98-31373. Drawbridge Operation Regulations; New Jersey Intracoastal Waterway; Grassy Sound Channel  

  • [Federal Register Volume 63, Number 226 (Tuesday, November 24, 1998)]
    [Rules and Regulations]
    [Page 64868]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-31373]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Coast Guard
    
    33 CFR Part 117
    
    [CGD05-98-097]
    
    
    Drawbridge Operation Regulations; New Jersey Intracoastal 
    Waterway; Grassy Sound Channel
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Notice of temporary deviation from regulations.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Commander, Fifth Coast Guard District has issued a 
    temporary deviation from the regulations governing the operation of the 
    Route 47 (George A. Reading) Bridge across the Intracoastal Waterway 
    (ICW), mile 108.9, in Wildwood, New Jersey. Beginning at 7 a.m. on 
    December 4, through 7 a.m. on December 6, 1998, the bridge will be 
    maintained in the closed position. This closure is necessary to 
    facilitate demolition and reconstruction of the bridge's bascule span.
    
    DATES: This deviation is effective from 7 a.m. on December 4, 1998 
    until 7 a.m. on December 6, 1998.
    
    FOR FURTHER INFORMATION CONTACT:
    Ann B. Deaton, Bridge Administrator, Fifth Coast Guard District, at 
    (757) 398-6222.
    
    SUPPLEMENTARY INFORMATION: On October 9, 1998, the Coast Guard 
    published a Temporary Final Rule entitled ``Drawbridge Operation 
    Regulations; New Jersey Intracoastal Waterway; Grassy Sound Channel'' 
    in the Federal Register (63 FR 54353). That regulation, effective from 
    October 19, 1998 to 5 p.m. on May 14, 1999, requires two-hours advance 
    notice for bridge openings 24 hours a day to allow the contractor to 
    facilitate sandblasting and painting operations.
        On November 4, 1998, a letter was forwarded to the Coast Guard by 
    the contractor requesting a temporary deviation from the current 
    operation of the bridge. The proposed bridge work will involve the 
    demolition and reconstruction of the bridge deck and superstructure, 
    thereby immobilizing the operation of the bascule span entirely. 
    Additionally, tugboats, cranes, and barges positioned at the site may 
    impede vessel traffic that could pass under the bridge.
        The Coast Guard has informed the known commercial users of the 
    waterway of the bridge closure so that these vessels can arrange their 
    transits to avoid being negatively impacted by the temporary deviation.
        From 7 a.m. on December 4, until 7 a.m. on December 6, 1998, this 
    deviation allows the Route 47 (George A. Reading) Bridge across Grassy 
    Sound Channel, ICW mile 108.9 at Wildwood, to remain closed.
    
        Dated: November 13, 1998.
    Roger T. Rufe, Jr.,
    Vice Admiral, U.S. Coast Guard Commander, Fifth Coast Guard District.
    [FR Doc. 98-31373 Filed 11-23-98; 8:45 am]
    BILLING CODE 4910-15-M
    
    
    

Document Information

Effective Date:
12/4/1998
Published:
11/24/1998
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
98-31373
Dates:
This deviation is effective from 7 a.m. on December 4, 1998 until 7 a.m. on December 6, 1998.
Pages:
64868-64868 (1 pages)
Docket Numbers:
CGD05-98-097
PDF File:
98-31373.pdf
CFR: (1)
33 CFR 117