
    proceeding or to participate as a party in any hearing therein must 
    file a motion to intervene in accordance with the Commission's Rules.
        A person obtaining intervenor status will be placed on the service 
    list maintained by the Secretary of the Commission and will receive 
    copies of all documents filed by the applicant and by every one of the 
    intervenors. An intervenor can file for rehearing of any Commission 
    order and can petition for court review of any such order. However, an 
    intervenor must submit copies of comments or any other filing it makes 
    with the Commission to every other intervenor in the proceeding, as 
    well as 14 copies with the Commission.
        A person does not have to intervene, however, in order to have 
    comments considered. A person, instead, may submit two copies of 
    comments to the Secretary of the Commission. Commenters will be placed 
    on the Commission's environmental mailing list, will receive copies of 
    environmental documents and will be able to participate in meetings 
    associated with the Commission's environmental review process. 
    Commenters will not be required to serve copies of filed documents on 
    all other parties. However, commenters will not receive copies of all 
    documents filed by other parties or issued by the Commission and will 
    not have the right to seek rehearing or appeal the Commission's final 
    order to a federal court.
        The Commission will consider all comments and concerns equally, 
    whether filed by commenters or those requesting intervenor status.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application if no motion to intervene is filed within the time 
    required herein, if the Commission on its own review of the matter 
    finds that a grant of the certificate is required by the public 
    convenience and necessity. If a motion for leave to intervene is timely 
    filed, or if the Commission on its own motion believes that a formal 
    hearing is required, further notice of such hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for Northern Border to appear or be represented 
    at the hearing.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-30742 Filed 11-21-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/24/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-30742
Pages:
62580-62580 (1 pages)
Docket Numbers:
Docket No. CP98-77-000
PDF File:
97-30742.pdf